›› 2016, Vol. 37 ›› Issue (S1): 166-174.doi: 10.16285/j.rsm.2016.S1.022
• Fundamental Theroy and Experimental Research • Previous Articles Next Articles
LIU Quan-sheng1,PAN Yu-cong1,KONG Xiao-xuan2,LIU Jian-ping1,
CLC Number:
TU 452
[1] | LIU He, LIU Quan-sheng, TANG Xu-hai, LUO Ci-you, WAN Wen-kai, CHEN Lei, PAN Yu-cong, . Identification of the interaction loads between TBM shield and surrounding rock [J]. Rock and Soil Mechanics, 2019, 40(12): 4946-4954. |
[2] | CHEN Wei-zhong, MA Chi-shuai, TIAN Hong-ming, YANG Jian-ping,. Discussion on rockburst predictive method applying to TBM tunnel construction [J]. , 2017, 38(S2): 241-249. |
[3] | MA Chi-shuai, CHEN Wei-zhong, TIAN Hong-ming, YANG Jian-ping,. Discussion on rock strength estimating method based on TBM parameters [J]. , 2017, 38(S2): 295-303. |
[4] | ZHOU Jian-jun , YANG Zhen-xing , . Discussion on key issues of TBM construction for long and deep tunnels [J]. , 2014, 35(S2): 299-305. |
[5] | HOU Gong-yu, LIANG Rong, GONG Yan-fen, LIU Lin, TIAN Le. Risk analysis and trend prediction of long inclined-shaft construction in coalmine by TBM [J]. , 2014, 35(S2): 325-331. |
[6] | SUN Jin-shan , CHEN Ming , CHEN Bao-guo , LU Wen-bo , ZHOU Chuan-bo. Numerical simulaiton of influence factors for rock fragmentation by TBM cutters [J]. , 2011, 32(6): 1891-1897. |
[7] | ZHOU Jia-mei,GAO Bo,LI Zhi-ye. Study on mechanical characteristics of precast block of inverted arch for TBM construction tunnel [J]. , 2004, 25(12): 1973-1976. |
|