›› 2007, Vol. 28 ›› Issue (4): 723-727.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Research on optimized construction procedure for double-arched tunnel in unsymmetrical pressure

ZHANG Zhi-qiang, HE Chuan   

  1. 1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China; 2. Educational Ministry Key Laboratory of Southwest Resources Development and Environmental Disaster Control Engineering, Chongqing University Chpngqing 400044, China
  • Received:2005-05-13 Online:2007-04-10 Published:2013-09-05

Abstract: Based on mechanical analysis of construction progress of double-arched tunnel under unsymmetrical pressure, the two kinds of partial pressures effects are put forward, which influence together the loaded state of double-arched tunnel. One of them is result from shallow depth ground partial pressure, named ‘terrain partial pressure’, the other is caused by construction order of the two bore of double-arched tunnel, named ‘construction progress partial pressure’. The result demonstrates that the direction of oblique load in ‘terrain partial pressure’ is definite and unchangeable, i.e. the direction of oblique load is from the inside of hill to the outside of hill-slope; the direction of oblique load caused by ‘construction progress’ depends on the early and late construction order of the two bore of double-arched tunnel; the study shows that the direction of oblique load is from the early excavated bore side to the late bore side. As a result, the procedure of the early excavation of external bore closed to the hill-slope is considered as the optimized construction procedure for double-arched tunnel under unsymmetrical pressure, since the oblique load caused by construction progress can be applied to balance out partial load in ‘terrain partial pressure’. The above conclusion is made use of the modification design and construction of double-arched tunnels under unsymmetrical pressure of Jinhua to Lishui highway in Zhe jiang province.

Key words: double-arched tunnel, center-pillar, unsymmetrical pressure, optimized construction procedure

CLC Number: 

  • U 451+.1
  • Please send e-mail to pingzhou3@126.com if you would like to read full paper in English for free. Parts of our published papers have English translations.
[1] ZUO Qing-jun , WU Li , LU Zhong-le , TAN Yun-zhi , YUAN Qing,. Instability analysis of soft surrounding rock in shallow tunnel portal under unsymmetrical pressure by catastrophe theory [J]. , 2015, 36(S2): 424-430.
[2] LIU Xiao-jun , ZHANG Yong-xing , GAO Shi-jun , HUANG Da, YANG Chao . Mechanism analysis and treatment technique of surrounding rock instability for tunnel portal section in weak surrounding rock [J]. , 2012, 33(7): 2229-2234.
[3] TANG Ming-ming,WANG Zhi-yin,LI Yun-peng. Study of construction methods for crossing bias small interval highway tunnel [J]. , 2011, 32(4): 1163-1168.
[4] DU Ju-hong,HUANG Hong-wei. Dynamic simulation analysis of displacement field of bias closely spaced tunnel with altitude difference [J]. , 2009, 30(4): 1102-1108.
[5] ZHU Zheng-guo, QIAO Chun-sheng, GAO Bao-bin. Analysis of construction optimization and supporting structure under load of shallow multi-arch tunnel under unsymmetrical pressure [J]. , 2008, 29(10): 2747-2752.
[6] WANG Shao-qiang , QIAO Chun-sheng , XU Gan-cheng , ZHU Zheng-guo,. Deformation and stress distribution of middle-wall for asymmetrically-loaded double-arch tunnel under complicated geological conditions [J]. , 2007, 28(S1): 449-454.
[7] LI Zhi-yong , YAN Li , YANG Jun-sheng . Numerical analysis and treatment of a collapsed middle drift for shallow multi-arch tunnel under unsymmetrical pressure [J]. , 2007, 28(1): 102-106.
[8] WANG Shu-gang, LI Shu-cai, WANG Gang, WANG Xiang-gang, LIN Chun-jin. Research on construction technique and stability analysis of outlet in shallow tunnel under unsymmetrical pressure [J]. , 2006, 27(S1): 364-368.
[9] WANG Sheng-hui , DU Xiao-ping , YUAN Yong , ZHANG Yong-wu , DU Guo-ping , LIU Liang,. Effects of different excavating sequences on mid-partition of double-arched tunnel [J]. , 2004, 25(7): 1102-1106.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] YIN Xiao-tao, WANG Shui-lin, MA Shuang-ke, LIU Zhi-wen. Study of stability and accumulation mechanism of colluvium affected by change of strength property[J]. , 2010, 31(2): 620 -626 .
[2] GONG Feng-qiang, LI Xi-bing, ZHANG Wei. Rockburst prediction of underground engineering based on Bayes discriminant analysis method[J]. , 2010, 31(S1): 370 -377 .
[3] QIAN Ji-yun, ZHANG Ga, ZHANG Jian-min. Centrifuge model tests for deformation mechanism of soil slope during rainfall[J]. , 2011, 32(2): 398 -402 .
[4] BI Zhong-wei, ZHANG Ming, JIN Feng, DING De-xin. Dynamic response of slopes under earthquakes[J]. , 2009, 30(S1): 180 -183 .
[5] WANG Ke-liang, LIU Ling, SUI Tong-bo , XU Yun-hai, HU Ting-zheng. Experiment research on anti-shear(cut)performance of dam bedrock-rubber powder modified concrete in-situ[J]. , 2011, 32(3): 753 -756 .
[6] WANG Lin , YANG Hai-peng , NIE Qing-ke. Numerical simulation for building settlements and its distribution characteristics using engineering analogy[J]. , 2009, 30(S2): 485 -488 .
[7] LU Xiao-bing , ZHANG Xu-hui , CUI Peng. Numerical simulation of clastic grain flow along a slope[J]. , 2009, 30(S2): 524 -527 .
[8] LIU Zhao-chun , CHAI Jun-rui , JIA Xiao-mei , QIN lei , SUN Xu-shu. Numerical simulation of concentration diffusion of harmful gas in heading face with forced ventilation[J]. , 2009, 30(S2): 536 -539 .
[9] JIN Xu-hao , LU Wen-bo , TIAN Yong , YAN Peng , CHEN Ming. Analysis of mechanisms of S wave generated in rock blasting process[J]. , 2011, 32(S2): 228 -232 .
[10] CHEN Wei-zhong , CAO Jun-jie , YU Hong-dan , JIA Shan-po , CHEN Pei-shuai. Study of elastoplastic constitutive model of strongly weathered granite Ⅱ: Engineering application[J]. , 2011, 32(12): 3541 -3547 .