引大济湟工程TBM挤压大变形卡机计算分析与综合防控
收稿日期: 2015-12-03
网络出版日期: 2018-06-05
基金资助
国家自然科学基金资助项目(No. 41602326);国家重点基础研究发展计划(973)资助项目(No. 2014CB046904,No. 2015CB058102)。
Analysis and comprehensive prevention-control for TBM jamming induced by squeezing deformation of surrounding rock around water diversion tunnel from Datong river into Huangshui river
Received date: 2015-12-03
Online published: 2018-06-05
Supported by
This work was supported by the National Natural Science Foundation of China (41602326) and the National Program on Key Basic Research Project of China (973 Program) (2014CB046904, 2015CB058102).
关键词: 引大济湟; 隧道掘进机(TBM); 挤压大变形; 卡机; 防控
黄 兴,刘泉声,彭星新,雷广峰,魏 莱, . 引大济湟工程TBM挤压大变形卡机计算分析与综合防控[J]. 岩土力学, 2017 , 38(10) : 2962 -2972 . DOI: 10.16285/j.rsm.2017.10.025
/
| 〈 |
|
〉 |