Study and application of technique of removable anchor rod to foundation pit engineering

ZHAO Hai-sheng1,2   

  1. 1. Xi’an University of Technology, Xi’an 710048, China; 2. Henan Provincial Academy of Building Research, Zhengzhou 450053, China
  • Received:2004-05-27 Online:2005-11-10 Published:2014-01-03

Abstract: To avoid making barriers for follow-up engineering and save from a trouble of law, the temporary anchor rods of foundation pit brace should be removed when them have no effects. After some analyses of load transfer behavior of anchor rod, and based on the results of field test, a type of technique of removable anchor for which the pull rod can be removed, is proposed. By setting separation layer between pull rod and slip casting body to remove pull rod, and by setting bearing body with pole to disperse load to slip casting body, this technique is realized. Actual engineering example shows that this technique is easy and feasible. Because of the stress in removable anchor rod is reasonable, its technical characteristics are higher than traditional anchor rod too.

Key words: foundation pit, anchor-pull brace, pull rod, removable anchor rod, noncohesive steel stranded wire

CLC Number: 

  • TU 473
  • Please send e-mail to pingzhou3@126.com if you would like to read full paper in English for free. Parts of our published papers have English translations.
[1] YU Yu, LIU Xin-rong, LIU Yong-quan, . Field experimental investigation on prestress loss law of anchor cable in foundation pits [J]. Rock and Soil Mechanics, 2019, 40(5): 1932-1939.
[2] ZHONG Guo-qiang, WANG Hao, KONG Li, WANG Cheng-tang, . Evaluation of the possibility of foundation pit collapse with " diaphragm wall+ support" based on T-S fuzzy fault tree [J]. Rock and Soil Mechanics, 2019, 40(4): 1569-1576.
[3] ZHANG Xiao, XIAO Jun-hua, NONG Xing-zhong, GUO Jia-qi, WU Nan, . Analysis of influenced zone of foundation pit excavation adjacent to bridge pile foundation using HS-Small constitutive model [J]. Rock and Soil Mechanics, 2018, 39(S2): 263-273.
[4] ZHENG Gang, LI Qing-han, HA Da, CHENG Xue-song, . Study of stress state and settlement induced by pressure relief of confined aquifers in Tianjin [J]. Rock and Soil Mechanics, 2018, 39(S2): 285-294.
[5] LIU Cheng-yu, ZHANG Zhi-xiang,. Improved calculation method of foundation pit enclosure structure based on p-y curve [J]. , 2018, 39(S1): 446-452.
[6] OU Xiao-duo, QUAN Shou-yue, PENG Yuan-sheng, JIANG Jie, Lü Bo, JIANG Hua,. Design and test of a new type prefabricated supporting structure for foundation pit [J]. , 2018, 39(9): 3433-3439.
[7] ZHANG Yu-wei, XIE Yong-li, WENG Mu-sheng,. Centrifugal test on influence of asymmetric foundation excavation to an underlying subway tunnel [J]. , 2018, 39(7): 2555-2562.
[8] HU Yong, LI Yun-an, LI Bo, LI Cong-an, XIAO Jie-fu,. Centrifugal model tests and numerical simulation of three-dimensional space effect of deep and large foundation pit under the confined water level fluctuation [J]. , 2018, 39(6): 1999-2007.
[9] LIU Yong-quan, LIU Xin-rong, XIE Ying-kun, YU Yu, . Discussion on selection law of initial stretch locking value of prestressed anchor cables in foundation pits [J]. , 2018, 39(6): 2164-2174.
[10] LIU Cheng-yu, CHEN Shu-yun,. Improvement of incremental calculation method of retaining structure for foundation pit [J]. , 2018, 39(5): 1834-1839.
[11] ZHOU Ze-lin, CHEN Shou-gen, TU Peng, ZHANG Hai-sheng, . Coupling method for analyzing the influence on existing tunnel due to adjacent foundations pit excavation [J]. , 2018, 39(4): 1440-1449.
[12] LI Lian-xiang, FU Qing-hong, HUANG Jia-jia, . Centrifuge model tests on cantilever foundation pit engineering in sand ground and silty clay ground [J]. , 2018, 39(2): 529-536.
[13] ZHENG Gang, NIE Dong-qing, DIAO Yu, CHENG Xue-song ,. Failure mechanism of multi-bench retained foundation pit [J]. , 2017, 38(S1): 313-322.
[14] WANG Chun-yan , ZHANG Fang-tao, MA Yun, KANG An-dong, XU Guang-li, LI Song,. A method for calculating horizontal stiffness coefficient of ring supporting system for foundation pit [J]. , 2017, 38(3): 840-846.
[15] ZHANG Zhi-guo, LU Ming-hao, GONG Jian-fei,. Time-domain solution for influence of excavation on adjacent pile deformation in visco-elastic foundation [J]. , 2017, 38(10): 3017-3028.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] CHENG Tao, YAN Ke-qin. Numerical simulation for influences of stress paths on earth's surface deformation[J]. , 2010, 31(2): 661 -666 .
[2] MI Hai-zhen, GAO Chun. Experimental study of expansive behaviors of quicklime[J]. , 2010, 31(4): 1253 -1256 .
[3] SONG Fei,LIU Chao,ZHANG Jian-min,ZHENG Rui-hua. Development of centrifuge model test facility of retaining wall[J]. , 2010, 31(9): 3005 -3011 .
[4] XIAO Lin, YANG Cheng-kui, HU Zeng-hui, LI Xiao-zhao, LI Mo. Model test on temperature distribution in metro tunnel surrounding rock and inverse calculation of its thermal conductivity[J]. , 2010, 31(S2): 86 -91 .
[5] CHEN Jing-yu , GONG Xiao-nan, DENG Ya-hong. Research on dissipation of excess pore water pressure in one-dimensional finite strain consolidation of soft clays[J]. , 2009, 30(1): 191 -195 .
[6] FU Cheng-hua, ZHOU Hong-bo, CHEN Sheng-hong. Equivalent mechanical model of joined rockmass reinforced by shotcrete lining and its application[J]. , 2009, 30(7): 1967 -1973 .
[7] SUN Jian , WANG Lian-guo , TANG Fu-rong , SHEN Yi-feng , GONG Shi-long. Microseismic monitoring failure characteristics of inclined coal seam floor[J]. , 2011, 32(5): 1589 -1595 .
[8] XU Zheng-ming, XUE Qiang, ZHAO Ying. Research on time effect of modified sludge composites by triaxial tests on mechanical properties[J]. , 2011, 32(6): 1713 -1718 .
[9] CUI Wei, SONG Hui-fang, ZHANG She-rong, YAN Shu-wang. Numerical simulation of craters produced by explosion in soil[J]. , 2011, 32(8): 2523 -2528 .
[10] CHEN Ming , HU Ying-guo , LU Wen-bo , YAN Peng , ZHOU Chuang-bing. Blasting excavation induced damage characteristics of diversion tunnel for Jinping cascade II hydropower station[J]. , 2011, 32(S2): 172 -177 .