Construction security risk management for shallow-buried large-span tunnel passing intensive buildings underneath

WANG Hao, QIN Wei-min, JIAO Yu-yong   

  1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China
  • Received:2010-04-23 Online:2010-08-10 Published:2010-09-09

Abstract:

The Xiamen Wuchun highway tunnel of which the span is 34.5 m and only 9 m buried depth, passing underneath an area over 95 sets of buildings within it, the geological condition and environment of the tunnel is very complicated; and the degree of difficulty being under construction is immense also. In order to solve the main security risks during tunnel construction, such as uneven settlement, deformation and destruction of building, we conducted comprehensive research approaches and adopted a set of comparatively perfect safety management system. Firstly, we simulated excavation and reinforce of tunnel construction by using numerical method, and get the deformation values on key construction step. Combining with experiences from other similar projects and national standard, we drew out the control standard values for security monitoring to guide the tunnel excavation and the building protection. Secondly, we carried out thoroughly monitoring to grasp the dynamical response of building, pipeline, ground surface, stratum, surrounding rock and lining of tunnel during construction to ensure security, and implement 24 h automatic monitoring to the key buildings. Thirdly, having built advanced network transmission system of security management, which include monitoring information management, forecasting system and the information announces system with LED display screen; the whole monitoring data and construction proceedings can be stored and processed in data base server, while can be browsed and inquired by the networked computer. Finally, based on the work of third-party monitoring, we built a kind of monitoring management system of III levels warning, which can announce the warning information and construction proceeding to all participant via intranet or LED screen in time.

Key words: shallow-buried large-span tunnel, security risk, intensive buildings, information management system, automatic monitoring

CLC Number: 

  • TU 451
[1] XIE Xiong-yao, LI Jun, WANG Qiang,. Automatic monitoring and mobile data publishing system of ground settlement induced by shield tunneling [J]. , 2016, 37(S2): 788-794.
[2] WU Kai,SHENG Qian,ZHANG Yong-hui,LI Zhi-yong ,LI Hong-xu ,YUE Zhi-ping. Development of real-time remote monitoring and forecasting system for geological disasters at subgrade slopes of mountainous highways and its application [J]. , 2010, 31(11): 3683-3687.
[3] ZHANG Cheng-ping,ZHANG Ding-li,LUO Jian-jun,WANG Meng-shu,WU Jie-pu. Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel [J]. , 2009, 30(6): 1861-1866.
[4] HE YUE-guang, DU Nian-chun, LI Zhi-wei. A study of monitoring information management system of metro construction based on Web GIS [J]. , 2009, 30(1): 265-269.
[5] WANG Hao , LI Li , QIN Wei-min , TANG Hua,. Application of ADO to developing monitoring information management system [J]. , 2006, 27(S1): 426-429.
[6] LAI Bi-tao , LI Zhang-ming . Development and application of soil improvement information management system [J]. , 2004, 25(12): 2041-2044.
[7] CAO Guo-jin, JIANG Hong-dao . Application of information technique to construction of underground engineering [J]. , 2002, 23(6): 795-799.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] CHU Xi-hua, XU Yuan-jie. Studies on transformation from M-C criterion to Drucker-Prager criterions based on distortion energy density[J]. , 2009, 30(10): 2985 -2990 .
[2] LIU Dou-dou, CHEN Wei-zhong, YANG Jian-ping, TAN Xian-jun, ZHOU X. Experimental research on strength characteristic of brittle rock unloading confining pressure[J]. , 2009, 30(9): 2588 -2594 .
[3] WANG Gui-yao,LI Bin,LUO Jun,FU Hong-yuan. Study of soil-water charactiristics and matric suction measurement device for unsaturated silty soil[J]. , 2010, 31(11): 3678 -3682 .
[4] LU Ying-fa, CHENG Zhu-lei, XIE Wen-liang, Lü Zhi-zhong. Application of geotechnics to sanitation landfill of refuse[J]. , 2009, 30(1): 91 -98 .
[5] JIA Qiang, YING Hui-qing, ZHANG Xin. Construction of basement in existing buildings by static bolt-pile[J]. , 2009, 30(7): 2053 -2057 .
[6] LU Jun-fu,WANG Ming-nian,JIA Yuan-yuan,YU Yu, TAN Zhong-sheng. Research on construction time of secondary lining of large section loess tunnel for high-speed railway[J]. , 2011, 32(3): 843 -848 .
[7] DANG Fa-ning , LIANG Xin-yu , TIAN Wei , CHEN Hou-qun. Numerical analysis of size effect on meso-concrete random aggregate model[J]. , 2009, 30(S2): 518 -523 .
[8] WANG Cheng-hua, AN Jian-guo. Numerical analyses of vertical bearing capacity of foundations with enlarged pile group[J]. , 2011, 32(S2): 580 -585 .
[9] FANG Tao , LIU Xin-rong , GENG Da-xin , LUO Zhao , JI Xiao-tuan , ZHENG Ming-xin . Model testing study of vertical bearing behaviors for large diameter pile with variable cross-section (I)[J]. , 2012, 33(10): 2947 -2952 .
[10] HU Wan-yu ,CHEN Xiang-hao ,LIN Jiang ,KUANG Lei-qiang . In-situ drilling tests of seepage in gravel soil core wall during the first impoundment in Pubugou hydropower station[J]. , 2013, 34(5): 1259 -1263 .