Research on utility tunnel foundation treated by compaction piles and post-work immersion test in self-weight collapsible loess area with large thickness

ZHU Yan-peng1, 2, DU Xiao-qi1, 2, YANG Xiao-hui1, 2, LI Hui-jun1, 2   

  1. 1. College of Civil Engineering, Lanzhou University of Technology, Lanzhou, Gansu 730050, China; 2. Western Center of Disaster Mitigation in Civil Engineering of Ministry of Education, Lanzhou University of Technology, Lanzhou, Gansu 730050, China
  • Received:2018-01-28 Online:2019-08-12 Published:2019-08-24
  • Supported by:
    This work was supported by the Yangtze River Scholar Innovation Team Support Program of Ministry of Education of China(IRT-17R51) and the Major Projects of Science and Technology Plan Projects of Gansu Province (1302FKDA030).

Abstract: This study determined the reasonable treatment range of utility tunnel foundation in self-weight collapsible loess with large thickness. Meanwhile, the regularity of the compacting effect on the foundation was revealed with various treatment depths, and the infiltration law and settlement characteristics of composite foundation after immersion were analyzed. With different depths of lime soil (pure soil) compaction piles, the foundation treatment experiments were conducted on the collapsible loess with large thickness. Moreover, post-work immersion tests were carried out by embedding TDR moisture meter and layered settlement instrument. The results show that with increasing the treatment depth of composite foundation, the impermeability of composite foundation, compacting effect and dry density of soil between piles all increase. The external water presents distinct multistage infiltration in composite foundation, including four stages basically. The deformation of wetting soil between piles decreases with the increase of the foundation treatment depth. Besides, it shows obvious five stages. According to the research results, under the condition of effective waterproof measures, the reasonable treatment range is summarized as follows: the treatment depth should be controlled in the range of 9-12 m, and the treatment width should be controlled within 2 m extended from each side of tunnel.

Key words: self-weight collapsible loess with large thickness, utility tunnel foundation, compaction piles, reasonable treatment range, post-work immersion test, infiltration law

CLC Number: 

  • TU 444
[1] WANG Jun-lin , HU Cai-hong , ZHU Yan-zhi , HU Ming-xin,. Testing study on the bearing capacity of the ram-compaction piles with composite bearing base [J]. , 2006, 27(S2): 875-878.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!