Research on quality control method with two indices for embankment filled
with high liquid limit soil
HONG Bao-ning1, 2, 3, HUA Jun-hui1, 3, LIU Xin1, 2, 4, YI Jin-xiang1, 3
1. Key Laboratory of Geomechanics and Embankment Engineering of Ministry of Education, Hohai University, Nanjing, Jiangsu 210098, China;
2. Jiangsu Research Center for Geotechnical Engineering Technology, Hohai University, Nanjing, Jiangsu 210098, China; 3. Geotechnical Research Institute, Hohai University, Nanjing, Jiangsu 210098, China; 4. Institute of Tunnel and Underground Engineering, Hohai University, Nanjing, Jiangsu 210098, China
This work was supported by the Fundamental Research Funds for the Central Universities (2014B34414), the Natural Science Youth Foundation of Jiangsu Province (BK20140848) and Scientific Program of Transport Department of Guangdong Province (S-2015-02-013, S-2015-02-015).
HONG Bao-ning, HUA Jun-hui, LIU Xin, YI Jin-xiang, . Research on quality control method with two indices for embankment filled
with high liquid limit soil
[J]., 2016, 37(S1): 255-262.