›› 2013, Vol. 34 ›› Issue (3): 757-761.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Theoretical and experimental analyses of jacking force during deep-buried pipe jacking

YANG Xian1, 2,ZHANG Ke-neng2,LI Yong-suo3,PENG Huan-yun2,HUANG Chang-bo4   

  1. 1. School of Civil Engineering, Hunan University of Science and Technology, Xiangtan, Hunan 411201, China; 2. School of Geosciences and Info-Physics, Central South University, Changsha 410083, China; 3. School of Civil Engineering, Hunan City University, Yiyang, Hunan 413000, China; 4. China Construction Municipal Construction Corporation Limited, Beijing 100161, China
  • Received:2012-02-02 Online:2013-03-11 Published:2013-03-20

Abstract: Theoretical and experimental analyses are conducted for the pipe jacking force of the great depth pipeline in pipe roof pre-construction method. The pipe jacking force is closely related to the vertical soil pressure. Reference to the calculation method of vertical earth pressure in tunnel excavation, there are two kinds of frequently-used theories to calculate vertical earth pressure in pipe jacking, i.e. M. M. Promojiyfakonov theory and Terzaghi theory. After analyzing the adaptability and defects of the two kinds of theories, new modified theoretical formula based on M. M. Promojiyfakonov theory and Terzaghi theory is got to calculate vertical earth pressure; and MATLAB program is written to calculate the numerical solution of new modified theoretical formula. Both the soil arching effect and the holding force under the arching of soil are considered in modified theory, which is more consistent with the actual soil deformation. M. M. Promojiyfakonov theory, Terzaghi theory and modified theory are used to calculate jacking force of two pipelines at different depths in pipe roof pre-construction method of Xinle Ruins Station of Shenyang Metro; the calculated results are compared to the measured results. It is shown that the results of M. M. Promojiyfakonov theory and Terzaghi theory are much larger than the measured values; the results of modified theory are slightly larger than the measured results. So that the results of modified theory are more suitable for estimating pipe jacking force of great depth pipelines.

Key words: pipe roof pre-construction method, pipe jacking force, vertical earth pressure, M. M. Promojiyfakonov theory, Terzaghi theory, modified theory, measured jacking force

CLC Number: 

  • U 25
[1] HE Ben-guo ,ZHU Yong-quan ,SUN Ming-lei ,ZHANG Zhi-qiang ,SUN Yuan-guo . Method for determining supporting load of deep tunnel on high-speed railway in gypsum breccia stratum [J]. , 2013, 34(3): 827-832.
[2] WEI Gang , HONG Jie , WEI Xin-jiang . Analysis of influence of DOT shield tunneling on existed adjacent tunnel [J]. , 2012, 33(S2): 98-104.
[3] YUAN Xiao-hui , HAN Yue-wang , ZHONG Xiao-chun. Numerical model building for consolidation deformation of cemented mortar for shield tail grouting [J]. , 2012, 33(3): 925-932.
[4] MA Hui , GAO Ming-zhong , ZHANG Jian-kang , YU Qi-fu. Theoretical model developed for equivalent elastic modulus estimation of cobblestone-soil matrix [J]. , 2011, 32(12): 3642-3646.
[5] LI Yong-suo , ZHANG Ke-neng , HUANG Chang-bo , LI Zhong , DENG Mei-long. Analysis of surface subsidence of tunnel built by pipe-roof pre-construction method [J]. , 2011, 32(12): 3701-3707.
[6] SHU Zhi-le , LIU Xin-rong , ZHU Cheng-hong , GUO Zi-hong , LI Xiao-hong. Study of model test about 3D GPR detection of tunnel lining cavity [J]. , 2011, 32(S1): 551-0558.
[7] DU Ju-hong,HUANG Hong-wei. Dynamic simulation analysis of displacement field of bias closely spaced tunnel with altitude difference [J]. , 2009, 30(4): 1102-1108.
[8] LIU Wen-jian, WU Xiang-bin, ZHANG Hui. Analysis of two-field coupling creep of tunnel excavation in rich fracture rock [J]. , 2008, 29(11): 3011-3016.
[9] LI Zhi-gao , ZENG Yuan , LIU Guo-bin . Numerical simulation of displacement transfer law of excavation adjacent metro station [J]. , 2008, 29(11): 3104-3108.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] SUN Yong. Research on calculation method of double-row anti-sliding structure under sliding surface[J]. , 2009, 30(10): 2971 -2977 .
[2] QU Wan-bo, LIU Xin-rong, FU Yan, QIN Xiao-ying. Numerical simulation of preliminary lining of large section crossing tunnels constructed with PBA method[J]. , 2009, 30(9): 2799 -2804 .
[3] WANG Chuan-ying, HU Pei-liang, SUN Wei-chun. Method for evaluating rock mass integrity based on borehole camera technology[J]. , 2010, 31(4): 1326 -1330 .
[4] TAN Yun-zhi, KONG Ling-wei, GUO Ai-guo, WAN Zhi. Capillary effect of moisture transfer and its numerical simulation of compacted laterite soil[J]. , 2010, 31(7): 2289 -2294 .
[5] WANG Yun-gang, XIONG Kai, LING Dao-sheng. Upper bound limit analysis of slope stability based on translational and rotational failure mechanism[J]. , 2010, 31(8): 2619 -2624 .
[6] LONG Zhao,ZHAO Ming-hua,ZHANG En-xiang,LIU Jun-long. A simplified method for calculating critical anchorage length of bolt[J]. , 2010, 31(9): 2991 -2994 .
[7] XU Zhi-jun, ZHENG Jun-jie, ZHANG Jun, MA Qiang. Application of cluster analysis and factor analysis to evaluation of loess collapsibility[J]. , 2010, 31(S2): 407 -411 .
[8] SHI Dan-da, ZHOU Jian, JIA Min-cai, YANG Yong-xiang. Back analysis of parameters and long-term settlement prediction of harbor soft ground considering its creep behavior[J]. , 2009, 30(3): 746 -750 .
[9] KANG Yong-gang,ZHANG Xiu-e. Nonstationary parameter fractional Burgers model of rock creep[J]. , 2011, 32(11): 3237 -3241 .
[10] LI Nan , XU Hui , HU Bin. Shear creep characteristics of sandstone under dry and saturated states[J]. , 2012, 33(2): 439 -443 .