岩土工程研究

新建工程基坑开挖及结构施工对既建下卧隧道的影响研究

展开
  • 1. 华东交通大学 土木建筑学院,江西 南昌330013;2. 浙江大学 城市与滨海岩土工程研究中心,浙江 杭州310058; 3. 浙江省建筑科学设计研究院有限公司,浙江 杭州330013;4. 浙江大学 交通工程研究所,浙江 杭州 310058
徐长节,男,1972生,教授,博导,主要从事土动力学、基坑围护等方面的研究工作。

收稿日期: 2014-04-13

  网络出版日期: 2018-06-14

基金资助

国家自然科学基金项目(No.51278449,No.51238009,No.51338009);杭州建委科技项目(No.2010391)。

Effect of foundation pit excavation and structural construction of new engineering on existing underlying tunnel

Expand
  • 1. School of Civil Engineering and Architecture, East China Jiaotong University, Nanchang, Jiangxi 330013, China; 2. Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou, Zhejiang 310058, China; 3. Zhejiang Academy of Building Research & Design Co., Ltd., Hangzhou, Zhejiang 310013, China; 4. Institute of Transportation Engineering, Zhejiang University, Hangzhou, Zhejiang 310058, China

Received date: 2014-04-13

  Online published: 2018-06-14

Supported by

Project supported by the National Natural Science Foundation of China (Grant Nos.51278449, 51238009 and 51338009) and Hangzhou Urban And Rural Construction Committee (Grant No.2010391).

摘要

随着城市建设的发展,地面工程和地下工程交叉建设的情况越来越多,新建工程对既有建筑产生影响的情况不可避免。因此,在保证既有工程结构安全的前提下建设新的工程已成为众多学者关注的重要问题之一。针对某已建隧道上方工程建设,分别采用Abaqus有限元数值模拟分析法和简化的规范角点法进行对比分析,评价隧道上方工程的基坑开挖及后续的结构施工对既建下卧公路隧道的影响。实施过程中的现场监测数据表明数值分析法和传统的土力学理论法在此类施工边界清晰、荷载施加明确的工程中的有效性并保障了工程的安全。研究还表明,二维分析模型不仅分析计算工作量相对较小,相较于考虑三维的实际工程安全性更有保障。本工程的成功经验可为类似工程的设计和施工提供有益的工程参考和借鉴。

本文引用格式

徐长节 ,王伊丽 ,徐芫蕾 ,王金昌, . 新建工程基坑开挖及结构施工对既建下卧隧道的影响研究[J]. 岩土力学, 2015 , 36(11) : 3201 -3209 . DOI: 10.16285/j.rsm.2015.11.022

Abstract

With the development of city construction, it is common to see more and more cross construction phenomena of the ground engineering and the underground engineering, which unavoidably contributes to the effect of the new construction on the existing construction. Therefore, on the premise of ensuring the safety of the existing construction, how to construct new projects has become one of the important issues for numerous scholars. In this paper, the finite element numerical simulation analysis method of ABAQUS and the simplified specification corner-points method are applied to analyze comparatively an engineering construction adjacent to the existing underlying tunnel. On this basis, the effects of the pit excavation and its subsequent construction on the underlying existing tunnel are evaluated. The field monitoring data demonstrate that the two methods, i.e. the numerical analysis method and the traditional theory of soil mechanics method, are coincidently available in such engineering construction which has clear boundary and explicit load and can secure engineering. The research also shows that the two-dimensional analysis model not only has the smaller calculation workload, but also has more security compared with a three-dimensional model considering practical engineering conditions.