›› 2006, Vol. 27 ›› Issue (5): 723-729.
• Fundamental Theroy and Experimental Research • Previous Articles Next Articles
SHI An-chi, XU Wei-ya, ZHANG Gui-ke
CLC Number:
[1] | FU Dai-guang, ZHOU Li-ming, XIAO Guo-qiang, WANG Fa-gang. Analysis of influence of filter frequency band on tunnel seismic prediction results [J]. Rock and Soil Mechanics, 2018, 39(S2): 315-325. |
[2] | LI Ning, GUO Shuang-feng, YAO Xian-chun,. Further study of stability analysis methods of high rock slopes [J]. , 2018, 39(2): 397-406. |
[3] | XIAO Qi-hang , XIE Chao-juan . Application of tunnel seismic tomography to tunnel prediction in karst area [J]. , 2012, 33(5): 1416-1420. |
[4] | LI Xin-ping, DAI Yi-fei, LIU Jin-huan, ZENG Ming , LIU Li-sheng, ZHANGKai-g. Test study and numerical simulation analysis of explosion in steel tubes [J]. , 2009, 30(S1): 5-9. |
[5] | ZHOU Hua,WANG Guo-jin1,,FU Shao-jun,ZOU Li-chun,CHEN Sheng-hong. Finite element analysis of foundation unloading and relaxation effects of Xiaowan Arch Dam [J]. , 2009, 30(4): 1175-1180. |
[6] | HE Zheng,XU Wei-ya,SHI Chong,LI Ming-wei,ZHAO Yi. 3D dynamic response back analysis of failure mechanisms of a high dip bedding rock slope in earthquake [J]. , 2009, 30(11): 3512-3518. |
[7] | SUN Shu-wei , MA Hui-min , ZHANG Zhong-ping . Study on disturbed zone of cutting bedding high rock slope [J]. , 2008, 29(6): 1665-1668. |
[8] | HE Xi-ping ,HUA Xi-sheng ,HE Xiu-feng . Weighted multi-point grey model and its application to high rock slope deformation forecast [J]. , 2007, 28(6): 1187-1191. |
[9] | YANG Shu-xin , XU Zhao-yi , LI hong,. Characterization of stress distribution before and after excavation in permanent shiplock of Three Gorges Project [J]. , 2006, 27(S2): 61-65. |
[10] | CHEN Xiao-bin ,ZHANG Jia-sheng ,AN Guan-feng ,LIU Xue-peng,. Two dimensional elastoplastic distinct element analysis of high rock slope [J]. , 2006, 27(S1): 1112-1118. |
[11] | DAI Hui-chao , ZHU Yue-ming , TIAN Bin . Three-dimensional numerical simulation on perclolation of rainfall in rock mass slope of Three Gorges Project ship lock [J]. , 2006, 27(5): 749-753. |
|