›› 2017, Vol. 38 ›› Issue (S2): 295-303.doi: 10.16285/j.rsm.2017.S2.041

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Discussion on rock strength estimating method based on TBM parameters

MA Chi-shuai1,2, CHEN Wei-zhong1,3, TIAN Hong-ming1, YANG Jian-ping1   

  1. 1. State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan, Hubei 430071, China; 2. University of Chinese Academy of Sciences, Beijing 100049 , China;3. Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan, Shandong 250061, China
  • Received:2017-03-23 Online:2017-11-23 Published:2018-06-05
  • Supported by:

    This work was supported by the National Program on Key Basic Research Project (973 Program)(2015CB057906).

Abstract: It is difficult to estimate the detailed rock strength of excavating face timely and effectively when tunnel boring machine(TBM) advances, which results in it difficult to predict the risk of rockburst and TBM jamming. Based on previous research results and engineering practices, a method for estimating rock strength using TBM parameters is proposed for real-time in-situ estimation of rock strength. The equation of real-time estimation is established by the mechanical analysis between TBM specifications, excavation parameters and the rock strength. Then the relationships between the constants in the equations and the TBM specifications such as excavation(tunnel) diameter, cutter diameter are determined in this study on the basis of data collected at several tunnels. Typical TBM case studies for application further verified the wide suitability and reliability of the novel equations. The proposed method appears to be promising and feasible for real-time in-situ estimation of rock strength.

Key words: tunnel boring machine(TBM), boring parameters, rock strength, real-time, in-situ estimation

CLC Number: 

  • TU452

[1] WU Xin-lin, ZHANG Xiao-ping, LIU Quan-sheng, LI Wei-wei, HUANG Ji-min. Prediction and classification of rock mass boreability in TBM tunnel [J]. Rock and Soil Mechanics, 2020, 41(5): 1721-1729.
[2] SONG Yong-jun, YANG Hui-min, ZHANG Lei-tao, REN Jian-xi. CT real-time monitoring on uniaxial damage of frozen red sandstone [J]. Rock and Soil Mechanics, 2019, 40(S1): 152-160.
[3] LIU He, LIU Quan-sheng, TANG Xu-hai, LUO Ci-you, WAN Wen-kai, CHEN Lei, PAN Yu-cong, . Identification of the interaction loads between TBM shield and surrounding rock [J]. Rock and Soil Mechanics, 2019, 40(12): 4946-4954.
[4] WU Shun-chuan, ZHANG Min, ZHANG Shi-huai, JIANG Ri-hua, . Study on determination method of equivalent Mohr-Coulomb strength parameters of a modified Hoek-Brown failure criterion [J]. Rock and Soil Mechanics, 2019, 40(11): 4165-4177.
[5] WANG Chao-sheng, ZHOU Hong-wei, HE Shu-sheng, WANG Zi-hui, LIU JIan-feng,. Effect of unloading rates on strength of Beishan granite [J]. , 2017, 38(S2): 151-157.
[6] CHEN Wei-zhong, MA Chi-shuai, TIAN Hong-ming, YANG Jian-ping,. Discussion on rockburst predictive method applying to TBM tunnel construction [J]. , 2017, 38(S2): 241-249.
[7] CHEN Shi-jie, MA Wei, LI Guo-yu, LIU En-long, ZHANG Ge, . Development and application of triaxial apparatus of frozen soil used in conjunction with medical CT [J]. , 2017, 38(S2): 359-367.
[8] CHEN Po-lin, GUO Li-lun, DAVE CHANG Ta-teh. A study of piezometer real-time measurement of the riverbed scour [J]. , 2017, 38(8): 2448-2455.
[9] RAN Shu-guang, JIANG Quan, SONG Lei-bo, WANG Bai-lin,. Remote online monitoring technology for underground engineering and its application to Dashizi tunnel [J]. , 2017, 38(7): 2137-2148.
[10] XU Xu-tang, JIAN Wen-bin, . Experimental study on rainfall infiltration of slope under thrust at front end [J]. , 2017, 38(12): 3547-3554.
[11] LIU Quan-sheng ,PAN Yu-cong,KONG Xiao-xuan,LIU Jian-ping,. Experimental investigation on mudstone fragmentation characteristics in indentation process by TBM disc cutter [J]. , 2016, 37(S1): 166-174.
[12] WANG Chao, ZHANG She-rong, ZHANG Feng-hua, DU Cheng-bo. A dynamic simulation analysis method of high-steep slopes based on real-time numerical model and its applications [J]. , 2016, 37(8): 2383-2390.
[13] ZHANG Wei-jie , LI Shu-cai , WEI Jiu-chuan , ZHANG Qing-song , ZHANG Xiao , LI Zhi-peng , XIE Dao-lei,. Development of a 3D grouting model test system and its application [J]. , 2016, 37(3): 902-911.
[14] CUI Jie, JIANG Quan, FENG Xia-ting, GAO Hong. Theoretical probability distribution of shear strength parameters for rock [J]. , 2015, 36(5): 1261-1274.
[15] TAO Zhi-gang , LI Hai-peng , SUN Guang-lin , YIN Li-jie , ZHANG Xiu-lian,. Development of monitoring and early warning system for landslides based on constant resistance and large deformation anchor cable and its application [J]. , 2015, 36(10): 3032-3040.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!