›› 1982, Vol. 3 ›› Issue (1): 1-12.

• Fundamental Theroy and Experimental Research •     Next Articles

Fracture Mechanics Approach for In-situ Stress Determination by Hydra- Fracturing

Wang Jing-tao   

  • Online:1982-06-22 Published:2017-03-10

Abstract: A new fracture mechanics approach for in-situ stress determination by hydra-fracturing is proposed. It improves the fracture mechanics method as presented by Abou-Sayed etc. (1978). The accuracy of determination of the maximum horizontal stress (σHmax) is considerably enhanced by replacing fracture toughness of rock, K1c, and preexisting crack length L in rock by a new parameter U(U=K1c/√2) . The reason is that K1c is related to crack length L when crack length is smaller than a critical value and to determine the length of preexisting crack in rock as accurate as possible is very difficult. In addition the parameter U can be directly measured through a simple hollow-cylinder burst test. Based on recent experimental tests of fracture toughness of rock the new parameter U appears to be a constant when crack lengths are smaller than a certain critical value . The parameter √2 U may be taken also as a tensile strength of rock which contains small randomly distributed preexisting cracks.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] ZHAN Yong-xiang, JIANG Guan-lu. Study of dynamic characteristics of soil subgrade bed for ballastless track[J]. , 2010, 31(2): 392 -396 .
[2] WAN Zhi, DONG Hui, LIU Bao-chen. On choice of hyper-parameters of support vector machines for time series regression and prediction with orthogonal design[J]. , 2010, 31(2): 503 -508 .
[3] GAO Guang-yun, ZHAO Yuan-yi, GAO Meng, YANG Cheng-bin. Improved calculation for lateral dynamic impedance of pile groups in layered soil[J]. , 2010, 31(2): 509 -515 .
[4] WANG Ming-nian, GUO Jun, LUO Lu-sen, Yu Yu, Yang Jian-min, Tan Zhon. Study of critical buried depth of large cross-section loess tunnel for high speed railway[J]. , 2010, 31(4): 1157 -1162 .
[5] HU Yong-gang, LUO Qiang, ZHANG Liang, HUANG Jing, CHEN Ya-mei. Deformation characteristics analysis of slope soft soil foundation treatment with mixed-in-place pile by centrifugal model tests[J]. , 2010, 31(7): 2207 -2213 .
[6] LU Li, ZHANG Si-ping, ZHANG Yong-xing, HU Dai-wen, WU Shu-guang. Field pull-out test and behavior analysis of compression type rock anchor cables[J]. , 2010, 31(8): 2435 -2440 .
[7] ZHANG Jian-min,WANG Fu-qiang. Post-liquefaction flow failure of saturated dilative sands and its mechanism[J]. , 2010, 31(9): 2711 -2715 .
[8] LIU Han-long,TAO Xue-jun,ZHANG Jian-wei,CHEN Yu-min. Behavior of PCC pile composite foundation under lateral load[J]. , 2010, 31(9): 2716 -2722 .
[9] WANG Guan-shi,LI Chang-hong,HU Shi-li,FENG Chun,LI Shi-hai. A study of time-and spatial-attenuation of stress wave amplitude in rock mass[J]. , 2010, 31(11): 3487 -3492 .
[10] XIONG Wei, ZHOU Zeng-hui, YU Kai-biao, WU Ya-ping, LUO Wei. Concrete ultrasonic tomography imaging and improvement based on curved path[J]. , 2011, 32(2): 629 -634 .