Monitoring shield stress of tunnel boring machine and jamming warning

LIU Quan-sheng1,2,3, PENG Xing-xin1,4,5, HUANG Xing1, LEI Guang-feng1,4, WEI Lai1,4, LIU He1,4   

  1. 1. State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan, Hubei 430071, China; 2. School of Civil Engineering and Architecture, Wuhan University, Wuhan, Hubei 430072, China; 3. Key Laboratory of Geotechnical and Structural Safety Engineering of Hubei Province, Wuhan University, Wuhan, Hubei 430072, China; 4. University of Chinese Academy of Science, Beijing 100049, China; 5. China Railway 11th Bureau Group 4th Engineering Co., Ltd., Wuhan, Hubei 430073, China
  • Online:2018-09-11 Published:2018-10-08
  • Supported by:

    The work was supported by the National Program on Key Basic Resaerch Project of China(973 Program)(2015CB058102, 2014CB046904) and the General Program of National Natural Science Foundation of China(51474205).

Abstract: The deformation of surrounding rock tunnelling by tunnel boring machine (TBM) is normally large when the tunnel passes through the deep and weak layer. The TBM shield is squeezed easily by the surrounding rock, which further results in the TBM jamming and influences the operation of TBM. By analyzing the mechanism of TBM shield jamming problems, two important conditions for forecasting TBM jamming are concluded. One is that the deformation of the surrounding rock is greater than the reserved space, and the other is that the rated thrust force cannot overcome the frictional resistance. For monitoring the jamming state of the actual TBM engineering, this study is to propose a scheme of monitoring the deformation of the TBM shield and a method of calculating the pressure of the shield. The extrusion force between the surrounding rock and the shield can be estimated, then the frictional resistance of TBM is calculated, and the state of the TBM jamming can be achieved. According to the relation between TBM frictional resistance force for excavating and the TBM rated thrust, the state of the TBM jamming can be divided into four grades: no jamming, minor jamming, jamming and severe jamming, and the corresponding treatment measures are suggested. At last, the flowchart of warning of the TBM jamming is developed by combining the monitoring scheme with the conditions of TBM jamming. The flowchart and the scheme of monitoring the deformation are successfully applied to Lanzhou water conveyance tunnel engineering, and it is found that the predicted jamming state is nearly the same as the actual state, and thus this method has certain reliability and attaches great importance to TBM tunnelling construction.

Key words: tunnel boring machine (TBM), shield stress, warning mechanism of the TBM jamming

CLC Number: 

  • TU 452

[1] SHI Lin-ken, ZHOU Hui, SONG Ming, LU Jing-jing, ZHANG Chuan-qing, LU Xin-jing, . Physical experimental study on excavation disturbance of TBM in deep composite strata [J]. Rock and Soil Mechanics, 2020, 41(6): 1933-1943.
[2] ZHAI Shu-fang, ZHOU Xiao-ping, BI Jing, . Numerical study of rock fragmentation by TBM cutters using general particle dynamics (GPD) [J]. , 2018, 39(7): 2699-2707.
[3] LIU Quan-sheng, ZHAO Yi-fan, ZHANG Xiao-ping, KONG Xiao-xuan. Study and discussion on point load test for evaluating rock strength of TBM tunnel constructed in limestone [J]. , 2018, 39(3): 977-984.
[4] LIU Quan-sheng, LIU Qi, LIU Xue-wei, SUN Lei, ZHANG Xiao-bo, JI Jie,. Experimental study on penetration failure of soft-hard interbedded rock mass under a wedge indenter [J]. , 2017, 38(7): 1849-1855.
[5] HUANG Xing, LIU Quan-sheng, PENG Xing-xin, LEI Guang-feng, WEI Lai,. Analysis and comprehensive prevention-control for TBM jamming induced by squeezing deformation of surrounding rock around water diversion tunnel from Datong river into Huangshui river [J]. , 2017, 38(10): 2962-2972.
[6] JI Pei-Qi, ZHANG Xiao-Ping, ZHANG Qi,. Partide flow code analysis of effect of ductility-brittleness change on TBM cutters rock fragmentation process and its failure mode [J]. , 2016, 37(S2): 724-734.
[7] TAN Qing , YI Nian-en , XIA Yi-min , ZHU Yi , ZHANG Xu-hui , LING Nai-kuang , . Study of calculation equation of TBM disc cutter optimal spacing [J]. , 2016, 37(3): 883-892.
[8] ZOU Fei1, 2,LI Hai-bo ,ZHOU Qing-chun ,MO zhen-ze ,ZHU Xiao-ming ,NIU Lei ,YANG Feng-wei . Experimental study of influence of joint space and joint angle on rock fragmentation by TBM disc cutter [J]. , 2012, 33(6): 1640-1646.
[9] MA Hui , GAO Ming-zhong , ZHANG Jian-kang , YU Qi-fu. Theoretical model developed for equivalent elastic modulus estimation of cobblestone-soil matrix [J]. , 2011, 32(12): 3642-3646.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!