›› 2014, Vol. 35 ›› Issue (4): 1095-1100.

• 岩土工程研究 • 上一篇    下一篇

基于浪蚀龛和土体临界高度的修正的卡丘金法及其工程应用

陈洪凯1,赵先涛1,唐红梅1,曾云松2,吕 韬2   

  1. 1. 重庆交通大学 岩土工程研究所,重庆 400074;2. 重庆市地勘局南江水文地质工程地质队,重庆 401147
  • 收稿日期:2013-01-15 出版日期:2014-04-10 发布日期:2014-04-18
  • 作者简介:陈洪凯,男,1964年生,博士,教授,博士生导师,主要从事灾害地貌(危岩崩塌、滑坡、泥石流)形成、演绎与控制方面的研究工作。
  • 基金资助:

    国家自然科学基金项目(No. 41071017);重庆市重点自然科学基金项目(No. 2012BA0015);重庆市国土局科技项目(No. 20110107)

Modified Kachugin method based on wave cut notch and critical height of soil and its engineering application

CHEN Hong-kai1,ZHAO Xian-tao1,TANG Hong-mei1,ZENG Yun-song2,LÜ Tao2   

  1. 1. Institute of Geotechnical Engineering, Chongqing Jiaotong University, Chongqing 400074, China; 2. Nanjiang Hydrogeologic Team, Chongqing Geological Engineering Investigation Institute, Chongqing 401147, China
  • Received:2013-01-15 Online:2014-04-10 Published:2014-04-18

摘要: 水库运行期间库岸再造预测是工程地质领域的重要和热门研究课题之一。基于卡丘金法采用半经验性、半定量的模式,简化了水文地质条件的影响,并忽略了波浪对库岸的掏蚀作用等缺陷,针对土质岸坡,提出了基于浪蚀龛和土体临界高度的卡丘金修正法;建立了库岸再造稳定时限估算方法;并采用极限平衡法、卡丘金法和构建的土质岸坡再造预测方法对三峡库区奉节白马港岸坡进行了塌岸预测。计算结果表明,修正的卡丘金法的计算结果与其他两种预测方法相比偏小,但偏差在8.05 m以内,并通过现阶段库岸地质调查表明,预测结果比较符合实情。研究成果对库岸区域土地资源开发利用及防灾减灾具有积极意义。

关键词: 卡丘金修正法, 浪蚀龛, 土体临界高度, 库岸再造稳定时限, 土质岸坡

Abstract: Research on rebuilding prediction of bank slope during the operation of reservoir is one of the important and hot topics in engineering geology field. In light of defects of Kachugin method applied to bank collapse prediction on soil bank slope including using semi-empirical, semi-quantitative model, simplifying the influence of hydrogeological conditions and ignoring the effect of wave erosion on bottom of bank slope, a modified Kachugin method based on wave cut notch and critical height of soil is put forward. Estimation method for stability time limit of soil bank slope rebuilding is established. Limit equilibrium method and Kachugin method and the bank slope rebuilding prediction method are used in bank collapse prediction of Baima harbor bank slope at Fengjie in the Three Gorges Reservoir. The calculation results show that the result of modified Kachugin method is small than one by other two kinds of prediction methods; and the deviation is less than 8.05m . Based on reservoir bank geological survey at present, it is consistent with the truth one. Research results have important positive significance for land resources development and utilization in bank area and prevention and mitigation of reservoir bank.

Key words: modified Kachugin method, wave cut notch, critical height of soil, stability time limit of bank slope rebuilding, soil bank slope

中图分类号: 

  • P 642.2
[1] 丁王飞,周云涛, . 三峡库区蓄水期间类土质岸坡断裂解体机制研究[J]. , 2017, 38(1): 197-204.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] 刘小文,常立君,胡小荣. 非饱和红土基质吸力与含水率及密度关系试验研究[J]. , 2009, 30(11): 3302 -3306 .
[2] 黄建华,宋二祥. 大型锚碇基础围护工程冻结帷幕力学性态研究[J]. , 2009, 30(11): 3372 -3378 .
[3] 王观石,李长洪,陈保君,李世海. 应力波在非线性结构面介质中的传播规律[J]. , 2009, 30(12): 3747 -3752 .
[4] 王朝阳,许 强,倪万魁. 原状黄土CT试验中应力-应变关系的研究[J]. , 2010, 31(2): 387 -391 .
[5] 邓 琴,郭明伟,李春光,葛修润. 基于边界元法的边坡矢量和稳定分析[J]. , 2010, 31(6): 1971 -1976 .
[6] 万少石,年廷凯,蒋景彩,栾茂田. 边坡稳定强度折减有限元分析中的若干问题讨论[J]. , 2010, 31(7): 2283 -2288 .
[7] 闫 铁,李 玮,毕雪亮. 基于分形方法的多孔介质有效应力模型研究[J]. , 2010, 31(8): 2625 -2629 .
[8] 徐维生,柴军瑞,陈兴周,孙旭曙. 岩体裂隙网络非线性非立方渗流研究与应用[J]. , 2009, 30(S1): 53 -57 .
[9] 赵尚毅,郑颖人,李安洪,邱文平,唐晓松,徐 俊. 多排埋入式抗滑桩在武隆县政府滑坡中的应用[J]. , 2009, 30(S1): 160 -164 .
[10] 魏厚振,颜荣涛,韦昌富,吴二林,陈 盼,田慧会. 含天然气水合物沉积物相平衡问题研究综述[J]. , 2011, 32(8): 2287 -2294 .