›› 2008, Vol. 29 ›› Issue (4): 989-994.

• 基础理论与实验研究 • 上一篇    下一篇

扁平大跨度公路隧道松动荷载计算方法探讨

曲海锋1,2,朱合华1,3,蔡永昌1,3   

  1. 1. 同济大学地下建筑与工程系, 上海 200092;2.上海投资咨询公司,上海 200003; 3. 同济大学岩土工程重点实验室, 上海 200092
  • 收稿日期:2006-05-15 出版日期:2008-04-10 发布日期:2013-07-10
  • 作者简介:曲海锋,男,1978年生,博士,主要从事公路隧道设计、优化;工程咨询等方面的研究工作。
  • 基金资助:

    国家自然科学基金资助(NO. 40672184)

Discussion on calculation of loose load on extra-large cross-section and large-span road tunnel

QU Hai-feng1.2, ZHU He-hua1.3, CAI Yong-chang1,3   

  1. 1. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 2.Shanghai Investment Consulting Corporation, Shanghai 200003, China; 3. Key Laboratory of Geotechnical Engineering, Tongji University, Shanghai 200092, China
  • Received:2006-05-15 Online:2008-04-10 Published:2013-07-10

摘要: 确定松动荷载的方法多为规范法和理论公式法,这些方法都建立在对以往隧道松动荷载统计和分析的基础上。双洞八车道扁平大跨度公路隧道是近几年发展起来的一种隧道形式。由于其跨度增加、扁平率降低,现有松动荷载的算方法是否适用于双洞八车道公路隧道,已成为隧道建设者面对的重要问题之一。以广州龙头山双洞八车道公路隧道为研究背景,概括和总结了各种松动荷载的计算方法;应用这些方法计算龙头山隧道的松动压力,分析和对比计算结果,并通过数值计算和实测围岩压力对各种方法的合理性进行了分析;根据各种方法的产生背景和内容,分析其各自的适用性;根据研究结果,对扁平大跨度公路隧道进行了适应性分析和讨论。

Abstract: Theory equations and norm equations are primary methods to calculate loose load of tunnel. They are established based on the statistic and analysis of loose load from finished tunnels in general. With the development of road tunnel construction, the two-way and large-span road tunnel with eight-lane in either way become a new shape in recent years. The eight-lane tunnel has an increase in excavation area and a decrease in excavation height relatively for the aim of curtailing the cost of construction and has a smaller ratio of height to width. For this reason, current calculation method of loose load whether or not apply to barge-span tunnel has been significant for tunnel design. In this paper, firstly, various calculation methods are summarized and applied to Longtoushan Road Tunnel with eight-lane and barge-span. And then, calculation results are analyzed and compared. Secondly, rationality of calculation methods for Longtoushan Tunnel is analyzed based on numerical calculation and measured data. Finally, the paper presents and discusses applicability of various methods, especially for the eight-lane and barge-span tunnel, based on its own background and above study course. The purpose of the article is to provide reference for the design of extra-large cross-section and barge-span road tunnel.

Key words: extra-large cross-section and large-span, road tunnel, loose load, applicability

中图分类号: 

  • TU 451+.2
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] 程 涛,晏克勤. 应力路径对地表变形特性影响的数值模拟[J]. , 2010, 31(2): 661 -666 .
[2] 关云飞,高 峰,赵维炳,俞 缙. ANSYS软件中修正剑桥模型的二次开发[J]. , 2010, 31(3): 976 -980 .
[3] 米海珍,高 春. 生石灰膨胀特性的试验研究[J]. , 2010, 31(4): 1253 -1256 .
[4] 何先龙,赵立珍. 基于多重互相关函数分析剪切波速[J]. , 2010, 31(8): 2541 -2545 .
[5] 张玉成,杨光华,姜 燕,姚 捷,史永胜. 沉管隧道基槽爆破施工对既有堤岸稳定性影响的数值仿真分析[J]. , 2010, 31(S1): 349 -356 .
[6] 张卢明,郑明新,何 敏. 滑坡防治前后滑带土基质吸力特征研究[J]. , 2010, 31(10): 3305 -3312 .
[7] 陈敬虞,龚晓南,邓亚虹. 软黏土层一维有限应变固结的超静孔压消散研究[J]. , 2009, 30(1): 191 -195 .
[8] 孙 建 ,王连国 ,唐芙蓉 ,沈义峰 ,龚世龙. 倾斜煤层底板破坏特征的微震监测[J]. , 2011, 32(5): 1589 -1595 .
[9] 徐正明,薛 强,赵 颖. 改性污泥复合材料时间效应三轴力学特性试验研究[J]. , 2011, 32(6): 1713 -1718 .
[10] 崔 溦,宋慧芳,张社荣,闫澍旺. 爆炸荷载作用下土中爆坑形成的数值模拟[J]. , 2011, 32(8): 2523 -2528 .