硬塑性黏土地层泥水盾构停机引起的地表塌陷机制研究

展开
  • 1. 河海大学 岩土力学与堤坝工程教育部重点实验室,江苏 南京 210098;2. 河海大学 土木与交通学院,江苏 南京 210098;3. 南水北调东线江苏水源有限责任公司,江苏 南京 210029;4. 南通职业大学 建筑工程学院,江苏 南通 226007;5. 中铁十四局集团有限公司,山东 济南 250014)
张亚洲,男,1991年生,硕士研究生,主要从事岩土工程、盾构隧道施工技术方面的研究工作。

收稿日期: 2015-04-30

  网络出版日期: 2018-06-05

基金资助

中央高校基本科研业务费专项资金资助(No. 2016B01214);国家自然科学基金项目(No. 51408191,No. 51209142)

Analysis of causes for ground subsidence induced by slurry shield shutdown in hard plastic clay

Expand
  • 1. Key Laboratory of Geomechanics and Embankment Engineering of Ministry of Education, Hohai University, Nanjing, Jiangsu 210098, China; 2. College of Civil and Transportation Engineering, Hohai University, Nanjing, Jiangsu 210098, China; 3. Jiangsu Water Source Company Ltd. of the Eastern Route of the South-to-North Water Diversion Project, Nanjing, Jiangsu 210029, China; 4. Architectural Engineering Institute, Nantong Vocational University, Nantong, Jiangsu 226007, China; 5. China Railway 14th Bureau Co. Ltd., Ji’nan, Shandong 250014, China

Received date: 2015-04-30

  Online published: 2018-06-05

Supported by

This work was supported by the Fundamental Research Funds for the Central Universities (2016B01214) and the National Natural Science Foundation of China (51408191, 51209142).

摘要

扬州瘦西湖隧道采用泥水盾构穿越全断面硬塑性黏土地层,施工停机后多次出现地表塌陷事故。利用室内试验研究硬塑性黏土浸水条件下的崩解、软化特性,结合现场实测数据分析该工程地表塌陷的原因,进一步讨论此类破坏发生的过程,据此提出泥水盾构在全断面硬塑性黏土地层施工时地表塌陷的预防措施。研究表明:泥水盾构停机使开挖面硬塑性黏土在泥水浸润下发生崩解、软化,使开挖面上方形成局部孔洞;随着时间延长,局部孔洞逐渐向上发展直至地表,最终形成地面局部塌陷。泥水盾构在硬塑性黏土地层施工时,应当避免停机;当必须停机时,应尽量缩短停机时间,避开建筑地段,同时加强地面监测,必要时应在开挖面上方地层进行注浆加固,防止坍塌破坏。

本文引用格式

张亚洲,闵凡路,孙 涛,史海岭,李东升, . 硬塑性黏土地层泥水盾构停机引起的地表塌陷机制研究[J]. 岩土力学, 2017 , 38(4) : 1141 -1147 . DOI: 10.16285/j.rsm.2017.04.027

Abstract

The Yangzhou Slender West Lake tunnel passes through the hard plastic clay stratum by slurry shield machine in full section. During the construction process, surface subsidence accidents occurred many times after halting the slurry shield machine. The disintegration and softening of hard plastic clay in soaking condition are investigated by experimental study. The analysis of reason of surface collapsing by combining with field data, and the discussion about the procedure of surface collapsing propose corresponding preventive measures on collapsing in slurry shield construction in the hard plastic clay stratum. This study concludes: disintegration and softening of hard plastic clay occur when the slurry shield shutdown in slurry soaking condition, which generates the local cavity above the excavation face. With the time prolonging, the local cavity gradually develops to the surface, and ultimately forms the ground collapse. It is suggested to avoid halting machine when slurry shield go through full section hard plastic clay stratum. When halting machine is inevitable, reducing the halting time, avoiding the building region, meanwhile strengthening the monitoring and grouting reinforcement in the stratum above the excavation face are suggested to prevent collapsing.