Application of long and short piles high strength composite foundation to high-rise building

LIN Ben-hai1, 2, FANG Hui3   

  1. (1.School of Civil Engineering, Guangzhou University, Guangzhou 510006, China; 2.Research Center of Underground Engineering and Geological Hazard, Guangzhou University, Guangzhou 510006, China; 3.Shanghai Harbour Engineering Design and Research Institute, Shanghai 200032, China)
  • Received:2009-08-10 Online:2009-08-10 Published:2011-06-21

Abstract:

The inter-pile soil can be fully mobilize to participate in the work of load-sharing and vertical rigidity change in the trend be the same with the additional load stress dispersion changes under the action of long and short piles high strength composite foundation. Based on the calculation model of long and short piles composite foundation considering different lengths of piles, different stiffness of piles and soil layer distribution around the pile, long and short piles high strength composite foundation of high-rise building can be calculated and analyzed; through a case study, it is shown that the long and short piles high strength composite foundation can meet the requirements of the bearing capacity and settlemen of high-rise buildings. The high-rise construction pile foundation will face enormous challenges, because of its high bearing capacity, economic superiority, flexible construction and short construction period.

Key words: long and short piles high strength composite foundation, high-rise building;interaction, shear displacement method

CLC Number: 

  • TU 441
[1] WANG Zhong-kai, XU Guang-li. Influence range and quantitative prediction of surface deformation during shield tunnelling and exiting stages [J]. Rock and Soil Mechanics, 2020, 41(1): 285-294.
[2] ZHOU Li-duo, KONG Gang-qiang, PENG Huai-feng, GU Hong-wei, ZHU Xi,. Theoretical analysis of bearing capacities of pile group under oblique load [J]. , 2017, 38(9): 2647-2654.
[3] LIN Zhi-yong , DAI Zi-hang , . Interaction coefficients method for calculating piles group settlements considering reinforcing and restraining effect [J]. , 2014, 35(S1): 221-226.
[4] LONG Zhao,ZHAO Ming-hua,ZHANG En-xiang,LIU Jun-long. A simplified method for calculating critical anchorage length of bolt [J]. , 2010, 31(9): 2991-2994.
[5] LIU Jie, HE Jie, MIN Chang-qing. Contrast research of bearing behavior for composite foundation with tapered piles and cylindrical piles [J]. , 2010, 31(7): 2202-2206.
[6] GAO Meng, GAO Guang-yun, YANG Cheng-bin, FENG Shi-jin, JI Yu-jun. Analytical solution for settlement of group piles in layered ground based on shear displacement method [J]. , 2010, 31(4): 1072-1077.
[7] CHEN Chang-fu, ZHOU Zhi-jun. Analysis of pile-soil stress ratio for double reinforced composite ground [J]. , 2009, 30(9): 2660-2666.
[8] MEI Guo-xiong , ZAI Jin-min , SONG Lin-hui , XU Mei-juan,. Semi-analytical method and application in geotechnical engineering [J]. , 2007, 28(S1): 333-337.
[9] QIU Liang, ZHU Ning. Settlement analysis of composite foundation with rigid piles under flexible ground [J]. , 2007, 28(9): 1964-1968.
[10] ZHU Kui, XU Ri-qin . Study on pile group settlement in layered foundation [J]. , 2006, 27(S2): 870-874.
[11] WANG Wei, YANG Min. An improved elastic analysis method of pile foundation under vertical loading [J]. , 2006, 27(8): 1403-1406.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] HUANG Ping-lu, CHEN Cong-xin, XIAO Guo-feng, LIN Jian. Study of rock movement caused by underground mining in mines with complicated geological conditions[J]. , 2009, 30(10): 3020 -3024 .
[2] LU Meng-meng,XIE Kang-he,WANG Yu-lin,CAI Xin. Analytical solution for nonlinear consolidation of stone column reinforced composite ground[J]. , 2010, 31(6): 1833 -1840 .
[3] SUN Jun,QI Yu-liang. Normal calculation-back analysis of surrounding rock stability of subsee tunnel[J]. , 2010, 31(8): 2353 -2360 .
[4] HOU Xing-min,KONG Ling-zhao,CHEN Jian-li. A subsoil damping ratio testing and data processing method[J]. , 2010, 31(9): 2995 -2999 .
[5] XU Ming-jiang,WEI De-min,HE Chun-bao. Axisymmetric steady state dynamic response of layered unsaturated soils[J]. , 2011, 32(4): 1113 -1118 .
[6] WEN Hai-jia, ZHANG Yong-xing, CHEN Yun. Slope risk assessment based on a 3D geo-information model[J]. , 2009, 30(S2): 367 -370 .
[7] PENG Lin-jun , ZHAO Xiao-dong , LI Shu-cai. Simulating research on rules of surface subsidence due to deep mining[J]. , 2011, 32(6): 1910 -1914 .
[8] YANG Zhi-quan1, 2, 3,HOU Ke-peng4,GUO Ting-ting4,MA Qiu5. Study of column-hemispherical penetration grouting mechanism based on Bingham fluid of time-dependent behavior of viscosity[J]. , 2011, 32(9): 2697 -2703 .
[9] LIU Yan-min,YU Hong-ming,WANG Can,WANG Chun-lei. Research on mechanism of damage of anhydrock in dolomite layer to tunnel structure[J]. , 2011, 32(9): 2704 -2709 .
[10] LENG Xian-lun ,SHENG Qian ,HE En-guang ,ZHU Ze-qi ,ZHAO Yu. Study of surrounding rock damage induced by tunnel boring machine driving tunnel at West Route of South to North Water Transfer Project[J]. , 2011, 32(11): 3420 -3431 .