锚杆静压桩技术在既有建筑物增设地下空间中的应用

贾 强1, 2,应惠清1,张 鑫2   

  1. 1.同济大学 土木工程学院,上海 200092;2.山东建筑大学 土木工程学院,济南 250014
  • 收稿日期:2007-10-16 出版日期:2009-07-10 发布日期:2011-03-10
  • 作者简介:贾强,男,1970年生,博士研究生,副教授,主要从事建筑物鉴定、加固的研究。
  • 基金资助:

    建设部科技计划项目(No. 2007-K6-13);山东省科技攻关计划项目(No. 2007GG20006005)资助。

Construction of basement in existing buildings by static bolt-pile

JIA Qiang1, 2, YING Hui-qing1, ZHANG Xin2   

  1. 1. School of Civil Engineering, Tongji University, Shanghai 200092, China; 2. School of Civil Engineering, Shandong Jianzhu University, Jinan 250014, China
  • Received:2007-10-16 Online:2009-07-10 Published:2011-03-10

摘要:

运用锚杆静压桩技术在既有建筑物中增设地下空间是可行的,一方面可利用既有建筑物的自重荷载作为压桩的反力,另一方面将压好的桩作为临时托换构件支撑的既有建筑物,建筑物下方的土体才可以开挖。对于黏性土,采用逐根压桩的方案,把所有桩压至设计标高后,待超孔隙水压力消散,才开挖承台下的土体。对于砂性土,可以边开挖土方边压桩,通过控制压桩和挖土速度,很好地控制建筑物的沉降。桩身四周的土体开挖后,其稳定性按照自由长度较大的高承台桩的模型进行分析。锚杆静压桩的压桩阻力是根据土层动力触探的指标确定的,锚杆静压桩的数量根据使用阶段、施工阶段的荷载以及桩身自由段的屈曲稳定性综合确定。按照新旧混凝土界面初始滑移承载力,进行承台的抗冲剪设计是有足够的安全储备的,此时冲剪承载力由几个斜向混凝土柱承担,而承台的下部受拉。锚杆静压桩之间的沉降差会在上部结构中产生附加内力,影响到结构安全。沉降差的计算采用分层总和法,计算时应考虑桩身的重力荷载、桩顶集中荷载等产生的附加应力以及土体开挖附加应力的减少。

关键词: 锚杆静压桩, 既有建筑物, 地下空间, 地下托换

Abstract:

Based on the following two reasons, applying static bolt-pile for construction of basement in existing buildings is practicable. (1) The gravity of the existing building can be used as reaction-force to drive piles; (2) As the temporary underpinning components, the driven piles can be used to support the existing building, thus the soils under the building can be excavated. In clay, when all piles are driven to the design elevation and the excess pore pressure is dissipated, the soil under pile caps can be excavated. In sandy soil, settlements of the existing building can be controlled by controlling the speed of driving piles and excavating soil, thus driving piles and excavating soil can be constructed at the same time. After the soils around the pile is excavated, stability analysis of the pile is done according to a high–caps pile model with a major unsupported length. Resistance in driving pile process is determined by using the dynamic penetration results of soil. The number of the static bolt-piles is calculated synthetically by the loads of service and construction processes and the results of pile stability analysis. According to punching shear bearing capacity before interface slip of new-to-old concrete, the pile cap design has sufficient safety. Punching shear strength is held by some slanting concrete columns; while the tensile force is created in bottom of the pile cap. The differential settlements of piles cause structure additional internal forces which influence safety of the existing building. Calculating the differential settlements by layer-wise summation method should consider factors as following: additional stress increase induced by gravity of piles and concentrated loads on the top of piles, as well as additional stress decrease because of excavating soils.

Key words: static bolt-pile, existing building, basement, underpinning

中图分类号: 

  • TU 443
[1] 单华峰 ,夏唐代 ,胡军华 ,俞 峰 ,仇浩淼 , . 既有建筑物地下室增层开挖桩基屈曲稳定研究[J]. , 2015, 36(S2): 507-512.
[2] 贾 强,郑爱萍,张 鑫. 高承台钢管桩受压稳定性的试验研究和数值分析[J]. , 2011, 32(6): 1736-1740.
[3] 王红雨. 临近基坑既有建筑物地基的抗剪强度指标取值问题[J]. , 2008, 29(8): 2215-2220.
[4] 刘毓氚,李 协,陈福全. 深基坑工程软托换技术影响因素分析[J]. , 2008, 29(6): 1535-1539.
[5] 黄大治,陈龙珠. 旁孔透射波法检测既有建筑物桩基的三维有限元分析[J]. , 2008, 29(6): 1569-1574.
[6] 杜 斌 ,刘祖德 ,聂向珍 ,柴丽芳 . 既有建筑物基础托换技术中的钢管纤维桩工法[J]. , 2007, 28(5): 1040-1044.
[7] 李 韬 ,毕兆云 ,高大钊,. 按复合桩基设计锚杆静压桩处理地基[J]. , 2004, 25(7): 1171-1174.
[8] 刘万兴 , 张 璞. 锚杆静压桩施工产生的附加沉降问题初探[J]. , 2000, 21(1): 88-91.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] 陶干强,杨仕教,任凤玉. 崩落矿岩散粒体流动性能试验研究[J]. , 2009, 30(10): 2950 -2954 .
[2] 张文杰,陈云敏. 垃圾填埋场抽水试验及降水方案设计[J]. , 2010, 31(1): 211 -215 .
[3] 宫伟力,安里千,赵海燕,毛灵涛. 基于图像描述的煤岩裂隙CT图像多尺度特征[J]. , 2010, 31(2): 371 -376 .
[4] 万 智,董 辉,刘宝琛. 基于正交设计下SVM滑坡变形时序回归预测的超参数选择[J]. , 2010, 31(2): 503 -508 .
[5] 孙曦源,栾茂田,唐小微. 饱和软黏土地基中桶形基础水平承载力研究[J]. , 2010, 31(2): 667 -672 .
[6] 胡勇刚,罗 强,张 良,黄 晶,陈亚美. 基于离心模型试验的水泥土搅拌法加固斜坡软弱土地基变形特性分析[J]. , 2010, 31(7): 2207 -2213 .
[7] 谭峰屹,姜志全,李仲秋,颜惠和. 附加质量法在昆明新机场填料压实密度检测中的应用研究[J]. , 2010, 31(7): 2214 -2218 .
[8] 柴 波,殷坤龙,肖拥军. 巴东新城区库岸斜坡软弱带特征[J]. , 2010, 31(8): 2501 -2506 .
[9] 杨召亮,孙冠华,郑 宏. 基于潘氏极大值原理的边坡稳定性的整体分析法[J]. , 2011, 32(2): 559 -563 .
[10] 王光进,杨春和,张 超,马洪岭,孔祥云,侯克鹏. 超高排土场的粒径分级及其边坡稳定性分析研究[J]. , 2011, 32(3): 905 -913 .