›› 2016, Vol. 37 ›› Issue (S2): 788-794.doi: 10.16285/j.rsm.2016.S2.100

• 测试技术 • 上一篇    

盾构施工地表沉降自动化监测及数据移动发布系统

谢雄耀1, 2,李 军1, 2,王 强1, 2   

  1. 1. 同济大学 岩土及地下工程教育部重点实验室,上海 200092;2. 同济大学 地下建筑与工程系,上海 200092
  • 收稿日期:2016-04-02 出版日期:2016-11-11 发布日期:2018-06-09
  • 作者简介:谢雄耀,男,1972年生,博士,教授,博士生导师,主要从事隧道与地下工程健康检测、风险与防灾方面的教学与研究工作。
  • 基金资助:
    国家自然科学基金(No.41372273);上海市科学技术委员会重点项目(No.14231200602,No.15DZ1203800);广西科学研究与技术开发计划项目(No.2015BC17047)。

Automatic monitoring and mobile data publishing system of ground settlement induced by shield tunneling

XIE Xiong-yao1, 2, LI Jun1, 2, WANG Qiang1, 2   

  1. 1. Key Laboratory of Geotechnical and Underground of Ministry of Education, Tongji University, Shanghai 200092, China; 2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China
  • Received:2016-04-02 Online:2016-11-11 Published:2018-06-09
  • Supported by:
    This work was supported by the National Natural Science Foundation of China (41372273), the Key Program of Shanghai Science and Technology Committee (14231200602, 15DZ1203800), and the Projects of Science Research and Technology Development of Guangxi (2015BC17047).

摘要: 地表沉降监测是盾构信息化施工的重要组成部分,对优化盾构施工参数,保证施工安全具有十分重要的意义。为了及时共享和反馈监测成果,提高监测信息管理与数据分析的效率,采用Microsoft Visual Studio .Net编程技术和MySQL数据库开发了沉降自动化监测及数据移动发布系统,实现了24 h监测数据的自动化采集、分析和移动端推送,并将该系统应用于南宁轨道交通1号线盾构隧道下穿南宁火车站铁路股道及站房工程,获得盾构推进过程中的地表沉降及火车轨道沉降的变化规律。通过监测数据和分析成果的及时反馈,优化了盾构机施工参数,有效保证了盾构掘进和周边环境的安全。

关键词: 盾构施工, 自动化监测, 反馈控制, 移动发布

Abstract: Ground settlement monitoring is an important component of shield informatization construction, and it has a very important significance in optimization of shield tunneling parameters and safety of construction. In order to share and feedback monitoring results timely, improve efficiency of monitoring information management and data analysis, an automatic monitoring and mobile data publishing system of ground settlement is developed by using Microsoft Visual Studio. Net programming technology and MySQL database to realize 24 hour automatic acquiring, analysis and mobile publishing of monitoring data. And then the system is applied to the project of shield tunneling of Nanning Metro Line 1 traversing below tracks and buildings of Nanning Railway Station; the variation law of ground and track settlement caused by shield tunneling has been obtained. By the in-time feedback of monitoring data and analysis results, the construction parameters of shield machine is optimized so as to effectively ensure safety of shield tunneling and surrounding environment.

Key words: shield construction, automatic monitoring, feedback control, mobile publishing

中图分类号: 

  • U 452
[1] 王忠凯, 徐光黎. 盾构掘进、离开施工阶段对地表变形的 影响范围及量化预测[J]. 岩土力学, 2020, 41(1): 285-294.
[2] 郑 帅, 姜谙男, 张峰瑞, 张勇, 申发义, 姜旭东、. 基于机器学习与可靠度算法的围岩动态分级方法 及其工程应用[J]. 岩土力学, 2019, 40(S1): 308-318.
[3] 郭 飞,陶连金,孔 恒,马红红,张丽丽,张新全,. 兰州砂卵石地层盾构施工振动传播及衰减特性分析[J]. , 2018, 39(9): 3377-3384.
[4] 黄晓康,卢坤林,朱大勇, . 盾构施工对不同位置地下管线变形的影响模拟试验研究[J]. , 2017, 38(S1): 123-130.
[5] 姜忻良,李 林,袁 杰,殷加顺. 深层地铁盾构施工地层水平位移动态分析[J]. , 2011, 32(4): 1186-1192.
[6] 朱才辉,李 宁,柳厚祥,张志强. 盾构施工工艺诱发地表沉降规律浅析[J]. , 2011, 32(1): 158-164.
[7] 王 浩,覃卫民,焦玉勇. 浅埋大跨隧道下穿建筑物群的施工期安全风险管理[J]. , 2010, 31(S1): 310-316.
[8] 章慧健,仇文革,冯冀蒙,郑余朝,龚 伦. 近距离重叠隧道盾构施工的纵向效应及对策研究[J]. , 2010, 31(11): 3569-3573.
[9] 李兴高,袁大军,杨全亮. 盾构施工典型故障诊断初步研究[J]. , 2009, 30(S2): 377-381.
[10] 齐静静,徐日庆,魏 纲. 盾构施工引起土体三维变形的计算方法研究[J]. , 2009, 30(8): 2442-2446.
[11] 毕继红,刘 伟,江志峰. 隧道开挖对地下管线的影响分析[J]. , 2006, 27(8): 1317-1321.