›› 2013, Vol. 34 ›› Issue (S2): 351-355.

• Geotechnical Engineering • Previous Articles     Next Articles

Settlement law of high liquid limit soil embankment

WU Li-jian1, 2, ZHENG Jia-jia2, DENG Jie2   

  1. 1. Key Laboratory of Road and Traffic Engineering of Ministry of Education, Tongji University, Shanghai 201804, China; 2. Research Institute of Highway, Ministry of Transport, Beijing 100088, China
  • Received:2013-09-12 Online:2013-11-11 Published:2013-11-19

Abstract: High liquid limit soil has some characteristics such as high natural moisture content, high plasticity, high void ratio, and low compactness. Finding the settlement deformation law of high liquid limit soil embankment becomes the key to use it scientifically and reasonably. Based on the mechanical properties of high liquid limit soil, a 26.5 m high embankment was constructed using high liquid limit soil and a long-term settlement observation was carried out. Observation results show that the road settlement value is very high during the subgrade construction; the settlement is smaller in the natural sedimentation time; and the settlement is very small after the pavement construction, about 0.2% of the height. The settlement value is proportional to the subgrade height. Adopting simplified unsaturated soil consolidation theory, the settlement and deformation of high liquid limit soil have been calculated; the calculation results is basically identical with the measured settlement of high liquid limit soil embankment, consolidation theory of unsaturated soil provides a new technical mean for high liquid limit soil embankment settlement calculation. The results prove the post-construction settlement of high liquid limit soil will not be larger; so as to provide a technical basis for its popularization and application in highway engineering.

Key words: high liquid limit soil embankment, settlement deformation law, unsaturated soil theory

CLC Number: 

  • TU 433
[1] CHEN Shan-xiong,FENG Mei-guo,XU Xi-chang,CHEN Shou-yi. Study of instability process and failure mechanism of ash storage dam in a power plant [J]. , 2009, 30(11): 3365-3371.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] SUN Shu-lin,LI Fang,CHEN Jun. Electrical resistivity measurement for lime-stabilized silt soil[J]. , 2010, 31(1): 51 -55 .
[2] LI Ying-yong,ZHANG Ding-li,ZHANG Hong-bo,SONG Xiu-guang. Research on failure mechanism and effects of prestressed anchor cables for reinforcing slopes[J]. , 2010, 31(1): 144 -150 .
[3] LI Jing,MIAO Lin-chang,ZHONG Jian-chi,FENG Zhao-xiang. Deformation and damping characteristics of EPS beads-mixed lightweight soil under repeated load-unloading[J]. , 2010, 31(6): 1769 -1775 .
[4] LIANG Jian-wei, FANG Ying-guang, GU Ren-guo. Analysis of microelectric field effect of seepage in tiny-particle clay[J]. , 2010, 31(10): 3043 -3050 .
[5] WANG Li-yan,JIANG Peng-ming,LIU Han-long. Mechanism analysis of residual liquefied deformation of breakwater during earthquake[J]. , 2010, 31(11): 3556 -3562 .
[6] LI Xiu-zhen,WANG Cheng-hua,DENG Hong-yan. A comparison of distance and Fisher discrimination methods applied to identifying potential landslides[J]. , 2011, 32(1): 186 -192 .
[7] KONG Xiang-xing, XIA Cai-chu, QIU Yu-liang, ZHANG Li-ying, GONG Jian-wu. Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region[J]. , 2011, 32(2): 516 -524 .
[8] JIANG Xue-liang ,YANG Hui ,CAO Ping. FLAC3D analysis of interaction between goaf and opencut mining slope with 3D geological model using SURPAC[J]. , 2011, 32(4): 1234 -1240 .
[9] CHEN Li-hua , LIN Zhi , LI Xing-ping. Study of efficacy of systematic anchor bolts in highway tunnels[J]. , 2011, 32(6): 1843 -1848 .
[10] ZHENG Gang ZHANG Li-ming DIAO Yu. Analysis of working performance of piles beneath excavation bottom and settlement calculation[J]. , 2011, 32(10): 3089 -3096 .