岩土力学 ›› 2020, Vol. 41 ›› Issue (12): 3979-3986.doi: 10.16285/j.rsm.2020.0494

• 基础理论与实验研究 • 上一篇    下一篇

充填回收房式煤柱围岩变形及煤柱承载 特征物理模拟研究

安百富1, 2, 3, 4,王栋达1,庞继禄3,张恒3,曹国磊1, 2   

  1. 1. 湖南科技大学 南方煤矿瓦斯与顶板灾害预防控制安全生产重点实验室,湖南 湘潭 411201;2. 中国矿业大学 煤炭资源与安全开采国家重点实验室,江苏 徐州 221116;3. 山东能源新汶矿业集团有限责任公司,山东 泰安 271200;4. 中国矿业大学 环境与测绘学院,江苏 徐州 221116
  • 收稿日期:2020-04-26 修回日期:2020-06-24 出版日期:2020-12-11 发布日期:2021-01-18
  • 作者简介:安百富,男,1987年生,博士,讲师,主要从事充填与矿山绿色开采等方面的教研工作。
  • 基金资助:
    国家自然科学基金(No.51804108);国家重点研发计划项目(No.2018YFC0604706);煤炭资源与安全开采国家重点实验室开放基金项目(No.SKLCRSM19K025)。

Physical simulation for surrounding rock deformation and coal pillar bearing characteristics of filling recovery room coal pillar

AN Bai-fu1, 2, 3, 4, WANG Dong-da1, PANG Ji-lu3, ZHANG Heng3, CAO Guo-lei1, 2   

  1. 1. Work Safety Key Laboratory on Prevention and Control of Gas and Roof Disasters for Southern Coal Mines, Hunan University of Science and Technology, Xiangtan, Hunan 411201, China; 2. State Key Laboratory of Coal Resources and Safe Mining, China University of Mining and Technology, Xuzhou, Jiangsu 221116, China; 3. Shandong Energy Xinwen Mining Group Co., Ltd., Taian, Shandong 271200, China; 4. School of Environment Science and Spatial Informatics, China University of Mining and Technology, Xuzhou, Jiangsu 221116, China
  • Received:2020-04-26 Revised:2020-06-24 Online:2020-12-11 Published:2021-01-18
  • Supported by:
    This work was supported by the National Natural Science Foundation of China(51804108), the National Key Research and Development Project (2018YFC0604706) and the Research Fund of the State Key Laboratory of Coal Resources and safe Mining, CUMT(SKLCRSM19K025).

摘要: 为探明风积沙综采固体充填回收房式煤柱采场围岩稳定性特征,采用相似物理模拟方法对比分析了垮落法与充填法回收时的围岩变形及煤柱受力特征,基于相似原理给出了房式开采、垮落法及充填法回收房式煤柱的过程与时间控制方案,确定采用纸张+塑料泡沫+海绵按比例组合并预压缩的方式模拟风积沙充填物料的压缩变形特性。研究发现:(1)相比垮落法,风积沙充填回收煤柱时可大幅减缓覆岩下沉速度,延后及延长覆岩移动周期,避免垮落法回收时因基本顶及上覆坚硬岩层来压剧烈导致的煤柱失稳、煤房垮塌;(2)垮落法与充填法回收时,煤柱的最大承载均出现在超前第1排煤柱上,充填回收可大幅降低超前煤柱的整体承载与应力大小,消除煤柱上的动载现象。

关键词: 综采固体充填, 垮落法, 房式煤柱, 风积沙, 动载破坏

Abstract: To investigate the force and stability of surrounding rock in recovering standing pillars with aeolian in fully-mechanized solid backfilling mining working face, the similar physical simulation method was used to compare and analyze the deformation of the surrounding rock and the stress characteristics of the coal pillar when the caving method and the backfilling method were used. Firstly, based on the similarity principle, the methods to simulate process and time control room mining stage, caving to recover pillars stage and backfilling to recover pillars stage were given, while the precompression of paper, plastic foam and sponge combination were chosen to simulate the stress-strain characteristics of aeolian backfilling material. The results showed that: 1) Comparing with caving method, backfilling with aeolian could reduce activity of overlying strata movement, delay and extend period of overlying strata movement, also could avoid failure of pillars and room roof caused by periodic weighting of main roof and hard formation in caving mining working face; 2) The maximum load were both found at the first rank pillars in front of working face whether caving method or backfilling was used to recover standing pillars, backfilling method could effectively reduce the overall load and the stress of standing pillars, and eliminate the phenomenon of dynamic load damage on these standing pillars.

Key words: fully-mechanized solid backfilling mining, caving method, room mining standing pillars, aeolian, dynamic load damage

中图分类号: TU453
[1] 吴林玉, 缪林昌, 孙潇昊, . 聚丙烯酰胺对酶诱导碳酸盐沉淀固沙效果影响[J]. 岩土力学, 2025, 46(5): 1573-1580.
[2] 田升奎, 刘观仕, 赵青松, 徐国方, 蔡铭炫, . 基于图像RGB信息测试湿度场技术的风积沙毛细水上升试验研究[J]. 岩土力学, 2023, 44(9): 2525-2536.
[3] 杜炜, 聂如松, 李列列, 谭永长, 张杰, 祁延录, . 考虑不同边界条件的风积沙−土工格栅拉拔试验离散元模拟研究[J]. 岩土力学, 2023, 44(6): 1849-1862.
[4] 肖飞, 孔令伟, 刘观仕, 冯衡, 董义义, 曾二贤, . 中密风积沙地层金属装配式基础抗拔模型试 验与承载力改进计算方法[J]. 岩土力学, 2022, 43(1): 65-75.
[5] 冯衡, 高斐略, 刘观仕, 高彬, 肖飞, 曾二贤, . 风积沙地基金属装配式基础的真型试验研究[J]. 岩土力学, 2021, 42(12): 3328-3334.
[6] 荣驰, 陈卫忠, 袁敬强, 张铮, 张毅, 张庆艳, 刘奇, . 新型水玻璃−酯类注浆材料及其固沙体特性研究[J]. 岩土力学, 2020, 41(6): 2034-2042.
[7] 陈家瑞,董 云,张 渊,蒋 洋,张继华,何春林,李西蒙,. 考虑倾角与开度的薄基岩裂隙溃沙特性研究[J]. , 2018, 39(S1): 244-250.
[8] 张 宏,王智远,刘润星. 科尔沁沙漠区风积沙动力压实特性研究[J]. , 2013, 34(S2): 100-104.
[9] 乾增珍 ,鲁先龙 ,丁士君  . 风积沙地基装配式偏心基础抗拔试验研究[J]. , 2013, 34(4): 1097-1102.
[10] 程永锋,丁士君. 沙漠地区风积沙地基输电线路装配式基础真型试验研究[J]. , 2012, 33(11): 3230-3236.
[11] 乾增珍 ,鲁先龙 ,丁士君. 塔克拉玛干沙漠输电线塔装配式基础试验研究[J]. , 2011, 32(8): 2359-2364.
[12] 乾增珍,鲁先龙,丁士君. 风积沙地基斜柱基础上拔水平力组合荷载试验[J]. , 2009, 30(1): 257-260.
[13] 张生辉,李志勇,彭 帝,陈忠明. 风积沙作为路基填料的静力特性研究[J]. , 2007, 28(12): 2511-2516.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!