›› 2009, Vol. 30 ›› Issue (S2): 287-290.
• Geotechnical Engineering • Previous Articles Next Articles
HUO Run-ke 1, 2, WANG Yan-bo1, SONG Zhan-ping 1, 2, YU Qin-yuan3
CLC Number:
[1] | WANG Dao-yuan, YUAN Jin-xiu, ZHU Yong-quan, LIU Jia, WANG Hong-fan, . Model test study of deformation characteristics and reasonable reserved deformation of shallow-buried loess tunnel with hard-flow plastic [J]. Rock and Soil Mechanics, 2019, 40(10): 3813-3822. |
[2] | LAI Jin-xing , NIU Fang-yuan , FAN Hao-bo , QIU Jun-ling , WANG Kai-yun,. Field test of mechanical characteristics of three-layer support structure of shallow loess tunnel [J]. , 2015, 36(6): 1769-1775. |
[3] | HE Li-chao ,WANG Meng-shu ,LI Yu-jie,. Supporting technology for shallow large-span neighborhood loess tunnel [J]. , 2013, 34(S2): 306-310. |
[4] | XU Bang-shu ,YANG Wei-min ,WANG Zhe-chao ,WANG Yu-kui. Study of initial support safety evaluation about shape steel reinforced shotcrete in highway tunnel [J]. , 2012, 33(1): 248-254. |
[5] | HU Shi-min, ZHANG Ding-li, LI Peng-fei, CHEN Feng-bin, ZHANG Xuan. Analysis of initial support adaptability of the large-section loess tunnel [J]. , 2011, 32(S2): 660-665. |
[6] | LI Jian ,TAN Zhong-sheng ,YU Yu ,NI Lu-su. Research on construction procedure for shallow large-span tunnel undercrossing highway [J]. , 2011, 32(9): 2803-2809. |
[7] | LU Jun-fu,WANG Ming-nian,JIA Yuan-yuan,YU Yu, TAN Zhong-sheng. Research on construction time of secondary lining of large section loess tunnel for high-speed railway [J]. , 2011, 32(3): 843-848. |
[8] | WANG Ming-nian, GUO Jun, LUO Lu-sen, Yu Yu, Yang Jian-min, Tan Zhon. Study of critical buried depth of large cross-section loess tunnel for high speed railway [J]. , 2010, 31(4): 1157-1162. |
[9] | GUO Jun,WANG Ming-nian,TAN Zhong-sheng,LUO Lu-sen. Anchoring mechanism and effect of systematic rockbolt for shallow buried loess tunnel [J]. , 2010, 31(3): 870-874. |
[10] | HUO Run-ke, HUANG Pei, SONG Zhan-ping, LIU Qing. Research on effect of tunnel construction on internal force and deformation at loosed loess area [J]. , 2009, 30(S2): 273-276. |
[11] | ZHANG Hong , ZHENG Ying-ren , YANG Zhen , WANG Qian-yuan , GE Su-ming. Exploration of design methods of support structure in loess tunnel [J]. , 2009, 30(S2): 473-478. |
[12] | JI Wu-jun. Investigation and analysis of engineering problems for loess tunnels [J]. , 2009, 30(S2): 387-390. |
[13] | NI Yu-shan, ZHANG Hua-bing. Numerical analysis of construction scheme of loess tunnel [J]. , 2006, 27(S1): 22-26. |
[14] | LI Xiao-hong , LI Deng-xin , JIN Xiao-guang , GU Yi-lei,. Discussion on influence of initial support to stability and deformation of surrounding rock mass in soft rock tunnel [J]. , 2005, 26(8): 1207-1210. |