›› 2008, Vol. 29 ›› Issue (6): 1562-1568.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Displacement back analysis of rock mechanical parameters of large-scale underground powerhouse with unloading surrouding rockmass

DONG Zhi-hong1, DING Xiu-li1, LU Bo1, ZHANG-Feng2, ZHANG Lian1   

  1. 1. Yangtze River Scientific Research Institute; Key Laboratory of Geothechnical Mechanics and Engineering of the Ministry of Water Resources,Wuhan, 430019,China ; 2. Yangtze River Investigation, Planning, Design & Research Institute,Wuhan, 430019,China
  • Received:2006-10-10 Online:2008-06-10 Published:2013-07-15

Abstract: Displacement back analysis based on the in-situ measured information is one of the important parts that compose the dynamics measurement-control and information-oriented construction of the underground project. On the basis of measured displacements of surrounding rockmass , a system analysis method for back analysis of rock mechanics mechanical is established, which is used to gain the unloading surrounding rock mechanical parameters of the large-scale underground powerhouse (excavating span 30 meters and height 78.5 meters) of Pengshui Project on Wujiang River. The analysis method includes uniform design (UD) ,BP artificial neural network(BP-ANN)and genetic algorithm (GA) .Uniform design and numerical simulation are used to gain training samples of BP-ANN, and BP-ANN is used to simulate the relationship between rock mass displacements and rock mechanical parameters. In addition, the initial input weights of BP-ANN model are optimized by genetic algorithm (GA) because the initial input weights of BP artificial neural network model strongly affect the accuracy of neural network. And the rock mechanical parameters are gained through the trained BP-ANN and measured increment displacement of surrounding rock mass. Finally, the surrounding rock mass displacements induced by the excavation of underground powerhouse are forecasted. According the result, the forecasting displacements are approximate to the measured ones; so as to validate, the rightness and reliability of the above method.

Key words: displacement back analysis , large-scale underground powerhouse , unloading rockmass, increment of displacement , GA-ANN

CLC Number: 

  • TU 457
  • Please send e-mail to pingzhou3@126.com if you would like to read full paper in English for free. Parts of our published papers have English translations.
[1] SUN Ming-she, MA Tao, SHEN Zhi-jun, WU Xu, WANG Meng-shu,. Study of lining sharing surrounding rock pressure in composite lining structure [J]. , 2018, 39(S1): 437-445.
[2] WANG Shao-jie, LU Ai-zhong, ZHANG Xiao-li. Analytical method of displacement back analysis for horseshoe tunnel excavated in transverse isotropic rock mass [J]. , 2018, 39(S1): 495-504.
[3] TIAN Mao-lin, XIAO Hong-tian, YAN Qiang-gang,. Displacement back analysis of rock parameters of Hoek-Brown criterion using nonlinear regression method [J]. , 2017, 38(S1): 343-350.
[4] YUAN Wen-hua. Back analysis of viscoelasto-plastic constitutive parameters of artificial frozen soil [J]. , 2013, 34(11): 3091-3095.
[5] LIU Hui-bo , XIAO Ming , ZHANG Zhing-guo , CHEN Jun-tao . Displacement back analysis of parameter field of blasting excavation damaged zone around openings considering spatial effect [J]. , 2012, 33(7): 2133-2141.
[6] XIAO Ming-zhao,ZHOU Cheng-hao ,CHENG Yun,FENG Xiao-la ,YANG Jun-mei. Application of finite elements and modified simplex method jointed programming technology to displacement back analysis [J]. , 2011, 32(3): 899-904.
[7] SU Guo-shao, ZHANG Ke-shi, Lü Hai-bo. A cooperative optimization method based on particle swarm optimization and Gaussian process for displacement back analysis [J]. , 2011, 32(2): 510-515.
[8] ZHANG Yong-hui, SHENG Qian, LENG Xian-lun, ZHU Ze-qi. Two dimensional displacement back analysis of left bank slope of Longtan hydropower station [J]. , 2010, 31(S2): 396-401.
[9] SUN Jun,QI Yu-liang. Normal calculation-back analysis of surrounding rock stability of subsee tunnel [J]. , 2010, 31(8): 2353-2360.
[10] WEN Jian-hua,WU Dai-hua,CHEN Jun-ming,XIA Yin-fei. Parameter inversion of viscoelastic cavern displacements based on hierarchical pattern search [J]. , 2010, 31(3): 967-970.
[11] ZHANG Chun-hui, ZHAO Quan-sheng. Early warning system of mining subsidence damage based on ARCGIS [J]. , 2009, 30(7): 2197-2202.
[12] LIU Kai-yun,QIAO Chun-sheng,LIU Bao-guo. Research on elastoplastic displacement back analysis method based on GA-GRNN algorithm in three-dimension of Wushi tunnel [J]. , 2009, 30(6): 1805-1809.
[13] WU Kai,SHENG Qian,MEI Song-hua,LI Jia. A model of PSO-LSSVM and its application to displacement back analysis [J]. , 2009, 30(4): 1109-1114.
[14] JIAO Chun-mao, ZHAO Chun-feng, LOU Yun3, Lü Ai-zhong, SHI Zhen-ming. Research on stochastic back analysis using of Cauchy integral method and genetic algorithm [J]. , 2009, 30(1): 251-256.
[15] ZHOU Jia-wen , XU Wei-ya , TONG Fu-guo , CHU Wei-jiang , ZHANG Zong-liang , LIU Xing-ning . Three-dimensional nonlinear finite element simulation of excavation of the diversion tunnel No.1 for Nuozhadu Hydropower Station [J]. , 2008, 29(12): 3393-3400.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] WEI Li,CHAI Shou-xi,CAI Hong-zhou,WANG Xiao-yan,LI Min3,SHI Qian. Research on tensility of wheat straw for reinforced material[J]. , 2010, 31(1): 128 -132 .
[2] HUANG Qing-xiang, ZHANG Pei, DONG Ai-ju. Mathematical model of “arch beam” of thick sandy soil layer movement in shallow seam[J]. , 2009, 30(9): 2722 -2726 .
[3] . Numerical implementation of discontinuities in dual media 3D model for thermo-hydro-mechanical coupling[J]. , 2010, 31(2): 638 -644 .
[4] WANG Yang, TANG Xiong-jun, TAN Xian-kun, WANG Yuan-han. Mechanism analysis of floor heave in Yunling Tunnel[J]. , 2010, 31(8): 2530 -2534 .
[5] LEI Jin-bo,CHEN Cong-xin. Research on load transfer mechanism of composite foundation of rigid pile with cap based on hyperbolic model[J]. , 2010, 31(11): 3385 -3391 .
[6] WANG Deng-ke,LIU Jian,YIN Guang-zhi,WEI Li-de. Research on influencing factors of permeability change for outburst-prone coal[J]. , 2010, 31(11): 3469 -3474 .
[7] DING Guang-ya, CAI Yuan-qiang, XU Chang-jie. Analysis of vibration isolation of a row of rigid piles to plane SV waves in saturated soil[J]. , 2009, 30(3): 849 -854 .
[8] WANG Jun, CAO Ping, LI Jiang-teng, LIU Ye-ke. Analysis of stability of tunnel-slope with rheological medium under rainfall infiltration[J]. , 2009, 30(7): 2158 -2162 .
[9] ZHANG Yuan, WAN Zhi-jun, KANG Jian-rong, ZHAO Yang-sheng. Analysis of stage characteristics of sandstone permeability under conditions of temperature and triaxial stress[J]. , 2011, 32(3): 677 -683 .
[10] HOU Wei2, JIA Yong-gang1,2, SONG Jing-tai3, MENG Xiang-mei4, SHAN Hong-xian1, 2. Factors influencing critical shear stress of silty sediment seabed in Yellow River delta[J]. , 2011, 32(S1): 376 -0381 .