›› 2011, Vol. 32 ›› Issue (S1): 1-5.

• Fundamental Theroy and Experimental Research •     Next Articles

Simplified calculation methods of post-construction settlement of high-fill foundation in mountain airport

CAO Guang-xu1, 2, SONG Er-xiang1, 2, XU Ming1, 2   

  1. (1. Department of Civil Engineering, Tsinghua University, Beijing 100084, China; 2. Key Laboratory of Civil Engineering Safety and Durability of Ministry of Education, Tsinghua University, Beijing 100084, China
  • Received:2011-01-04 Online:2011-05-15 Published:2011-05-16

Abstract: The rapid development of airport construction in western mountain area of China leads to increasing number of high-fill foundations, of which the main features are the large fill volume, high height and the existence of soft quondam foundation under fill. These features also increase the difficulty of post-construction settlement prediction. According to composition characters of high-fill foundations of mountain airport, the post-construction settlement can be divided into the creep deformation from upper coarse-grained filler and the consolidation deformation from lower soft quondam foundation. Firstly, a simplified calculation method to calculate consolidation deformation of soft quondam foundation is proposed on the base of analyzing and comparing existing calculation methods, which can consider construction process, and the calculation result by this method agrees relatively well with the field measurement data. Secondly, by analyzing laboratory test data, it is considered that hyperbolic model is also able to characterize the creep deformation of coarse-grained materials; base on this, another simplified calculation method to calculate creep deformation of upper coarse-grained filler is proposed.

Key words: high-fill foundation, post-construction settlement, simplified calculation method, creep deformation, consolidation deformation

CLC Number: 

  • TU 411
[1] WANG Qin-ke, MA Jian-lin, CHEN Wen-long, YANG Yan-xin, HU Zhong-bo, . Centrifugal model tests and calculation method of uplift bearing capacity of rock-socketed pedestal pile overburden soil [J]. Rock and Soil Mechanics, 2019, 40(9): 3405-3415.
[2] LI Rui-shan, YUAN Xiao-ming. Simplified calculation method for the fundamental period of layered soil sites [J]. Rock and Soil Mechanics, 2019, 40(8): 3227-3235.
[3] DING Yan-hui, ZHANG Bing-yin, QIAN Xiao-xiang, YIN Yin, SUN Xun, . Experimental study of the characteristics of wetting deformation of rockfill materials [J]. Rock and Soil Mechanics, 2019, 40(8): 2975-2981.
[4] ZHANG Qiang-yong, ZHANG Long-yun, XIANG Wen, JIANG Li-yu, DING Yan-zhi1,. Triaxial creep test of gneissic granite considering thermal effect [J]. , 2017, 38(9): 2507-2514.
[5] ZHANG Yong-jie, XIA Yi-qi, FENG Xia-ting, WANG Gui-yao,. A simplified method and affecting factors for double pile-column foundation in abrupt slope [J]. , 2017, 38(6): 1705-1715.
[6] CAO Wen-gui, YIN Peng, HE Min, LIU Tao. A combination method for predicting settlement based on new or old degree of data and adjustment of value interval of prediction [J]. , 2017, 38(2): 534-540.
[7] JIN Xiao-fei , LIANG Shu-ting , ZHU Xiao-jun , ZHANG Yu-liang,. Simplified method for calculating maximum deformation of diaphragm walls caused by braced excavation in soft clays [J]. , 2015, 36(S2): 583-587.
[8] LIU Yuan-feng , ZHENG Gang,. Numerical analysis of settlement and pore pressure of drainage controlling ground treatment method [J]. , 2015, 36(S1): 592-596.
[9] GE Miao-miao , LI Ning , ZHENG Jian-guo , ZHANG Ji-wen, ZHU Cai-hui,. A creep model for compacted loess based on 1D oedometer test [J]. , 2015, 36(11): 3164-3170.
[10] ZHU Cai-hui, LI Ning. Post-construction settlement analysis of loess-high filling based on time-dependent deformation experiments [J]. , 2015, 36(10): 3023-3031.
[11] WANG Yuan-zhan ,HE Lin-lin ,WANG Zhao-yang,. Research on dynamic simplified calculation method of all-vertical-piled wharf in offshore deep-water [J]. , 2014, 35(10): 2969-2976.
[12] HUANG Long,WANG Bing-long,ZHOU Shun-hua. Centrifugal model test of pile-plank subgrade in soft ground [J]. , 2013, 34(S1): 192-196.
[13] ZHANG Lian-li, WANG Yuan-zhan, SHANG Dan. Simplified calculation methods for lateral earth resistance on piles and stability of the inverse T type breakwater with jackets and pile foundations [J]. , 2013, 34(4): 1131-1139.
[14] JI Wen-dong, YANG Chun-he, YAO Yuan-feng, SHI Xi-lin. Behaviors of existing salt cavern group used for underground energy storage [J]. , 2012, 33(9): 2837-2844.
[15] LI Zhen-yu ,XIAO Hong-bin ,JIN Wen-ting ,YI Wen . Study of nonlinear rheological model of Nanning expansive soils [J]. , 2012, 33(8): 2297-2302.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] GUAN Yun-fei,GAO Feng,ZHAO Wei-bing,YU Jin. Secondary development of modified Cambridge model in ANSYS software[J]. , 2010, 31(3): 976 -980 .
[2] MI Hai-zhen, GAO Chun. Experimental study of expansive behaviors of quicklime[J]. , 2010, 31(4): 1253 -1256 .
[3] SONG Fei,LIU Chao,ZHANG Jian-min,ZHENG Rui-hua. Development of centrifuge model test facility of retaining wall[J]. , 2010, 31(9): 3005 -3011 .
[4] CHEN Jing-yu , GONG Xiao-nan, DENG Ya-hong. Research on dissipation of excess pore water pressure in one-dimensional finite strain consolidation of soft clays[J]. , 2009, 30(1): 191 -195 .
[5] ZHANG Chun-hui, ZHAO Quan-sheng. Early warning system of mining subsidence damage based on ARCGIS[J]. , 2009, 30(7): 2197 -2202 .
[6] SUN Jian , WANG Lian-guo , TANG Fu-rong , SHEN Yi-feng , GONG Shi-long. Microseismic monitoring failure characteristics of inclined coal seam floor[J]. , 2011, 32(5): 1589 -1595 .
[7] YANG Yong-xiang , ZHOU Jian , JIA Min-cai , HU Jin-hu. Visualization testing on liquefaction properties of saturated sands[J]. , 2011, 32(6): 1643 -1648 .
[8] XU Zheng-ming, XUE Qiang, ZHAO Ying. Research on time effect of modified sludge composites by triaxial tests on mechanical properties[J]. , 2011, 32(6): 1713 -1718 .
[9] CHEN Ming , HU Ying-guo , LU Wen-bo , YAN Peng , ZHOU Chuang-bing. Blasting excavation induced damage characteristics of diversion tunnel for Jinping cascade II hydropower station[J]. , 2011, 32(S2): 172 -177 .
[10] QIAO Chun-jiang , CHEN Wei-zhong , WANG Hui , TIAN Hong-ming , TAN Xian-jun. Study of construction method of tunnel in shallow broken rock mass[J]. , 2011, 32(S2): 455 -462 .