›› 2017, Vol. 38 ›› Issue (10): 3009-3016.doi: 10.16285/j.rsm.2017.10.030

• Geotechnical Engineering • Previous Articles     Next Articles

Determination of coal pillar width between roadways of fully mechanised caving face with double roadways layout in a thick coal seam

WANG Qi1, 2, FAN Yun-ping1, 2, LI Gang1, 2, GUO Wen-xiao2, YAN Dian-hua2, ZHANG Li-ping2   

  1. 1. Taiyuan Institute of China Coal Technology and Engineering Group, Taiyuan, Shanxi 030006, China; 2. Shanxi Tiandi Coal Machinery Co., Ltd., Taiyuan, Shanxi 030006, China
  • Received:2015-11-27 Online:2017-10-10 Published:2018-06-05
  • Supported by:

    This work was supported by the Shanxi Key Coal Base Science and Technology Project (MJ2014-03, MJ2014-07).

Abstract: This study is to determine the width of coal pillar between roadways of the fully mechanised caving face with double roadways layout in a thick coal seam. The coal pillar between haulage gate and auxiliary haulage gate of the 4301 working face in the fourth panel was selected as a case study. Firstly, based on theoretical analysis, the pillar between roadways was along tendency divided into mining influence area, relative stability area and bolt supporting area after the first mining. The width of first mining influence area was 2.82 m determined by using the limit equilibrium theory, and the width of pillar between roadways was subsequently obtained as 7.83 m. Then, a numerical method was conducted to systematically simulate the laws of stress evolution, failure, and roadways deformation of pillars with the widths of 4, 6, 8, 10, 12, 15 and 20 m under the secondary mining influence. It is found that after the first mining, the high stress transfers from the coal wall to the pillar with the increase of pillar width. Besides, the definitions of the maximum and the minimum critical sizes are given. It is pointed out that the width of the narrow pillar should be less than the maximum critical size. By synthesising numerical results, theoretical results and principles of the pillar, the most favourable width of the pillar between roadways is suggested as 8 m. Finally, the rationality of the pillar width is verified by engineering practice. The results can provide a reference for the determination of narrow pillar between roadways of fully mechanised caving face with similar mining conditions.

Key words: pillar between roadways, thick coal seam, fully mechanised caving face, double roadways layout

CLC Number: 

  • TD 35

[1] HE Man-chao, GAO Yu-bing, YANG Jun, WANG Jian-wen, WANG Ya-jun, ZHU Zhen, . Engineering experimentation of gob-side entry retaining formed by roof cutting and pressure release in a thick-seam fast-extracted mining face [J]. , 2018, 39(1): 254-264.
[2] HE Tuan, MAO De-bing, HUANG Zhi-zeng, SUN Xiao-dong, ZHANG Xue-liang, . Stability evaluation and protection technology of waterproof segment pillar with fully-mechanized caving of ultra-thick coal seam [J]. , 2017, 38(4): 1148-1153.
[3] YANG Deng-feng,ZHANG Lin-fan,CHAI Mao,LI Bo,BAI Yi-fei,. Study of roof breaking law of fully mechanized top coal caving mining in ultra-thick coal seam based on fracture mechanics [J]. , 2016, 37(7): 2033-2039.
[4] CHANG Ju-cai, XIE Guang-xiang, ZHANG Xue-hui. Analysis of rib spalling mechanism of fully-mechanized top-coal caving face with great mining height in extra-thick coal seam [J]. , 2015, 36(3): 803-808.
[5] PENG Lin-jun , ZHANG Dong-feng , GUO Zhi-biao , DUAN Qing-wei,. Numerical analysis of thick coal seam small pillar along gob roadway and its application [J]. , 2013, 34(12): 3609-3616.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!