煤矿深井巷道掘进全过程围岩变形破坏原位测试
收稿日期: 2014-04-23
网络出版日期: 2018-06-14
基金资助
国家重点基础研究发展计划(973)项目(No. 2014CB046902);中国科学院科技创新“交叉与合作团队”(No. 人教字〔2012〕119号);中国科学院知识创新工程重要方向性项目(No. KZCX2-EW-QN115);国家自然科学基金项目(No. 51427803)。
In-situ measurement of deformation and failure of surrounding rockmass during whole excavation process of deep coal mine roadway
Received date: 2014-04-23
Online published: 2018-06-14
Supported by
Project supported by National Basic Research Program of China (973 Program) (Grant No. 2014CB046902), CAS Interdisciplinary Innovation Team (Grant No. (2012)119), the Knowledge Innovation Program of the Chinese Academy of Sciences (Grant No. KZCX2-EW-QN115) and the National Natural Science Foundation of China (Grant No. 51427803).
周 辉 ,胡善超 ,卢景景 ,王竹春 ,张传庆 ,渠成堃 ,李 震, . 煤矿深井巷道掘进全过程围岩变形破坏原位测试[J]. 岩土力学, 2015 , 36(12) : 3523 -3530 . DOI: 10.16285/j.rsm.2015.12.024
/
〈 |
|
〉 |