隧道施工诱发地表沉降估算方法及其规律分析
收稿日期: 2016-06-16
网络出版日期: 2018-06-09
基金资助
国家自然科学基金(No. 51308456);陕西省自然科学基础研究计划项目(No. 2015JM5175);陕西省博士后基金(2014),陕西省黄土力学与工程重点实验室科研计划项目(No. 16JS073)
Estimation method and laws analysis of surface settlement due to tunneling
Received date: 2016-06-16
Online published: 2018-06-09
Supported by
This work was supported by the Natural Science Foundation of China (51308456), Project of Scientific Research of Shaanxi (2015JM5175), Postdoctoral fund of Shaanxi Province (2014), and Shaanxi Provincial Key Laboratory of Loess Mechanics (16JS073).
朱才辉,李 宁 . 隧道施工诱发地表沉降估算方法及其规律分析[J]. 岩土力学, 2016 , 37(S2) : 533 -542 . DOI: 10.16285/j.rsm.2016.S2.068
/
| 〈 |
|
〉 |