›› 2007, Vol. 28 ›› Issue (2): 367-370.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Analysis of structural parameters for dipping at high angle and thick orebody with upward horizontal slicing and filling non-pillar continuous mining

HAN Zhi-xing, WANG Ning   

  1. Southwest University of Science and Technology, Mianyang 621010, China
  • Received:2005-03-28 Online:2007-02-10 Published:2013-08-28

Abstract: Non-pillar continuous mining is high-efficient mining technology. It is a general tendency to carry out this mining technology in underground mine. Dipping at high angle and thickness ore-body with upward horizontal slicing and filling non-pillar continuous mining was briefly introduced as an example of continuous mining methode in a Pb-Zn mine. The elastoplastic three-dimensional finite element analysis technique was employed to simulate the practical excavation and backfilling mining activities. Stope stability status with different height of slice , the numbers of pre-slicing and the exposed areas was analyzed so as to provide the optimum stoping structural parameters for mine operation.

Key words: dipping at high angle and thickness ore-body, upward horizontal slicing and filling non-pillar continuous mining, stope structural parameters, the elastic-plastic three-dimensional finite elements

CLC Number: 

  • TB 115
  • Please send e-mail to pingzhou3@126.com if you would like to read full paper in English for free. Parts of our published papers have English translations.
  • Please send e-mail to pingzhou3@126.com if you would like to read full paper in English for free. Parts of our published papers have English translations.
  • [1] ZHAO Hong-bo,. Recognition of critical slip surface based on GA and SVM [J]. , 2006, 27(11): 2011-2014.
    [2] HE Ze-gan, CHEN Sheng-hong. Application of mixed genetic-simulated annealing algorithms to slope stability analysis [J]. , 2004, 25(2): 316-319.
    Viewed
    Full text


    Abstract

    Cited

      Shared   
      Discussed   
    [1] LU Zu-de, CHEN Cong-xin, CHEN Jian-sheng, TONG Zhi-yi, ZUO Bao-cheng. Field shearing test for heavily weathered hornstone of Three Phase Project of Ling'ao Nuclear Power Station[J]. , 2009, 30(12): 3783 -3787 .
    [2] MI Hai-zhen, GAO Chun. Experimental study of expansive behaviors of quicklime[J]. , 2010, 31(4): 1253 -1256 .
    [3] SU Kai, WU He-gao, ZHOU Chuang-bing. Study of combined bearing characteristics of lining and surrounding rock for hydraulic tunnel under internal water pressure[J]. , 2010, 31(8): 2407 -2412 .
    [4] DONG Xiao-qiang,BAI Xiao-hong,Lü Yong-kang,XU Pei-hong. Experimental study of effects of pollution on electric resistivity characteristics of soil-cement[J]. , 2011, 32(1): 91 -94 .
    [5] HU Bo,ZHAO Hai-bin,WANG Si-jing,LIU Hai-ning,PENG Yun-dong,LIU Xiao-li,ZHA. Pull-out model test for tunnel anchorage and numerical analysis[J]. , 2009, 30(6): 1575 -1582 .
    [6] CHEN Jie-jin,ZHOU Feng,YANG Jun-sheng,LIU Bao-chen. Fuzzy analytic hierarchy process for risk evaluation of collapse during construction of mountain tunnel[J]. , 2009, 30(8): 2365 -2370 .
    [7] REN Song, GUO Song-tao, JIANG De-yi, YANG Chun-he. Study of creep similar model and creep equivalent material of salt rock[J]. , 2011, 32(S1): 106 -110 .
    [8] FAN Heng-hui ,GAO Jian-en ,WU Pu-te ,LOU Zong-ke. Analysis of influence factors for solidified soil strength based on change of physicochemical properties of loess[J]. , 2011, 32(7): 1996 -2000 .
    [9] CHEN Ming , HU Ying-guo , LU Wen-bo , YAN Peng , ZHOU Chuang-bing. Blasting excavation induced damage characteristics of diversion tunnel for Jinping cascade II hydropower station[J]. , 2011, 32(S2): 172 -177 .
    [10] LI Jian ,TAN Zhong-sheng ,YU Yu ,NI Lu-su. Research on construction procedure for shallow large-span tunnel undercrossing highway[J]. , 2011, 32(9): 2803 -2809 .