TST技术在岩溶地区隧道超前预报中的应用

肖启航1,谢朝娟2   

  1. 1.西南交通大学 土木工程学院,成都 610031;2.成都理工大学 旅游与城乡规划学院,成都 610059
  • 收稿日期:2010-03-15 出版日期:2012-05-10 发布日期:2012-05-14
  • 作者简介:肖启航,男,1980年生,博士,高级工程师,主要从事土木工程方面的研究工作。

Application of tunnel seismic tomography to tunnel prediction in karst area

XIAO Qi-hang1, XIE Chao-juan2   

  1. 1. College of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China; 2. College of Tourism and Urban-Rural Planning, Chengdu University of Technology, Chengdu 610059, China
  • Received:2010-03-15 Online:2012-05-10 Published:2012-05-14

摘要: 顶效隧道位于岩溶发育地区,地质构造复杂,岩体破碎,对超前预报技术的要求高,风险较大。目前国内外应用的隧道超前预报技术多数都存在着技术缺陷,不能区分不同方向的地震回波,不能准确地确定掌子面前方围岩的波速,不能正确地进行纵横波分离等问题,影响到预报的可靠性和准确性。为了确保施工安全,减少和避免地质灾害发生,顶效隧道超前预报中采用了TST技术。应用结果表明,TST技术采用空间阵列系统和速度扫描技术有效地解决了掌子面前方围岩速度分布问题,提高了构造定位精度;应用二维方向滤波技术有效地消除了上下、左右的侧向回波和面波干扰,成功提取了前方回波用于超前预报,避免了虚报误报,解决了复杂地质条件下的超前预报问题。

关键词: 隧道超前预报, 速度扫描, 频率-波数滤波, 隧道地震波成像(TST), 隧道地震波超前预报(TSP), 隧道地质超前预报(TGP), 隧道层析成像(TRT)

Abstract: Dingxiao Tunnel is located at the karsts area in Guizhou province; in which the geological structure is very complicated and full of crushing rocks. All these bring high risk in tunnel excavation; and its tunnel geological prediction work faces great difficulty. Currently there are several tunnel geological prediction techniques, but most of them have three major issues. First, they did not differentiate the echo seismic waves from individual directions; it assumes all the seismic waves come from the front tunnel face. Second, they can not calculate the rock velocity in the front tunnel face. Third, they cannot separate p wave and s wave correctly. So the result cannot be accurate and reliability. For safety and efficiency, a new tunnel geological prediction technique, the tunnel seismic tomography(TST) is adopted in Dingxiao tunnel. TST utilizes spatial observation, F-K filtering and velocity scan techniques which solved all the issues indicated above. The function of spatial observation and velocity scan in TST gives precise velocity analyzing and enabled accurate geological structure locating. The F-K filtering function of TST gets rid of the surface wave and sidewise echo wave, only uses the wave coming back from front.

Key words: tunnel prediction, velocity scanning, F-K filter, tunnel seismic tomography (TST), tunnel seismic prediction (TSP), tunnel geology prediction (TGP), tunnel reflection tomography (TRT)

中图分类号: 

  • U 419.1
[1] 梁 燕 ,邢鲜丽 ,李同录 ,徐 平 ,刘树林 . 晚更新世黄土渗透性的各向异性及其机制研究[J]. , 2012, 33(5): 1313-1318.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] 崔皓东,朱岳明. 二滩高拱坝坝基渗流场的反演分析[J]. , 2009, 30(10): 3194 -3199 .
[2] 赵洪宝,尹光志,李小双. 烧变后粗砂岩抗拉特性试验研究[J]. , 2010, 31(4): 1143 -1146 .
[3] 何思明,吴 永,李新坡. 嵌岩抗拔桩作用机制研究[J]. , 2009, 30(2): 333 -337 .
[4] 况雨春,伍开松,杨迎新,马德坤. 三牙轮钻头破岩过程计算机仿真模型[J]. , 2009, 30(S1): 235 -238 .
[5] 杜文琪,王 刚. 土工结构地震滑动位移统计分析[J]. , 2011, 32(S1): 520 -0525 .
[6] 鄢治华,刘志伟,刘厚健. 黄河阶地上某电厂高边坡参数选取及其工程治理[J]. , 2009, 30(S2): 465 -468 .
[7] 许振浩 ,李术才 ,李利平 ,侯建刚 ,隋 斌 ,石少帅. 基于层次分析法的岩溶隧道突水突泥风险评估[J]. , 2011, 32(6): 1757 -1766 .
[8] 温世清 ,刘汉龙 ,陈育民. 浆固碎石桩单桩荷载传递特性研究[J]. , 2011, 32(12): 3637 -3641 .
[9] 李顺群 ,高凌霞 ,柴寿喜. 冻土力学性质影响因素的显著性和交互作用研究[J]. , 2012, 33(4): 1173 -1177 .
[10] 钟 声 ,王川婴 ,吴立新 ,唐新建 ,王清远. 点状不良地质体钻孔雷达响应特征 ——围岩及充填效应正演分析[J]. , 2012, 33(4): 1191 -1195 .