›› 2018, Vol. 39 ›› Issue (5): 1867-1876.doi: 10.16285/j.rsm.2016.1221

• Numerical Analysis • Previous Articles     Next Articles

Shield tunnel structure information modelling method based on building information modeling technology

ZHONG Yu1, 2, 3, CHEN Jian1, 2, CHEN Guo-liang1, 2, WU Jia-ming1, 2   

  1. 1. State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan, Hubei 430071, China; 2.University of Chinese Academy of Sciences, Beijing 100049; 3. Wuhan Metro Group Co., Ltd., Wuhan, Hubei 430070, China
  • Received:2016-05-27 Online:2018-05-11 Published:2018-06-12
  • Supported by:

    This work was supported by the Science and Technology Service Network Initiative(KFJ-EW-STS-122), the Key Programs of the Chinese Academy of Sciences and One Hundred Person Project of the Chinese Academy of Sciences(KZZD-EW-TZ-12).

Abstract: With the purpose of solving the problem of model sharing among stages of shield tunnel construction, an IFC-based data model of shield tunnel was built in previous research. Based on the IFC-based data model, a BIM-based shield tunnel structure information modelling method is introduced in this paper. According to the extended IFC description of shield tunnel information model, the modelling method of single segment and flow and process of tunnel axis are proposed. Based on this, a shield tunnel assembling method is built, as well as a flow chart and a parametric modelling method of shield tunnel. By this way, the BIM-based shield tunnel structure modelling method is formed. The modelling method is examined by applying it to a metro shield tunnel case. The research shows that, by introducing the concept and technology of BIM, it is suitable for the communication and sharing of the information of shield tunnel structure that builds the shield tunnel structure information model based on the uniform IFC standard. The validity of the IFC-based data model of shield tunnel is verified further. The result in this paper can provide the initial model for numerical calculation and analysis, and provide foundation for realizing seamless connection of visualization model and analytical model.

Key words: building information modelling, extension of industry foundation class, shield tunnel information model, modelling method

CLC Number: 

  • TU 717

[1] ZHU De-fu, TU Shi-hao, YUAN Yong, MA Hang-sheng, LI Xiang-yang, . An approach to determine the compaction characteristics of fractured rock by 3D discrete element method [J]. , 2018, 39(3): 1047-1055.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!