›› 2012, Vol. 33 ›› Issue (S2): 98-104.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Analysis of influence of DOT shield tunneling on existed adjacent tunnel

WEI Gang1, HONG Jie2, WEI Xin-jiang1,2   

  1. 1. Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015, China; 2. Institute of Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China
  • Received:2012-07-09 Online:2012-11-22 Published:2012-12-11

Abstract: Based on the method of images, the three-dimensional soil loss additional load formula caused by DOT shield tunneling soil loss is derived by using non-uniform soil movement model. The distribution regularity of total additive load from additive thrust force, the friction between DOT shield machine and soil together with soil loss on existed adjacent tunnel is researched. The results show that: the distribution regularity of additive load is closely related with the relative position of existed adjacent tunnel and DOT shield tunnel; and it is a three-dimensional problem. In the thrust direction, the additive stress changes from tension behind into pression ahead of the excavation face. Soil loss is the main factor in total additional load, followed by friction and thrust additional force; the additional load that the existed adjacent tunnel subjected to is closely related to its net spacing away from DOT shield machine S; and additional load increases rapidly when S decreases; the existed adjacent tunnel is subjected to the greatest additional load in the axis position of DOT shield machine with the variation of axis buried depth of the existed adjacent tunnel.

Key words: DOT shield machine, soil loss, additional load

CLC Number: 

  • U 25
[1] WEI Gang, JIANG Xin, ZHANG Xin-hai, JIN Rui,. Soil vertical deformation induced by ground penetrating shield tunnel construction [J]. , 2018, 39(3): 993-1001.
[2] ZHANG Zhi-guo , ZHANG Meng-xi , WANG Wei-dong,. Analysis of soil vertical additional loads induced by pipe jacking construction [J]. , 2014, 35(S2): 121-128.
[3] WEI Xin-jiang ,HONG Jie ,WEI Gang . Analysis of additional load on adjacent pile foundation induced by double-o-tube shield tunnel construction [J]. , 2013, 34(3): 783-790.
[4] LIANG Yao-zhe. Analysis of active earth pressure of rigid pile composite foundation [J]. , 2012, 33(S1): 25-29.
[5] WEI Gang ,HONG Jie ,WEI Xin-jiang . Analysis of additional load on adjacent underground pipeline induced by double-o-tube shield tunneling [J]. , 2012, 33(6): 1735-1741.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] WEN Shi-qiang, CHEN Yu-min, DING Xuan-ming, ZUO Wei-long. Application of grouted gravel pile in soft subgrade improvement of expressway[J]. , 2010, 31(5): 1559 -1563 .
[2] ZHANG Chang-guang,ZHANG Qing-he,ZHAO Jun-hai. Unified solutions of shear strength and earth pressure for unsaturated soils[J]. , 2010, 31(6): 1871 -1876 .
[3] YANG Tian-hong, CHEN Shi-kuo, ZHU Wan-cheng, LIU Hong-lei. Coupled model of gas-solid in coal seams based on dynamic process of pressure relief and gas drainage[J]. , 2010, 31(7): 2247 -2252 .
[4] HU Xiu-hong,WU Fa-quan. Research on two-parameter negative exponential distribution of discontinuity spacings in rock mass[J]. , 2009, 30(8): 2353 -2358 .
[5] LI Wei-chao, XIONG Ju-hua, YANG Min. Improved method for calculating anti-overturning safety factor of cement-soil retaining wall in layered soil[J]. , 2011, 32(8): 2435 -2440 .
[6] ZHANG Gui-min , LI Yin-ping , SHI Xi-lin , YANG Chun-he , WANG Li-juan. Research on a model material preparation method for alternate layered rock mass and preliminary experiment[J]. , 2011, 32(S2): 284 -289 .
[7] WANG Wei LI Xiao-chun LI Qiang SHI Lu WANG Ying BAI Bing. Small size in-situ transient pulse permeability measurement system and its experimental research[J]. , 2011, 32(10): 3185 -3189 .
[8] LI Shu-cai , ZHAO Yan , XU Bang-shu , LI Li-ping , LIU Qin , WANG Yu-kui . Study of determining permeability coefficient in water inrush numerical calculation of subsea tunnel[J]. , 2012, 33(5): 1497 -1504 .
[9] Lü Ya-ru , DING Xuan-ming , SUN Jia , KONG Gang-qiang . Analysis of ultimate bearing capacity of X-section cast-in-place concrete pile composite foundation under rigid load[J]. , 2012, 33(9): 2691 -2696 .
[10] WANG Hong-xin , SUN Yu-yong . Test study and bar system FEM for foundation pits considering excavation width[J]. , 2012, 33(9): 2781 -2787 .