›› 2007, Vol. 28 ›› Issue (6): 1275-1279.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Analysis of influence of blasting vibration on middle wall of a double-arch tunnel

SHI Ya-xin,WANG Ming-nian,LI Qiang   

  1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
  • Received:2005-07-18 Online:2007-06-11 Published:2013-09-13

Abstract: The double-arch tunnel is built usually by the full-face method under the condition of surrounding rock masses grade II and grade III. Vibration of blasting has been simulated and analyzed by three-dimensional numerical simulation during construction process of the double-arch tunnel; and the influence of blasting vibration on the middle wall of the double-arch tunnel caused by the rear tunnel is studied. The result indicates that the blasting of the rear tunnel creates much effect on the middle wall of the double-arch tunnel; there is a great need for protection to reduce disturbance of middle wall caused by blasting vibration; and temporary support will be destroyed.

Key words: vibration of blasting, double-arch tunnel, 3D-FEM, middle wall

CLC Number: 

  • U 451
  • Please send e-mail to pingzhou3@126.com if you would like to read full paper in English for free. Parts of our published papers have English translations.
[1] ZHANG Jun-ru , SUN Ke-guo , LU Feng , ZHENG Zong-xi , SUN Qi-qing,. Model test study of surrounding rock pressure distribution and mechanical characteristics of unequal-span double-arch railway tunnel [J]. , 2015, 36(11): 3077-3084.
[2] QIU Chang-lin , LIU Bin , HE Lin-sheng , FENG Shou-zhong . Model test and in-situ monitoring of double-arch tunnel with integrated middle wall [J]. , 2012, 33(9): 2625-2631.
[3] LI Ying-yong ,FENG Xian-da ,LI Shu-cai ,LI Shu-chen ,YUAN Chao ,LI Xin-zhi ,XU Qin-jian. Analysis of evolution process of rock collapse on top of middle wall in an extremely shallow double arch tunnel [J]. , 2011, 32(9): 2747-2752.
[4] WANG Kai,ZHANG Cheng-ping,WANG Meng-shu. Asymmetric double-arch subsea tunneling-induced ground deformation analysis [J]. , 2011, 32(9): 2771-2777.
[5] WANG Zhen-wei, FU gang. Analysis and prediction of surface subsidence of double-arch tunnel construction in city [J]. , 2009, 30(S2): 418-421.
[6] JIN Feng-nian,WANG Bo,JIANG Mei-rong. Numerical analysis of stability of wall-rock of double-arch tunnel through fractured mountain body [J]. , 2008, 29(S1): 227-231.
[7] ZHANG Meng-xi, LI Gang, FENG Jian-long, HE Xiao-qiang. Coupling analysis of surrounding rocks in double-arch tunnel by FE and BP neural networks [J]. , 2008, 29(5): 1243-1248.
[8] ZHAO Dong-ping, WANG Ming-nian. Study on treatment schemes of an expressway multi-arch tunnel middle wall [J]. , 2008, 29(3): 828-832.
[9] WANG Shao-qiang , QIAO Chun-sheng , XU Gan-cheng , ZHU Zheng-guo,. Deformation and stress distribution of middle-wall for asymmetrically-loaded double-arch tunnel under complicated geological conditions [J]. , 2007, 28(S1): 449-454.
[10] WANG Zhen-wei, FU Gang, HUANG Zhi-qiang. Study of construction plans above cities’double-arch tunnel [J]. , 2007, 28(S1): 527-530.
[11] SHEN Yu-sheng, GAO Bo. Site monitoring and analytical research on mechanical characteristics under construction partial press in double-arch tunnel [J]. , 2006, 27(11): 2061-2065.
[12] YU Ning, ZHU He-hua, . Analysis of earth deformation caused by shield tunnel construction and 3D-FEM simulation [J]. , 2004, 25(8): 1330-1334.
[13] YU Zhen-yi ,WEI Gang,. Factors analysis of parallel underground pipelines displacements affected by pipe jacking [J]. , 2004, 25(3): 441-445.
[14] DENG Jian ,ZHU He-hua ,DING Wen-qi,. Finite element simulation of whole excavation operation of a unequal-span double-arch tunnel [J]. , 2004, 25(3): 477-480.
[15] AN Guan-feng , LU Liang. 3D-FEM research on settlement of earth-fill bridge-slope on the soft clay basement after construction [J]. , 2000, 21(3): 247-251.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] TANG Ming-ming, WANG Zhi-yin, MA Lan-ping, ZENG Zhi-hua, ZHANG Zhi-pei. Study of design parameters of oil-gas pipeline traversing loess gully[J]. , 2010, 31(4): 1314 -1318 .
[2] XU Ming, CHEN Jin-feng, SONG Er-xiang. Large scale triaxial testing of Douposi moderately-to-slightly weathered fill materials[J]. , 2010, 31(8): 2496 -2500 .
[3] LIN Hang,CAO Ping,LI Jiang-teng,JIANG Xue-liang,HE Zhong-ming. Deformation stability of three-dimensional slope based on Hoek-Brown criterion[J]. , 2010, 31(11): 3656 -3660 .
[4] WEI Ning,LI Xiao-chun,WANG Yan,GU Zhi-meng. Resources quantity and utilization prospect of methane in municipal solid waste landfills[J]. , 2009, 30(6): 1687 -1692 .
[5] NIU Wen-jie,YE Wei-min,LIU Shao-gang,YU Hai-tao. Limit analysis of a soil slope considering saturated-unsaturated seepage[J]. , 2009, 30(8): 2477 -2482 .
[6] WANG Ke-liang, LIU Ling, SUI Tong-bo , XU Yun-hai, HU Ting-zheng. Experiment research on anti-shear(cut)performance of dam bedrock-rubber powder modified concrete in-situ[J]. , 2011, 32(3): 753 -756 .
[7] LIN Da-ming1,2,SHANG Yan-jun1,SUN Fu-jun3,SUN Yuan-chun1,2,WU Feng-bo1,2,LIU Zhi. Study of strength assessment of rock mass and application[J]. , 2011, 32(3): 837 -842 .
[8] WU Jian,FENG Shao-kong,LI Hong-jie. Study of automatically extracting structural plane parameters from borehole images[J]. , 2011, 32(3): 951 -957 .
[9] LI Jian-jun,SHAO Sheng-jun,YANG Fu-yin,YANG Chun-ming. Experimental research on impermeable characteristics of slurry cake in cutoff wall hole of coarse-grained soil[J]. , 2012, 33(4): 1087 -1093 .
[10] LI Hui , YAN E-chuan , YANG Jian-guo , Lü Kun . Study of interaction of landslide mass and retaining wall under condition of reservoir water[J]. , 2012, 33(5): 1593 -1600 .