›› 2009, Vol. 30 ›› Issue (S2): 422-426.

• Geotechnical Engineering • Previous Articles     Next Articles

Research on rock burst estimation and control measures for auxiliary tunnels in Jinping Ⅱ hydropower station

ZHANG Qi-feng1, ZHOU Chun-hong1, ZHOU Hui 2, ZHANG Kai2   

  1. 1.East China Investigation and Design Institute, CHECC, Hangzhou 310014, China; 2.State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China
  • Received:2009-07-20 Online:2009-08-10 Published:2011-06-21

Abstract: Auxiliary tunnels of Jinping Ⅱ hydropower station are deeply buried. Rock burst under high geo-stress is one of the main problems to be taken into account. With the statistical data of the rock burst in the auxiliary tunnels and the in-situ stress and the mechanical properties of the rock, risk of rock burst in the auxiliary tunnels is analyzed by using different indexes. In addition, the prevention and cure methods of rock burst in the auxiliary tunnels are discussed. The results can provide basic support for rock burst estimation and prevention in the process of construction of four diversion tunnels in Jinping Ⅱ hydropower station.

Key words: Jinping Ⅱ hydropower station, auxiliary tunnels, rock burst analysis, control measures

CLC Number: 

  • O 341
[1] LIU Tian-xiang, WANG Zhong-fu, . Analysis of interaction when tunnel orthogonal crossing deep-seated landslide and the corresponding control measures [J]. , 2018, 39(1): 265-274.
[2] LIU Zhi-chun , WANG Meng-shu,. Research on impact of tunnel engineering factors on groundwater environment [J]. , 2015, 36(S2): 281-288.
[3] MING Hua-jun,FENG Xia-ting,CHEN Bing-rui,ZHANG Chuan-qing. Analysis of rockburst mechanism for deep tunnel based on moment tensor [J]. , 2013, 34(1): 163-172.
[4] LIU Quan-sheng ,XIAO Hu ,LU Xing-li ,CUI Wen-tai . Research on floor heave characteristics of broken soft rocks with high geostress and its comprehensive control measures [J]. , 2012, 33(6): 1703-1710.
[5] YAO Yong, HE Chuan. Analysis of blasting vibration response of parallel set small clear-distance tunnels and blasting control measures [J]. , 2009, 30(9): 2815-2822.
[6] WU Yan-qing , ZHANG Jian-shan , LI Zhe,. Mechanism analysis of land subsidence due to groundwater withdrawal and control measures [J]. , 2005, 26(10): 1582-1586.
[7] LIU You-rong, JIA Hong-biao, TANG Hui-ming, ZHOU Li-zhen . Study on stability of slope at Badong Yangtse Highway Bridge site [J]. , 2004, 25(11): 1828-1831.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] CHEN Feng, YANG Hai-jun, YANG Chun-he. Analysis of residual brine of salt rock gas storage during injecting gas to eject brine[J]. , 2009, 30(12): 3602 -3606 .
[2] DONG Cheng, ZHENG Ying-ren, CHEN Xin-ying, TANG Xiao-song. Research on composite support pattern of soil nails and prestressed anchors in deep foundation pits[J]. , 2009, 30(12): 3793 -3796 .
[3] REN Song, JIANG De-yi, YANG Chun-he, TENG Hong-wei. Creep tests on shale of cracking position in Gonghe tunnel and simulating it by DEM[J]. , 2010, 31(2): 416 -421 .
[4] LIANG Gui-lan, XU Wei-ya, TAN Xiao-long. Application of extension theory based on entropy weight to rock quality evaluation[J]. , 2010, 31(2): 535 -540 .
[5] MA Wen-tao. Forecasting slope displacements based on grey least square support vector machines[J]. , 2010, 31(5): 1670 -1674 .
[6] YU Lin-lin,XU Xue-yan,QIU Ming-guo, LI Peng-fei,YAN Zi-li. Influnce of freeze-thaw on shear strength properties of saturated silty clay[J]. , 2010, 31(8): 2448 -2452 .
[7] WANG Xie-qun,ZHANG You-xiang,ZOU Wei-lie,XIONG Hai-fan. Numerical simulation for unsaturated road-embankment deformation and slope stability under rainfall infiltration[J]. , 2010, 31(11): 3640 -3644 .
[8] LUO Qiang, ZHAO Lian-heng, LI Liang, TAN Han-hua. Quasi-static stability analysis of homogeneous soil slopes under effect of surcharge and earthquake[J]. , 2010, 31(12): 3835 -3841 .
[9] CHEN Xiang-hao,DENG Jian-hui,CHEN Ke-wen,ZHENG Jun,MENG Fan-li,XU Liang. Stress monitoring and analysis of gravelly soil corewall in high rockfill dam during construction[J]. , 2011, 32(4): 1083 -1088 .
[10] JIANG Hong. PPP-BOTDA distributed fiber optic sensing techniques and its application to pile tests[J]. , 2011, 32(10): 3190 -3195 .