›› 2009, Vol. 30 ›› Issue (6): 1861-1866.

• 测试技术 • 上一篇    下一篇

地铁车站下穿既有线隧道施工中的远程监测系统

张成平,张顶立,骆建军,王梦恕,吴介普   

  1. 北京交通大学 隧道及地下工程教育部工程研究中心,北京 100044
  • 收稿日期:2008-09-25 出版日期:2009-06-10 发布日期:2011-03-09
  • 作者简介:张成平,男,1975年生,博士生,讲师,主要从事隧道及地下工程方面的教学与研究工作。
  • 基金资助:

    国家自然科学基金资助项目(No. 50778011);北京市科技计划重大专项(No. Z07090601470701);北京市科技计划重点项目(No. D08050603130804)。

Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel

ZHANG Cheng-ping,ZHANG Ding-li,LUO Jian-jun,WANG Meng-shu,WU Jie-pu   

  1. Tunnel and Underground Engineering Research Center of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
  • Received:2008-09-25 Online:2009-06-10 Published:2011-03-09

摘要:

为确保北京地铁5号线崇文门站施工期间其上方既有地铁隧道的运营安全,采用远程自动监测系统对既有地铁结构的动态变化进行了实时监控。该监测系统由传感器子系统、数据采集与传输子系统和数据管理子系统构成,可以最大限度地降低监测与运营的相互影响。传感器子系统包括静力水准仪、梁式倾斜仪、位移计和测缝计,分别监测隧道沉降、道床沉降、两走行轨横向高差和水平间距以及结构变形缝的变化;数据采集与传输子系统将采集到的数据以有线方式传输至信息中心;信息中心的数据管理子系统对接收到的数据进行处理,并通过公共网络将监测信息及时反馈给相关单位。该系统在北京地铁5号线崇文门车站下穿环线地铁隧道施工期间对既有地铁结构的变形实施了有效监控,有关单位根据监测系统反映的异常情况及时调整了施工措施,取得了理想的控制效果,保证了施工期间既有地铁线路的安全运营。

关键词: 地铁车站施工, 既有地铁隧道, 安全运营, 远程监测系统, 实时自动监测

Abstract:

In order to guarantee the operation safety of the metro above during the construction of Chongwenmen station in Beijing metro No.5, the remote monitoring system is used to measure the dynamic changes of existing metro structure. The monitoring system is composed of sensor subsystem, data acquisition and transmission subsystem, and data management subsystem, which can reduce the interaction between the monitoring and subway operation in maximum. The sensor subsystem consists of static force level gauge, beam inclinometer, displacement sensor and joint meter, which are used to monitor the settlements of existing tunnel and track bed, transverse height difference and horizontal space between two running rails and changes of the structure slots respectively. The data acquisition and transmission subsystem can transfer the collected data to the information center by wired medium. The data received will be treated by the management subsystem; and then fed back to related departments and companies by public network. The deformations of the existing metro structure are monitored effectively by the system during the undercrossing construction of newly-built metro station; and the control measures are adjusted in time according to the deformation data so as to make the existing metro runs safely.

Key words: metro station construction, existing metro tunnel, safe operation, remote monitoring system, real-time automatic monitoring

中图分类号: 

  • U 456.3
[1] 陈祥胜, 李银平, 施锡林, 叶良良, 杨春和, . 地下盐穴储气库泄漏原因及防治措施研究[J]. 岩土力学, 2019, 40(S1): 367-373.
[2] 邬 凯,盛 谦,张勇慧,李志勇,李红旭,岳志平. 山区公路路基边坡地质灾害远程监测预报系统开发及应用[J]. , 2010, 31(11): 3683-3687.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] 刘小文,常立君,胡小荣. 非饱和红土基质吸力与含水率及密度关系试验研究[J]. , 2009, 30(11): 3302 -3306 .
[2] 黄建华,宋二祥. 大型锚碇基础围护工程冻结帷幕力学性态研究[J]. , 2009, 30(11): 3372 -3378 .
[3] 王观石,李长洪,陈保君,李世海. 应力波在非线性结构面介质中的传播规律[J]. , 2009, 30(12): 3747 -3752 .
[4] 王朝阳,许 强,倪万魁. 原状黄土CT试验中应力-应变关系的研究[J]. , 2010, 31(2): 387 -391 .
[5] 邓 琴,郭明伟,李春光,葛修润. 基于边界元法的边坡矢量和稳定分析[J]. , 2010, 31(6): 1971 -1976 .
[6] 万少石,年廷凯,蒋景彩,栾茂田. 边坡稳定强度折减有限元分析中的若干问题讨论[J]. , 2010, 31(7): 2283 -2288 .
[7] 闫 铁,李 玮,毕雪亮. 基于分形方法的多孔介质有效应力模型研究[J]. , 2010, 31(8): 2625 -2629 .
[8] 赵尚毅,郑颖人,李安洪,邱文平,唐晓松,徐 俊. 多排埋入式抗滑桩在武隆县政府滑坡中的应用[J]. , 2009, 30(S1): 160 -164 .
[9] 魏厚振,颜荣涛,韦昌富,吴二林,陈 盼,田慧会. 含天然气水合物沉积物相平衡问题研究综述[J]. , 2011, 32(8): 2287 -2294 .
[10] 赵跃堂,林家炜,石 磊. 冲击荷载作用下层裂问题研究[J]. , 2011, 32(S2): 122 -126 .