›› 2016, Vol. 37 ›› Issue (S2): 53-59.doi: 10.16285/j.rsm.2016.S2.006

• 基础理论与实验研究 • 上一篇    下一篇

动态施工条件下竖向立柱的承载力和稳定性研究

杨学林,王 震   

  1. 浙江省建筑设计研究院,浙江 杭州 310006
  • 收稿日期:2016-06-06 出版日期:2016-11-11 发布日期:2018-06-09
  • 通讯作者: 王震,男,1985年生,博士,高级工程师,主要从事结构及岩土设计方面的研究。E-mail: wzjggc@163.com E-mail: yangxuelin@ziad.cn
  • 作者简介:杨学林,男,1966年生,博士,教授级高级工程师,主要从事岩土及结构设计方面的研究。

Bearing capacity and stability of vertical column under dynamic construction

YANG Xue-lin, WANG Zhen   

  1. Zhejiang Provincial Institute of Architectural Design and Research, Hangzhou, Zhejiang 310006, China
  • Received:2016-06-06 Online:2016-11-11 Published:2018-06-09

摘要: 竖向立柱是基坑逆作法设计的关键环节之一,而动态施工下侧向约束则是决定立柱稳定承载力的主要因素。针对逆作施工中立柱的轴压稳定问题,采用有限元方法获得立柱轴压屈曲荷载,进而通过杆件欧拉公式反推获得立柱计算长度系数。采用线性特征值屈曲分析研究地基土分步开挖、侧向约束动态变化下竖向立柱的承载力和稳定性,提出了竖向立柱稳定承载力分析时计算长度系数的拟合公式。非线性屈曲分析考虑了几何大位移的影响,通过施加初始几何缺陷获得立柱屈曲后的平衡路径。结果表明,含初始缺陷的立柱实际承载力一般要比特征值屈曲荷载小,且初始缺陷幅值越大,立柱的稳定承载力越小。

关键词: 竖向立柱, 侧向约束, 动态施工, 初始缺陷, 稳定承载力, 计算长度

Abstract: The vertical column is a key step of the design of foundation pit using top-down method; and the lateral restraint under dynamic construction is the main factor to determine the stability of the vertical column. For the axial compression stability of the vertical column under top-down construction, the finite element method is used to obtain the buckling load; and then through Euler formula of rods, the calculation length coefficient of the vertical column is obtained by inverse derivation. The linear eigenvalue buckling analysis is applied to study the capacity and stability of the vertical column under the dynamic variation of the excavation by steps of foundation soil and the lateral restraint. Then the fitting formula of the calculation length coefficient is put forward in the analysis of the stability bearing capacity for the vertical column. Nonlinear buckling analysis takes into account the influence of the geometric large displacement; and then the equilibrium path of post buckling is obtained by applying the initial geometric imperfection. It is shown that the actual bearing capacity of the vertical column with initial imperfection is smaller than that of the eigenvalue buckling load; and the lager the initial imperfection amplitude, the smaller the stable bearing capacity of the vertical column.

Key words: vertical column, lateral restraint, dynamic construction, initial imperfection, stable bearing capacity, calculated length

中图分类号: 

  • TU 941
[1] 牛亚强 ,王 旭 ,郑 静 ,蒋代军 ,刘德仁 ,蒋鹏程 , . 侧向约束防渗路基新结构防渗效果试验研究[J]. , 2015, 36(S2): 252-258.
[2] 周德泉 ,颜 超 ,罗卫华,. 复合桩基重复加卸载过程中侧向约束桩变位规律试验研究[J]. , 2015, 36(10): 2780-2786.
[3] 孙玮泽 ,董 军 ,崔玉萍 ,董 飞 . 含初始缺陷地铁隧道的抗震动力学行为研究[J]. , 2012, 33(S2): 283-288.
[4] 杜修力,侯世伟,路德春,程星磊. 基于数字图像测量技术的砂土剪切带分析[J]. , 2012, 33(5): 1281-1285.
[5] 贾 强,郑爱萍,张 鑫. 高承台钢管桩受压稳定性的试验研究和数值分析[J]. , 2011, 32(6): 1736-1740.
[6] 杨治林. 顺层边坡岩体结构的非完善屈曲性态研究[J]. , 2008, 29(S1): 353-356.
[7] 刘庭金 ,魏立新 ,房营光 ,莫海鸿 . 隧道建设对紧邻高架桥影响的三维数值分析[J]. , 2008, 29(5): 1387-1390.
[8] 孔德志. 加劲水泥土地下连续墙中水泥土强度分析[J]. , 2007, 28(8): 1600-1604.
[9] 吴景海,. 土工合成材料与土工合成材料加筋砂土的相关特性[J]. , 2005, 26(4): 538-541.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!