Fundamental Theroy and Experimental Research

Calculation method of limit overlying earth pressure on shield tunnel during lifting

Expand
  • 1. Key Laboratory of Road and Traffic Engineering of Ministry of Education, Tongji University, Shanghai 201804, China; 2. School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou, Gansu 730070, China

Received date: 2015-10-27

  Online published: 2018-06-09

Supported by

This work was supported by the National Natural Science Foundation of China (41472247, 51478353).

Abstract

Grouting lifting technique is considered as an effective method to dispose uneven settlement of shield tunnel; but the overlying earth pressure on the shield tunnel during lifting is complex and has not been investigated deeply, which makes it hard to estimate the stress and deformation condition of the shield tunnel lining. A small scale model test system is firstly developed to simulate shield tunnel lifting in the laboratory,in which the transparent soil and PIV technology are applied. The limit overlying earth pressure as well as velocity field of the overlying soil layer are obtained through the tests. Then the shear-slipping features are studied, which indicate that the overlying soil layer could be divided into four different motion regions. A calculation model of limit overlying earth pressure is established based on the associated flow rules together with velocity field of overlying soil layer; then the calculation formulas are derived on the basis of virtual work equation. It turns out that the calculated limit overlying earth pressures are 4%-15% higher than the results obtained from model tests.

Cite this article

ZHOU Jun-hong ,GONG Quan-mei ,ZHOU Shun-hua ,HAN Gao-xiao , . Calculation method of limit overlying earth pressure on shield tunnel during lifting[J]. Rock and Soil Mechanics, 2016 , 37(7) : 1969 -1976 . DOI: 10.16285/j.rsm.2016.07.018

Outlines

/