Rock and Soil Mechanics ›› 2020, Vol. 41 ›› Issue (10): 3317-3325.doi: 10.16285/j.rsm.2020.0050

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Influence of the pre-grouting in free segment on the pullout test of prestressed anchor cable

YANG Qing-guang, LIU Xiong, LIU Jie, HE Jie, LIANG Ling-chuan, CHEN Bin   

  1. College of Civil Engineering, Hunan University of Technology, Zhuzhou, Hunan 412007, China
  • Received:2020-01-14 Revised:2020-06-06 Online:2020-10-12 Published:2020-11-07
  • Supported by:
    This work was supported by the National Natural Science Foundation of China (51978260) and the Natural Science Foundation of Hunan Province (2020JJ6080, 2020JJ6007, 2019JJ60051).

Abstract: To overcome the drawback that the ultimate pullout resistance of prestressed anchor cable cannot be directly obtained by the pullout test, this study proposes a pullout resistance performance evaluation method of pre-stressed anchor cable based on the pullout tests on prestressed anchor cable with pre-grounting in the free segment. Based on the interfacial debonding shear model and the theories of load transfer and elastic deformation, the length ratio of the anchor segment to the free segment was considered in the evaluation method. The results indicate that pre-grouting in free segment can significantly improve the pullout resistance capability of anchor cable. When the interfacial deformation behavior transfers from an elastic manner to debonding stage, the improvement of the pullout resistance will be more pronounced, which will tend to be stable after debonding. The shear displacement and axial force at the interface of the free segment and grouting segment is the highest. With increasing the pullout force, both the shear displacement and axial force increase but the increment declines to the two ends of anchor cable. The shear stress curve is one peak type in the elastic stage and then becomes a saddle type in the debonding stage. The opening of the saddle type curve becomes larger with the improvement of the pullout resistance. Finally, the length ratio of anchoring and free segment has insignificant effects to the ultimate pullout resistance. The reduction coefficient ?Q of the ultimate pullout resistance of pre-grouting anchor cable is in the range from 0.81 to 0.83. The empirical method in paper is feasible due to the fact that merely 6.02% error is existed between the measured ultimate pullout resistance and calculation result when Lb /La is 2.5.

Key words: prestressed anchor cable, pre-grouting in free segment, interfacial debonding, pullout resistance feature, load transfer

CLC Number: 

  • TU 43
[1] HOU Zhen-kun, TANG Meng-xiong, HU He-song, LI Jian-hua, ZHANG Shu-wen, XU Xiao-bin, LIU Chun-lin, . Comparative study on the vertical load-bearing capacity of the drilling with pre-stressed concrete pipe cased pile based on in-situ and physical simulation tests [J]. Rock and Soil Mechanics, 2021, 42(2): 419-429.
[2] AN Cai-long, LIANG Ye, WANG Liang-qing, DENG Shan, SUN Zi-hao, FAN Bin-qiang, ZHENG Luo-bin. Three-dimensional optimization design for the direction angle of anchor cable reinforcement in wedge rock slope [J]. Rock and Soil Mechanics, 2020, 41(8): 2765-2772.
[3] HE Zhi-jun, LEI Hao-cheng, XIA Zhang-qi, ZHAO Lian-heng. Analysis of settlement and internal force displacement of single pile in multilayer soft soil foundation [J]. Rock and Soil Mechanics, 2020, 41(2): 655-666.
[4] LI Jian, CHEN Shan-xiong, YU Fei, JIANG Ling-fa, DAI Zhang-jun. Discussion on mechanism of reinforcing high and steep slope with prestressed anchor cable [J]. Rock and Soil Mechanics, 2020, 41(2): 707-713.
[5] JIA Zhi-bo, TAO Lian-jin, SHI Ming. Stability analysis of prestressed anchor cable slope under seismic loads [J]. Rock and Soil Mechanics, 2020, 41(11): 3604-3612.
[6] CAI Yu, XU Lin-rong, ZHOU De-quan, DENG Chao, FENG Chen-xi, . Model test research on method of self-balance and traditional static load [J]. Rock and Soil Mechanics, 2019, 40(8): 3011-3018.
[7] YU Yu, LIU Xin-rong, LIU Yong-quan, . Field experimental investigation on prestress loss law of anchor cable in foundation pits [J]. Rock and Soil Mechanics, 2019, 40(5): 1932-1939.
[8] LI Lin, LI Jing-pei, SUN De-an, GONG Wei-bing , . Nonlinear load-settlement analysis of pile groups considering pile installation effects [J]. Rock and Soil Mechanics, 2019, 40(2): 668-677.
[9] FEI Kang, DAI Di, HONG Wei, . A simplified method for working performance analysis of single energy piles [J]. Rock and Soil Mechanics, 2019, 40(1): 70-80.
[10] WANG Shen, LI Hua-min, LI Dong-yin, WANG Wen, . The effect of rib on load transfer of the thread steel resin bolt [J]. , 2018, 39(8): 2805-2813.
[11] LU Qing-yuan, LUO Qiang, JIANG Liang-wei, . Calculation of stress ratio of rigid pile to composite embankment [J]. , 2018, 39(7): 2473-2482.
[12] YAN Min-jia, XIA Yuan-you, LIU Ting-ting. Limit analysis of bedding rock slopes reinforced by prestressed anchor cables under seismic loads [J]. , 2018, 39(7): 2691-2698.
[13] LIU Yong-quan, LIU Xin-rong, XIE Ying-kun, YU Yu, . Discussion on selection law of initial stretch locking value of prestressed anchor cables in foundation pits [J]. , 2018, 39(6): 2164-2174.
[14] WAN Zhi-hui, DAI Guo-liang, GONG Wei-ming, . Calculation and analysis of load transfer in large-diameter grouted pile in extra-thick fine sand layers [J]. , 2018, 39(4): 1386-1394.
[15] HUANG Ming-hua, ZHAO Ming-hua, CHEN Chang-fu. Influence of anchorage length on stress in bolt and its critical value calculation [J]. , 2018, 39(11): 4033-4041.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] YAO Yang-ping, HOU Wei. Basic mechanical behavior of soils and their elastoplastic modeling[J]. , 2009, 30(10): 2881 -2902 .
[2] ZHANG Li-ting, QI Qing-lan, WEI Jing HUO Qian, ZHOU Guo-bin. Variation of void ratio in course of consolidation of warping clay[J]. , 2009, 30(10): 2935 -2939 .
[3] ZHANG Qi-yi. Study of failure patterns of foundation under combined loading[J]. , 2009, 30(10): 2940 -2944 .
[4] YI Jun, JIANG Yong-dong, XUAN Xue-fu, LUO Yun, ZHANG Yu. A liquid-solid dynamic coupling modelof ultrasound enhanced coalbed gas desorption and flow[J]. , 2009, 30(10): 2945 -2949 .
[5] ZHANG Ming-yi, LIU Jun-wei, YU Xiu-xia. Field test study of time effect on ultimate bearing capacity of jacked pipe pile in soft clay[J]. , 2009, 30(10): 3005 -3008 .
[6] HUANG Ping-lu, CHEN Cong-xin, XIAO Guo-feng, LIN Jian. Study of rock movement caused by underground mining in mines with complicated geological conditions[J]. , 2009, 30(10): 3020 -3024 .
[7] WU Liang, ZHONG Dong-wang, LU Wen-bo. Study of concrete damage under blast loading of air-decking[J]. , 2009, 30(10): 3109 -3114 .
[8] ZHOU Xiao-jie, JIE Yu-xin, LI Guang-xin. Numerical simulation of piping based on coupling seepage and pipe flow[J]. , 2009, 30(10): 3154 -3158 .
[9] WU Chang-yu, ZHANG Wei, LI Si-shen, ZHU Guo-sheng. Research on mechanical clogging mechanism of releaf well and its control method[J]. , 2009, 30(10): 3181 -3187 .
[10] CUI Hao-dong, ZHU Yue-ming. Back analysis of seepage field of Ertan high arch dam foundation[J]. , 2009, 30(10): 3194 -3199 .