Measurement and Analysis of Vertical Displacements of Loess Test Section in Jundu Shan Tunnel

Zhu Jiaqiao; Zhu Weishen   

  • Online:1988-03-19 Published:2017-06-21

Abstract: The Vertical displacements on the crown during excavation is monitored with WRM-3 type extensometer. Successful prediction of extensive coupes in a shallow buried loess tunnel with a large span is made. The emphasis of this paper is put on the interpretation of the whole measuring process at borehole 2. The relations between displacement and excavation of the tunnel, relative displacements in the ground and the surface subsidence are discussed tentatively. The results indicate that monitoring vertical displacements under this engineering condition is very important to ensure the stability and safe excavation of the tunnel. Finally, some conclusions are drawn that the largest vertical displacement during the excavation of top part (about 1/3 height ) of the tunnel occurred when the working surface was in the distance of 1.2 tunnel diameters from the measuring hole and that the change of vertical displacements was small during the excavation of the low part, which was equal to 30—40% of the largest one.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] LI Ying-yong,ZHANG Ding-li,ZHANG Hong-bo,SONG Xiu-guang. Research on failure mechanism and effects of prestressed anchor cables for reinforcing slopes[J]. , 2010, 31(1): 144 -150 .
[2] LI Jing,MIAO Lin-chang,ZHONG Jian-chi,FENG Zhao-xiang. Deformation and damping characteristics of EPS beads-mixed lightweight soil under repeated load-unloading[J]. , 2010, 31(6): 1769 -1775 .
[3] WANG Shui-lin,WU Zhen-jun,LI Chun-guang,TANG Hua. Modeling of strain-softening and analysis of a lining for circular tunnel[J]. , 2010, 31(6): 1929 -1936 .
[4] ZHANG Yong-xing, LU Li, RAO Xiao-yu, LI Jian. Model test research on mechanical behavior of compression type rock bolt[J]. , 2010, 31(7): 2045 -2050 .
[5] WANG Yi-zhong,LI Yong-quan,FU Xu-dong. Finite element calculation of NATM construction of Qiushui mountain tunnel beneath Jihe expressway[J]. , 2011, 32(1): 125 -131 .
[6] LI Xiu-zhen,WANG Cheng-hua,DENG Hong-yan. A comparison of distance and Fisher discrimination methods applied to identifying potential landslides[J]. , 2011, 32(1): 186 -192 .
[7] KONG Xiang-xing, XIA Cai-chu, QIU Yu-liang, ZHANG Li-ying, GONG Jian-wu. Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region[J]. , 2011, 32(2): 516 -524 .
[8] WANG Zhen-hong,ZHU Yue-ming,WU Quan-huai,ZHANG Yu-hui. Thermal parameters of concrete by test and back analysis[J]. , 2009, 30(6): 1821 -1825 .
[9] JI Wu-jun. Investigation and analysis of engineering problems for loess tunnels[J]. , 2009, 30(S2): 387 -390 .
[10] ZHENG Gang ZHANG Li-ming DIAO Yu. Analysis of working performance of piles beneath excavation bottom and settlement calculation[J]. , 2011, 32(10): 3089 -3096 .