›› 2011, Vol. 32 ›› Issue (9): 2759-2764.

• Geotechnical Engineering • Previous Articles     Next Articles

Layered interval excavation method for large span and high sidewall underground cavern

LIU Bao-guo1,XU Gan-cheng2   

  1. 1. School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China; 2. The Air Force Engineering Design and Research Institute, Beijing 100068, China
  • Received:2011-03-30 Online:2011-09-10 Published:2011-09-13

Abstract: The layered interval excavation method for a large span and high sidewall underground cavern is described in detail. Through numerical simulation, its feasibility is proved. A large span and high sidewall cavern construction practice is as follows; detailed large cavern reserved rock clapboard, upper, middle and bottom chamber between rock clapboard parallel excavation, and finally clear the rock clapboard full of this new method of construction of the excavation process. Through numerical simulation, the largest deformation caused by excavation, distribution of plastic zone and tension of rock bolting of two excavation methods are compared. The results show that the new method of rock excavation damage to surrounding rock is small. Finally, the applicable conditions for this new method are pointed. This method has universal significance for similar conditions of underground large cavern construction.

Key words: large section cavern, excavation methods, parallel operation, surrounding rock mass deformation

CLC Number: 

  • TU 45
[1] LUO Yi , LI Xin-ping , XU Peng-cheng , DONG Qian , HONG Ji-song , . Characteristic study of surrounding rock mass deformation considering accumulative damage effect [J]. , 2014, 35(11): 3041-2048.
[2] TANG Ming-ming,WANG Zhi-yin,LI Yun-peng. Study of construction methods for crossing bias small interval highway tunnel [J]. , 2011, 32(4): 1163-1168.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] ZHANG Wen-jie,CHEN Yum-min. Pumping tests and leachate drawdown design in a municipal solid waste landfill[J]. , 2010, 31(1): 211 -215 .
[2] GONG Wei-li, AN Li-qian, ZHAO Hai-yan, MAO Ling-tao. Multiple scale characterization of CT image for coal rock fractures based on image description[J]. , 2010, 31(2): 371 -376 .
[3] WAN Zhi, DONG Hui, LIU Bao-chen. On choice of hyper-parameters of support vector machines for time series regression and prediction with orthogonal design[J]. , 2010, 31(2): 503 -508 .
[4] GAO Guang-yun, ZHAO Yuan-yi, GAO Meng, YANG Cheng-bin. Improved calculation for lateral dynamic impedance of pile groups in layered soil[J]. , 2010, 31(2): 509 -515 .
[5] TAN Feng-yi, Jiang Zhi-quan, Li Zhong-qiu, YAN Hui-he. Application of additive mass method to testing compacted density of filling material in Kunming new airport[J]. , 2010, 31(7): 2214 -2218 .
[6] CHAI Bo, YIN Kun-long, XIAO Yong-jun. Characteristics of weak-soft zones of Three Gorges Reservoir shoreline slope in new Badong county[J]. , 2010, 31(8): 2501 -2506 .
[7] WANG Xue-wu,XU Shang-jie,DANG Fa-ning,CHENG Su-zhen. Analysis of stability of dam slope during rapid drawdown of reservoir water level[J]. , 2010, 31(9): 2760 -2764 .
[8] WANG Wei-ming, SUN Rui, CAO Zhen-zhong, YUAN Xiao-ming. Comparative study of features of liquefied sites at home and abroad[J]. , 2010, 31(12): 3913 -3918 .
[9] WANG Guang-jin,YANG Chun-he ,ZHANG Chao,MA Hong-ling,KONG Xiang-yun ,HO. Research on particle size grading and slope stability analysis of super-high dumping site[J]. , 2011, 32(3): 905 -913 .
[10] HU Hai-jun, JIANG Ming-jing, ZHAO Tao, PENG Jian-bing, LI Hong. Effects of specimen-preparing methods on tensile strength of remolded loess[J]. , 2009, 30(S2): 196 -199 .