›› 2014, Vol. 35 ›› Issue (8): 2325-2334.

• 岩土工程研究 • 上一篇    下一篇

阿里山森林铁路隧道复建工程的设计与施工探讨

李嵘泰1,刘弘祥2,魏铭辉2,黄崇仁2,连祥益3,沈宜庆3,廖一光3   

  1. 1.嘉义大学 森林暨自然资源学系,台湾 嘉义 60004;2.中兴工程顾问股份有限公司,台湾 台北 10570; 3.农业委员会林务局嘉义林区管理处,台湾 嘉义 60049
  • 收稿日期:2014-03-31 出版日期:2014-08-12 发布日期:2014-08-14
  • 作者简介:李嵘泰,男,1976年生,博士,助理教授,主要从事森林水土资源保育研究、水土保持工程及集水区经营方面的研究工作。
  • 基金资助:

    森林铁路路基修复工程设计及监造委托服务案

Design and construction of Alishan forest railway tunnel rehabilitation project

LEE Jung-tai1, LIU Hong-shiang2, WEI Ming-hui2, HUANG Chong-ren2, LIAN Xiang-yi3, SHEN Yi-qing3, LIAO Yi-guang3   

  1. 1. Department of Forestry and Natural Resources, National Chiayi University, Chiayi, Taiwan 60004, China; 2. Sinotech Engineering Consultants, Ltd., Taipei 10570, China; 3. Chiayi Forest District Office, Forestry Bureau, Chiayi, Taiwan 60049, China
  • Received:2014-03-31 Online:2014-08-12 Published:2014-08-14

摘要: 2009年8月8日莫拉克台风重创南台湾,嘉义阿里山区72 h的累积雨量高达2 500 mm以上,百年历史的阿里山森林铁道因沿线路基严重流失而停驶。其中两处大崩塌路段的复建工程以顺应自然为原则,采取迂回隧道方式避开崩塌区,需克服沿线地质变化及地下水问题,评估结果是以凿岩机工法及钻爆工法进行开挖。两座隧道的西口段崩积层分别长达109.8、99 m,是隧道开挖阶段的关键地段。隧道开挖支撑设计系依据台湾岩体分类与支撑系统(PCCR系统)及新奥工法的理念,沿线采用先进支撑材料包括超前管棚钢管、桁型钢支护、钢纤维喷射混凝土及自钻式锚杆等,除了可确保施工安全外,亦可提高施工进度。目前两隧道均已贯通且变形量控制均符合安全,说明隧道采用先进支撑方式穿越破碎崩积层段的成效良好,其研究结果可为相关工程设计提供参考。

关键词: 迂回隧道, 崩积层, 钢管棚, 桁型钢支护, 钢纤维喷射混凝土

Abstract: On August 8, 2009, Typhoon Morakot hit southern Taiwan. It carried huge accumulated precipitation of 2,500 mm in 72 hours at Alishan area, and caused catastrophic erosion and landslide. Thus, the hundred-year historic Alishan Forest Railway was suspended due to serious embankment collapses. The rehabilitation principle for these two large embankment collapses followed the natural doctrine. Therefore, the D&B/Mechanical bypass tunnel was adopted to overcome the geological changes and groundwater problem in these two huge landslide areas. The lengths of west portal section colluviums of two tunnels were up to 99 m and 109.8 m, which were the crucial sections of tunneling engineering. The tunnel supporting system design was based on PCCR-system (Rock mass classification of Public Construction Commission) & NATM, and steel pipe roofing, lattice girders, and steel fiber reinforced shotcrete, as well as self-drilling anchors were adopted for increasing the safety and shortening the working days during construction. Currently, two tunnels have been driven through, and the amount of deformation was under control and in accord with safety level. This result indicates that implementation of pre-supporting system in drilling through the crushing colluviums section is effective, and can be used as a reference for the relevant engineering design.

Key words: bypass tunnels, colluviums, steel pipe roofing, lattice girders, steel fiber reinforced shotcrete

中图分类号: 

  • TU 42
[1] 刘新荣,祝云华,李晓红,杜国平,宋战平. 隧道钢纤维喷射混凝土单层衬砌试验研究[J]. , 2009, 30(8): 2319-2323.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] 刘小文,常立君,胡小荣. 非饱和红土基质吸力与含水率及密度关系试验研究[J]. , 2009, 30(11): 3302 -3306 .
[2] 黄建华,宋二祥. 大型锚碇基础围护工程冻结帷幕力学性态研究[J]. , 2009, 30(11): 3372 -3378 .
[3] 王观石,李长洪,陈保君,李世海. 应力波在非线性结构面介质中的传播规律[J]. , 2009, 30(12): 3747 -3752 .
[4] 王朝阳,许 强,倪万魁. 原状黄土CT试验中应力-应变关系的研究[J]. , 2010, 31(2): 387 -391 .
[5] 邓 琴,郭明伟,李春光,葛修润. 基于边界元法的边坡矢量和稳定分析[J]. , 2010, 31(6): 1971 -1976 .
[6] 万少石,年廷凯,蒋景彩,栾茂田. 边坡稳定强度折减有限元分析中的若干问题讨论[J]. , 2010, 31(7): 2283 -2288 .
[7] 闫 铁,李 玮,毕雪亮. 基于分形方法的多孔介质有效应力模型研究[J]. , 2010, 31(8): 2625 -2629 .
[8] 徐维生,柴军瑞,陈兴周,孙旭曙. 岩体裂隙网络非线性非立方渗流研究与应用[J]. , 2009, 30(S1): 53 -57 .
[9] 赵尚毅,郑颖人,李安洪,邱文平,唐晓松,徐 俊. 多排埋入式抗滑桩在武隆县政府滑坡中的应用[J]. , 2009, 30(S1): 160 -164 .
[10] 刘振平,贺怀建,朱发华. 基于钻孔数据的三维可视化快速建模技术的研究[J]. , 2009, 30(S1): 260 -266 .