›› 2013, Vol. 34 ›› Issue (S1): 516-522.
• Numerical Analysis • Previous Articles Next Articles
ZHOU Nan1,2,WANG De-sheng1,WANG Hua1,CHANG Jian-ping1
Received:
Online:
Published:
Abstract: Feasibility research of high bench blasting belongs to multiple factors and complex system project. In view of the feasibility research status of high bench blasting, a method of feasibility of high bench blasting considering blasting mechanism is put forward. Through comparing with difficult burst positions ( bench top and bottom ) stress field variation trend of the existing ordinary bench and high bench blasting process, it is found that the use of high bench blasting can obtain the existing bench blasting equivalent or better blasting results. From the blasting mechanism analysis, it is shown that the high bench blasting technology in the Barun ore is feasible. The numerical analysis results show that the best detonation mode of high bench blasting is all grain simultaneous blasting; the better ones are intermediate and ends of the detonation initiation; the unsuitable way is the hole bottom detonation.
Key words: blasting in high bench;feasibility, numerical analysis;stress field;initiation way
CLC Number:
ZHOU Nan ,WANG De-sheng ,WANG Hua ,CHANG Jian-ping . Numerical analysis of high bench blasting in open pit mine[J]., 2013, 34(S1): 516-522.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://ytlx.whrsm.ac.cn/EN/
http://ytlx.whrsm.ac.cn/EN/Y2013/V34/IS1/516
Cited