›› 2014, Vol. 299 ›› Issue (2): 389-396.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Model test research on work performance of steel tubular composite pile with shear ring, drilling mud skin and anticorrosion coating

ZHANG Min1, MA Jian-lin1, SU Quan-ke2, WU Wei-sheng3, LIU Kai-rui1   

  1. 1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China; 2. Hong Kong-Zhuhai-Macao Bridge Authority, Zhuhai, Guangdong 519015, China; 3. China Communications Construction Cooperation Highway Consultants Co., Ltd., Beijing 100088, China
  • Received:2012-12-04 Online:2014-02-11 Published:2014-02-18

Abstract: To investigate the effects of shear ring, drilling mud skin and anticorrosion coating on performances of steel tubular composite (STC) piles, five model tests with different combinations of shear ring, drilling mud skin and anticorrosion coating are conducted; two of them are with shear ring, relying on the construction of the Hong Kong-Zhuhai-Macao Bridge. The load-deformation curves and deformations of cross-section, steel tube and shear ring have been compared and analyzed. The results obtained from the tests show that the bond strength of STC pile is reduced by drilling mud skin and anticorrosion coating, while the performances of steel tube are improved by shear ring. The cross-section deformation of pile shows "inverted v" or "m" type; it no longer meets section deformation assumption of classical mechanics. The disadvantage effects of drilling mud skin and anticorrosion coating can be completely overcome by the shear ring, when its spacing is less than 2D (D is pile’s diameter). Based on the test results, the stiffness calculation of STC pile has been discussed and the stiffness calculation formula in elastic stage has been given. The stiffness of STC pile is reduced by drilling mud skin with thickness of 0.1 mm and anticorrosion coating, which is improved by shear ring. The paper will provide references for STC pile’s design.

Key words: model test, steel tubular composite pile, shear ring, drilling mud skin, anticorrosion coating, working performance

CLC Number: 

  • TU 473.1
[1] WANG Guo-hui, CHEN Wen-hua, NIE Qing-ke, CHEN Jun-hong, FAN Hui-hong, ZHANG Chuan, . Impacts of pit excavation on foundation piles in deep silty soil by centrifugal model tests [J]. Rock and Soil Mechanics, 2020, 41(2): 399-407.
[2] YU Yi-fan, WANG Ping, WANG Hui-juan, XU Shu-ya, GUO Hai-tao, . Physical model test of seismic dynamic response to accumulative landslide [J]. Rock and Soil Mechanics, 2019, 40(S1): 172-180.
[3] LEI Hua-yang, HU Yao, LEI Shuang-hua, QI Zi-yang, XU Ying-gang, . Analysis of microstructure characteristics of air-booster vacuum preloading for ultra-soft dredger fills [J]. Rock and Soil Mechanics, 2019, 40(S1): 32-40.
[4] CHEN Yu-long, UCHIMURA Taro, . Early warning of rainfall-induced landslides based on elastic wave velocity [J]. Rock and Soil Mechanics, 2019, 40(9): 3373-3386.
[5] WANG Qin-ke, MA Jian-lin, CHEN Wen-long, YANG Yan-xin, HU Zhong-bo, . Centrifugal model tests and calculation method of uplift bearing capacity of rock-socketed pedestal pile overburden soil [J]. Rock and Soil Mechanics, 2019, 40(9): 3405-3415.
[6] LU Liang, SHI Tong-hui, YANG Dong, . Control effect of uneven settlement of subgrade by composited method of replacement load shedding and reinforced embankment [J]. Rock and Soil Mechanics, 2019, 40(9): 3474-3482.
[7] CAI Yu, XU Lin-rong, ZHOU De-quan, DENG Chao, FENG Chen-xi, . Model test research on method of self-balance and traditional static load [J]. Rock and Soil Mechanics, 2019, 40(8): 3011-3018.
[8] SUN Fei, ZHANG Zhi-qiang, YI Zhi-wei. Model experimental study of the influence of normal fault with stick-slip dislocation on subway tunnel structure [J]. Rock and Soil Mechanics, 2019, 40(8): 3037-3044.
[9] ZHOU Dong, LIU Hang-long, ZHANG Wen-gang, DING Xuan-ming, YANG Chang-you, . Transparent soil model test on the displacement field of soil around single passive pile [J]. Rock and Soil Mechanics, 2019, 40(7): 2686-2694.
[10] ZHAO Xiao-yan, FAN Yu-fei, LIU Liang, JIANG Chu-sheng, . Model test on potential failure surface characteristics of railway stepped reinforced soil retaining wall [J]. Rock and Soil Mechanics, 2019, 40(6): 2108-2118.
[11] CHU Zhao-fei, LIU Bao-guo, REN Da-rui, SONG Yu, MA Qiang, . Development of rheology similar material of soft rock and its application in model test [J]. Rock and Soil Mechanics, 2019, 40(6): 2172-2182.
[12] WU Guan-ye, ZHENG Hui-feng, XU Jian-rong. Model test study of stability and failure mechanism of three-dimensional complicated block system slope with deeply reinforcement [J]. Rock and Soil Mechanics, 2019, 40(6): 2369-2378.
[13] LI Shu-zhao, WANG Zhong-chang, JIA Xu, HE Lin-lin, . Simplified calculation method for cyclic bearing capacity of suction anchors with taut mooring in soft clay [J]. Rock and Soil Mechanics, 2019, 40(5): 1704-1712.
[14] ZHOU Xiao-wen, CHENG Li, ZHOU Mi, WANG Qi, . Behavior of ball penetration in clay in centrifuge testing [J]. Rock and Soil Mechanics, 2019, 40(5): 1713-1720.
[15] RUI Rui, YE Yu-qiu, CHEN Cheng, TU Shu-jie. Nonlinear distribution of active earth pressure on retaining wall considering wall-soil friction [J]. Rock and Soil Mechanics, 2019, 40(5): 1797-1804.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] WANG Gang, LI Shu-cai, WANG Ming-bin. Study of stability of anchoring jointed rockmass under seepage pressure[J]. , 2009, 30(9): 2843 -2849 .
[2] LIU Yu-cheng,CAO Shu-gang,LIU Yan-bao. Discussion on some time functions for describing dynamic course of surface subsidence due to mining[J]. , 2010, 31(3): 925 -931 .
[3] LI Yuan-heng,CHEN Guo-liang,LIU Xiu-guo,SHANG Jian-ga. The topology-oriented method of building 3D geological block model based on primary TIN[J]. , 2010, 31(6): 1902 -1906 .
[4] YANG Jian-min, ZHENG Gang. Classification of seepage failures and opinion to formula for check bursting instability in dewatering[J]. , 2009, 30(1): 261 -264 .
[5] ZHANG Bo, Li Shu-cai, YANG Xue-ying, WANG Xi-ping. Research on seismic wave input with three-dimensional viscoelastic artificial boundary[J]. , 2009, 30(3): 774 -778 .
[6] ZHOU Hua,WANG Guo-jin1,,FU Shao-jun,ZOU Li-chun,CHEN Sheng-hong. Finite element analysis of foundation unloading and relaxation effects of Xiaowan Arch Dam[J]. , 2009, 30(4): 1175 -1180 .
[7] YE Fei, ZHU He-hua, HE Chuan. Back-filled grouts diffusion model and its pressure to segments of shield tunnel[J]. , 2009, 30(5): 1307 -1312 .
[8] SHI Chong , XU Wei-ya , ZHANG Yu , LI De-liang , LIU He. Study of dynamic parameters for talus deposit based on model of cellular automata[J]. , 2011, 32(6): 1795 -1800 .
[9] GONG Wei-ming, HUANG Ting, DAI Guo-liang. Experimental study of key parameters of high piled foundation for offshore wind turbine[J]. , 2011, 32(S2): 115 -121 .
[10] SONG Yi-min , JIANG Yao-dong , MA Shao-peng , YANG Xiao-bin , ZHAO Tong-bin . Evolution of deformation fields and energy in whole process of rock failure[J]. , 2012, 33(5): 1352 -1356 .