›› 2005, Vol. 26 ›› Issue (11): 1711-1716.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Research on key technique of shield tunnel construction beneath adjacent existing highway tunnel

ZHANG Zhi-qiang, HE Chuan   

  1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031,China
  • Received:2004-05-28 Online:2005-11-10 Published:2014-01-03

Abstract: The mechanical behaviour of shield tunnel construction beneath adjacent existing highway tunnel is studied by using three-dimensional finite element numerical simulation method. The research demonstrates that it is dangerous to increase jack forces of the shield machine across adjacent upper existing highway tunnel which is considered as a kind of unloading structure. In addition, the jack forces of the shield machine is needed to be drop down to the limit value at 6 m distance from the edge of upper existing highway tunnel and the measurement of the existing highway tunnel floor is enhanced in advancement process of shield machine to guarantee the safety of upper existing structure.

Key words: shield tunnel construction, adjacent existing upper structure, three-dimensional finite element

CLC Number: 

  • TU 454
  • Please send e-mail to pingzhou3@126.com if you would like to read full paper in English for free. Parts of our published papers have English translations.
[1] WU Cheng-jie , YU Feng , GONG Xiao-nan , LIN Cun-gang , LIANG Rong-zhu , . Influence of excavation unloading on vertical bearing behavior of existing pile groups [J]. , 2014, 35(9): 2602-2608.
[2] JIANG Xin-liang,LI Lin,YUAN Jie,YIN Jia-shun. Dynamic analysis of strata horizontal displacements induced by shield construction of deep tunnel [J]. , 2011, 32(4): 1186-1192.
[3] CHEN Yu,ZHANG Qing-he,ZHU Ji-wen,YAO Hai-ming. Coupled fluid-mechanical analysis of DOT shield tunnel construction beneath adjacent existing underpass [J]. , 2010, 31(6): 1950-1955.
[4] SUN Xi-yuan, LUAN Mao-tian, TANG Xiao-wei. Study of horizontal bearing capacity of bucket foundation on saturated soft clay ground [J]. , 2010, 31(2): 667-672.
[5] FEI Kang,LIU Han-long. Field test study and numerical analysis of a geogrid- reinforced and pile-supported embankment [J]. , 2009, 30(4): 1004-1012.
[6] TU Yu-min, YU Ya-nan. 3D finite element analysis of bending characteristics of passive row piles [J]. , 2008, 29(2): 342-347.
[7] CHEN Fu-quan, HOU Yong-feng, LIU Yu-chuan. Numerical analysis of soil arching effects in displaced passive piles considering lateral soil movements [J]. , 2007, 28(7): 1333-1337.
[8] HAN Zhi-xing, WANG Ning. Analysis of structural parameters for dipping at high angle and thick orebody with upward horizontal slicing and filling non-pillar continuous mining [J]. , 2007, 28(2): 367-370.
[9] TU Yu-min, Wang Jian-jiang. Study on negative friction characteristic of row piles subjected to surcharge nearby [J]. , 2007, 28(12): 2652-2656.
[10] TU Yu-min, YU Ya-nan. Characteristics of horizontal bearing capacity of rigid pile composite foundation [J]. , 2007, 28(11): 2329-2332.
[11] DING Xuan-ming, LIU Han-long . Study on applicability of low strain dynamic testing on cast-in-situ concrete thin-wall pipe pile [J]. , 2006, 27(S2): 784-790.
[12] XIONG Chun-bao ,LEI Li-gang ,ZOU Ke-peng ,YANG Hua-jing,. Internal force and deformation by 3D finite element analysis of support system of a typical deep excavation on soft ground [J]. , 2006, 27(S1): 701-705.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] LI Ying-yong,ZHANG Ding-li,ZHANG Hong-bo,SONG Xiu-guang. Research on failure mechanism and effects of prestressed anchor cables for reinforcing slopes[J]. , 2010, 31(1): 144 -150 .
[2] LIANG Jian-wei, FANG Ying-guang, GU Ren-guo. Analysis of microelectric field effect of seepage in tiny-particle clay[J]. , 2010, 31(10): 3043 -3050 .
[3] WANG Li-yan,JIANG Peng-ming,LIU Han-long. Mechanism analysis of residual liquefied deformation of breakwater during earthquake[J]. , 2010, 31(11): 3556 -3562 .
[4] LI Xiu-zhen,WANG Cheng-hua,DENG Hong-yan. A comparison of distance and Fisher discrimination methods applied to identifying potential landslides[J]. , 2011, 32(1): 186 -192 .
[5] KONG Xiang-xing, XIA Cai-chu, QIU Yu-liang, ZHANG Li-ying, GONG Jian-wu. Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region[J]. , 2011, 32(2): 516 -524 .
[6] WANG Zhen-hong,ZHU Yue-ming,WU Quan-huai,ZHANG Yu-hui. Thermal parameters of concrete by test and back analysis[J]. , 2009, 30(6): 1821 -1825 .
[7] JI Wu-jun. Investigation and analysis of engineering problems for loess tunnels[J]. , 2009, 30(S2): 387 -390 .
[8] CHEN Li-hua , LIN Zhi , LI Xing-ping. Study of efficacy of systematic anchor bolts in highway tunnels[J]. , 2011, 32(6): 1843 -1848 .
[9] ZHENG Gang ZHANG Li-ming DIAO Yu. Analysis of working performance of piles beneath excavation bottom and settlement calculation[J]. , 2011, 32(10): 3089 -3096 .
[10] ZHAO Ming-hua, LEI Yong, ZHANG Rui. Study of punching failure mode and safe thickness of pile foundation in karst region[J]. , 2012, 33(2): 524 -530 .