Rock and Soil Mechanics ›› 2021, Vol. 42 ›› Issue (5): 1424-1433.doi: 10.16285/j.rsm.2020.0973

• Geotechnical Engineering • Previous Articles     Next Articles

Risk assessment model in TBM construction based on nonlinear fuzzy analytic hierarchy process

SONG Zhan-ping1, 2, GUO De-sai1, XU Tian1, HUA Wei-xiong3, 4   

  1. 1. School of Civil Engineering, Xi’an University of Architecture and Technology, Xi’an, Shaanxi 710055, China; 2. Shaanxi Key Laboratory of Geotechnical and Underground Space Engineering, Xi’an University of Architecture and Technology, Xi’an, Shaanxi 710055, China; 3. China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Tianjin 300300, China; 4. China Railway Construction Bridge Engineering Bureau Group No.2 Engineering Co., Ltd., Shenzhen, Guangdong 518083, China
  • Received:2020-07-08 Revised:2021-01-04 Online:2021-05-11 Published:2021-05-08
  • Supported by:
    This work was supported by the National Natural Science Foundation of China(51578447), the Innovation Capability Support Plan of Shaanxi Province- Innovation Team (2020TD-005) and the Science and Technology Project of Housing Urban-rural Construction in Shaanxi Province (2019-K39).

Abstract: Risk assessment of tunnel boring machine (TBM) construction is affected by many uncertain factors. The traditional fuzzy analytic hierarchy process (FAHP) tends to weaken the influence of some prominent risk factors due to the use of linear operators for calculating risk levels, reducing the accuracy of the final assessment results. This paper introduced a nonlinear operator into the comprehensive calculation of traditional FAHP, and established a new risk assessment model for TBM construction based on the nonlinear FAHP. Based on the work breakdown structure method (WBS) and the risk breakdown structure method (RBS), a risk assessment index system for TBM construction was also established. To calculate the weight of risk factors in the risk assessment index system and to construct the fuzzy relation matrix, analytic hierarchy process (AHP) and the membership vector obtained from the expert evaluation method were adopted. Through introducing the nonlinear operator, the weight of risk factors and fuzzy relation matrix were analyzed, and on this basis the final risk level for TBM construction was obtained based on the principle of the maximum membership degree. The proposed model was successfully applied to the risk assessment of a TBM crossing the F2-2 secondary fault in Yangtaishan Tunnel of Shenzhen metro and the risk level of TBM construction crossing the fault section was determined to be level 4, which was a high risk. Finally, to further verify the reliability of the proposed model, the difference between the new risk assessment model and the traditional FAHP evaluation method was discussed based on the Yangtaishan Tunnel project.

Key words: tunnel engineering, TBM construction, risk assessment, nonlinear, fuzzy analytic hierarchy process

CLC Number: 

  • TU 451
[1] NIE Yao-wu, HU Bing, GU Lei-yu, LI Bin, ZHOU Quan-chao, LI Wen-hui, LI Qi, LI Xia-ying, . Numerical simulation on safety risk assessment of coal mining with CO2 geological storage [J]. Rock and Soil Mechanics, 2025, 46(S1): 491-506.
[2] LIU Wen, FAN Jin-yang, LIU Wen-hao, CHEN Jie, LIU Wei, WU Fei, . Stress relaxation characteristics of salt rock under the action of air barometric stress coupling [J]. Rock and Soil Mechanics, 2025, 46(8): 2434-2448.
[3] WU Bing, SHENG Jian-long, YE Zu-yang, ZHOU Xin, . Nonlinear seepage-normal stress coupling model for single fracture of rock mass [J]. Rock and Soil Mechanics, 2025, 46(8): 2495-2504.
[4] CHEN Deng-hong, ZHANG Xin-han, LIU Yun-hui, HU Hao-wen, LIU Yun-long, LIANG Yu-xiang, . Nonlinear seismic response analysis of high arch dam-irregular foundation- reservoir water system based on octree scaled boundary finite element method [J]. Rock and Soil Mechanics, 2025, 46(8): 2586-2599.
[5] ZHANG Chun-shun, LIN Zheng-hong, YANG Dian-sen, CHEN Jia-rui, . Nonlinear elastic constitutive model of coarse-grained soils considering the effect of initial grain size distribution [J]. Rock and Soil Mechanics, 2025, 46(3): 750-760.
[6] TIAN Shu-ping, WANG Zhen-yu, ZHANG Chen-rong, . Nonlinear resonance characteristics of offshore wind turbines with large diameter monopile foundation [J]. Rock and Soil Mechanics, 2025, 46(1): 156-164.
[7] LEI Guo-ping, WU Ze-xiong, SU Dong, MO Ye-qiang, CHENG Ma-yao, . A p-y method for calculating micro anti-slide piles considering pile material nonlinearity [J]. Rock and Soil Mechanics, 2024, 45(S1): 337-348.
[8] SHI Xiu-song, ZHOU Gao-zhang, LIU Lei-lei, . Stability of tunnel face in overconsolidated soil layer based on nonlinear Hvorslev surface [J]. Rock and Soil Mechanics, 2024, 45(9): 2595-2610.
[9] SUN Jin-xin, LU Meng-meng, LIU Gan-bin, . Nonlinear consolidation analysis for combined composite ground with high replacement ratio-granular columns and impervious columns [J]. Rock and Soil Mechanics, 2024, 45(8): 2421-2436.
[10] FENG Shi-jin, XU Yi, YANG Jun-yi, ZHENG Qi-teng, ZHANG Xiao-lei, . Risk assessment of landfill instability based on set pair-combination weighting [J]. Rock and Soil Mechanics, 2024, 45(7): 2129-2139.
[11] JIANG Xue-hui, YAN Jian-wei, LUO Wen-jun, LI Jia-bao, XU Chang-jie. Analytical solution for mechanical properties of tunnel influenced by longitudinal pressure and reinforced steel plate [J]. Rock and Soil Mechanics, 2024, 45(6): 1623-1632.
[12] WANG Yi-yang, LI Chuan-xun, LI Kuo, LU Xiang-zong. Analytical solutions for large-strain nonlinear consolidation of soils with vertical drain [J]. Rock and Soil Mechanics, 2024, 45(5): 1446-1456.
[13] DENG Dong-ping, YANG Chun-hui, XIE Zhi-jun, . M-P method for analyzing the long-term stability of slope reinforced by pre-stressed cables under the nonlinear M-C strength criterion [J]. Rock and Soil Mechanics, 2024, 45(4): 1051-1066.
[14] LEI Guo-ping, SU Dong, CHENG Ma-yao, LIU Hui-fen, ZHANG Wei, . Incremental calculation method of foundation pit enclosure structure and softening p-y curves based on stiffness reduction process of the soil springs in the passive zone [J]. Rock and Soil Mechanics, 2024, 45(3): 797-808.
[15] XU Bin, WANG Xing-liang, PANG Rui, CHEN Ke-hao, . Elastoplastic constitutive model of sand-gravel composites accounting for fabric evolution effects [J]. Rock and Soil Mechanics, 2024, 45(11): 3197-3211.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!