浅埋大跨隧道下穿建筑物群的施工期安全风险管理

王 浩,覃卫民,焦玉勇   

  1. 中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉 430071
  • 收稿日期:2010-04-23 出版日期:2010-08-10 发布日期:2010-09-09
  • 作者简介:王浩,男,1972年生,博士,副研究员,主要从事岩土工程监测反馈分析、风险评估和相关软件开发方面的工作。

Construction security risk management for shallow-buried large-span tunnel passing intensive buildings underneath

WANG Hao, QIN Wei-min, JIAO Yu-yong   

  1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China
  • Received:2010-04-23 Online:2010-08-10 Published:2010-09-09

摘要:

梧村隧道大跨度浅埋暗挖段下穿密集建筑物群,地质条件和环境十分复杂,施工难度极大。针对建筑物不均匀沉降和变形破坏的风险,制定了较为完善的安全管理措施。采用数值模拟方法,对施工开挖、支护进行精细化模拟,得出关键施工步序的变形量;结合类似工程经验和规范,制定安全监测的控制标准,以指导监测和施工。开展全面的监测,掌握隧道施工过程中建筑物、管线、地面以及地层、隧道围岩和支护结构的动态变化,并对关键的建筑物实施24 h自动化监测。建立了先进的安全管理网络传输系统,包括监测信息管理、预测预报系统和LED显示屏信息发布系统,将所有监测信息和施工动态存储入数据库服务器中,供联网的计算机检索查询。以第三方监测单位为主,建立报警及监测工作III级管理措施,并及时将报警信息及工程近况以文字和图形方式发布在LED显示屏上,供参建各方知晓。

关键词: 浅埋大跨隧道, 安全风险, 密集建筑物群, 信息管理系统, 自动化监测

Abstract:

The Xiamen Wuchun highway tunnel of which the span is 34.5 m and only 9 m buried depth, passing underneath an area over 95 sets of buildings within it, the geological condition and environment of the tunnel is very complicated; and the degree of difficulty being under construction is immense also. In order to solve the main security risks during tunnel construction, such as uneven settlement, deformation and destruction of building, we conducted comprehensive research approaches and adopted a set of comparatively perfect safety management system. Firstly, we simulated excavation and reinforce of tunnel construction by using numerical method, and get the deformation values on key construction step. Combining with experiences from other similar projects and national standard, we drew out the control standard values for security monitoring to guide the tunnel excavation and the building protection. Secondly, we carried out thoroughly monitoring to grasp the dynamical response of building, pipeline, ground surface, stratum, surrounding rock and lining of tunnel during construction to ensure security, and implement 24 h automatic monitoring to the key buildings. Thirdly, having built advanced network transmission system of security management, which include monitoring information management, forecasting system and the information announces system with LED display screen; the whole monitoring data and construction proceedings can be stored and processed in data base server, while can be browsed and inquired by the networked computer. Finally, based on the work of third-party monitoring, we built a kind of monitoring management system of III levels warning, which can announce the warning information and construction proceeding to all participant via intranet or LED screen in time.

Key words: shallow-buried large-span tunnel, security risk, intensive buildings, information management system, automatic monitoring

中图分类号: 

  • TU 451
[1] 郑 帅, 姜谙男, 张峰瑞, 张勇, 申发义, 姜旭东、. 基于机器学习与可靠度算法的围岩动态分级方法 及其工程应用[J]. 岩土力学, 2019, 40(S1): 308-318.
[2] 谢雄耀,李 军,王 强, . 盾构施工地表沉降自动化监测及数据移动发布系统[J]. , 2016, 37(S2): 788-794.
[3] 李化云,张志强,王志杰,凌云鹏,张 浩. 浅埋大跨隧道预加固措施相似模型试验研究[J]. , 2012, 33(S2): 133-138.
[4] 贺跃光,杜年春,李志伟. 基于Web GIS的城市地铁施工监测信息管理系统研究[J]. , 2009, 30(1): 265-269.
[5] 李利平 ,李术才 ,张庆松 ,王 刚 ,马富奎 . 浅埋大跨隧道施工爆破监测与减震技术[J]. , 2008, 29(8): 2292-2296.
[6] 王 浩 ,李 莉 ,覃卫民 ,汤 华,. ADO在监测信息管理系统开发中的应用[J]. , 2006, 27(S1): 426-429.
[7] 曹国金, 姜弘道. 信息化施工技术在地下工程中的应用[J]. , 2002, 23(6): 795-799.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] 楚锡华,徐远杰. 基于形状改变比能对M-C准则与 D-P系列准则匹配关系的研究[J]. , 2009, 30(10): 2985 -2990 .
[2] 刘豆豆,陈卫忠,杨建平,谭贤君,周喜德. 脆性岩石卸围压强度特性试验研究[J]. , 2009, 30(9): 2588 -2594 .
[3] 王桂尧,李 斌,罗 军,付宏渊. 粉土基质吸力的新型量测装置与土-水特征研究[J]. , 2010, 31(11): 3678 -3682 .
[4] 卢应发,陈朱蕾,谢文良,吕志中. 垃圾卫生填埋中的一些岩土工程技术[J]. , 2009, 30(1): 91 -98 .
[5] 贾 强,应惠清,张 鑫. 锚杆静压桩技术在既有建筑物增设地下空间中的应用[J]. , 2009, 30(7): 2053 -2057 .
[6] 路军富,王明年,贾媛媛,喻 渝,谭忠盛. 高速铁路大断面黄土隧道二次衬砌施作时机研究[J]. , 2011, 32(3): 843 -848 .
[7] 党发宁 ,梁昕宇 ,田 威 ,陈厚群. 混凝土随机骨料模型尺寸效应的细观数值分析[J]. , 2009, 30(S2): 518 -523 .
[8] 王成华,安建国. 含扩径桩的群桩基础竖向承载性状数值分析[J]. , 2011, 32(S2): 580 -585 .
[9] 方 焘 ,刘新荣 ,耿大新 ,罗 照 ,纪孝团 ,郑明新 . 大直径变径桩竖向承载特性模型试验研究(I)[J]. , 2012, 33(10): 2947 -2952 .
[10] 胡万雨 ,陈向浩 ,林 江 ,况磊强 . 瀑布沟水电站砾石土心墙初次蓄水期原位钻孔渗流试验研究[J]. , 2013, 34(5): 1259 -1263 .