›› 2006, Vol. 27 ›› Issue (S1): 769-773.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Risk analysis of overlength bored piles construction on complicated geological conditions

WANG You-zhi1,CHANG Xiao-li2,WANG Xiao-ping3   

  1. 1. Shandong University,Jinan 250061, China;2. Shandong Institute of Metallurgy Design, Jinan 250014, China; 3. Shandong Binzhou Highway Administration, Binzhou 256600, China
  • Received:2006-03-21 Published:2006-12-15

Abstract: It has apparently high risk for bored bottling pile construction in super bridge foundation construction. The full understanding of risk source, the implementation of risk assessment and risk analysis, the prompt prevention and elimination of construction risk have vital significance. As for the Fuchun River great Bridge Project, it was analyzed for contractors that the risk in cross-river bridge foundation construction on complicated geological conditions. From the project management, risk factors were particularly discussed for project cost, progress and quality in over-length bore bottling pile construction. In order to profit construction management, promote project benefit and accelerate the development of risk management, a multilayer fuzzy synthesis evaluation model has been established for the bridge project risk.

Key words: great bridge, complicated geology, bored pile, risk analysis, synthetical evaluation

CLC Number: 

  • TU 71
  • Please send e-mail to pingzhou3@126.com if you would like to read full paper in English for free. Parts of our published papers have English translations.
[1] HUANG Sheng-gen, SHEN Jia-hong, LI Meng, . Reliability analysis of bearing capacity of post-grouted bored piles [J]. Rock and Soil Mechanics, 2019, 40(5): 1977-1982.
[2] DONG Zhi-hong, DING Xiu-li, HUANG Shu-ling, WU Ai-qing, CHEN Sheng-hong, ZHOU Zhong, . Analysis of ageing-stress characteristics and long-term bearing risk of anchor cable for a large cavern in high geo-stress area [J]. Rock and Soil Mechanics, 2019, 40(1): 351-362.
[3] LI Hong-jiang, TONG Li-yuan, LIU Song-yu, BAO Hong-yan, YANG Tao, . Parameter sensitivity of horizontal bearing capacity of large diameter and super-long bored pile [J]. , 2018, 39(5): 1825-1833.
[4] ZHANG Xiao-yan, ZHANG Li-xiang, LI Ze,. Reliability analysis of soil slope based on upper bound method of limit analysis [J]. , 2018, 39(5): 1840-1849.
[5] LEI Wen-kai, XIAO Heng-lin, ZHANG Jin-tuan, LIU Yong-li, FAN Meng ,. Model test on detection of intercalated mud bored pile using optical fiber sensing technology [J]. , 2018, 39(3): 909-916.
[6] XIONG Zi-ming, LU Hao, WANG Ming-yang, QIAN Qi-hu, RONG Xiao-li,. Research progress on safety risk management for large scale geotechnical engineering construction in China [J]. , 2018, 39(10): 3703-3716.
[7] LI Yong-hui, ZHU Xiang, ZHOU Tong-he,. Experimental study of effects of pile tip post grouting on bearing characteristics of large-diameter bored pile [J]. , 2016, 37(S2): 388-396.
[8] LI Lin, LI Jing-pei, YUE Zhu-wen, TANG Jian-hua, . Mechanical mechanism of hole-wall stability of bored pile in saturated clay [J]. , 2016, 37(9): 2496-2504.
[9] LI Yong-hui , WANG Wei-dong , WU Jiang-bin,. A calculation method of pile shaft ultimate friction of tip post grouted super-long bored pile [J]. , 2015, 36(S1): 382-386.
[10] YAO Jian-ping , CAI De-gou , ZHU Jian , WANG Li-wei,. Research on post-grouting bored pile load-bearing characteristics [J]. , 2015, 36(S1): 513-517.
[11] LI Yong-hui ,WANG Wei-dong ,HUANG Mao-song ,GUO Yuan-cheng,. Experimental research on pile-soil interface shear behaviors of super-long bored pile [J]. , 2015, 36(7): 1981-1988.
[12] LIU Nian-wu , GONG Xiao-nan , YU Feng , FANG Kai , . Analysis of spatial effects in strutted excavation and related influential factors [J]. , 2014, 35(8): 2293-2298.
[13] CAO Yu-chun ,LIU Fu-ling,. Reliability analysis of foundation bearing capacity based on combined coefficients of variation [J]. , 2014, 35(7): 1950-1956.
[14] DU Yi-Ming ,ZHENG Gang ,ZHANG Li-Ming,. Theoretical analysis of comprehensive coefficient of pile compression for super-long bored pile considering effect of deep excavation [J]. , 2014, 35(7): 2019-2028.
[15] WEN Sen ,HE Dong-qing ,YANG Sheng-qi,. Comprehensive risk analysis of TBM construction accident induced by tunnel deformations [J]. , 2014, 35(6): 1727-1734.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] XIANG Tian-bing, FENG Xia-ting, CHEN Bing-rui, JIANG Quan, ZHANG Chuan-qing. Rock failure mechanism and true triaxial experimental study of specimens with single structural plane under three-dimensional stress[J]. , 2009, 30(10): 2908 -2916 .
[2] ZHANG Chang-guang,ZHANG Qing-he,ZHAO Jun-hai. Unified solutions of shear strength and earth pressure for unsaturated soils[J]. , 2010, 31(6): 1871 -1876 .
[3] YANG Tian-hong, CHEN Shi-kuo, ZHU Wan-cheng, LIU Hong-lei. Coupled model of gas-solid in coal seams based on dynamic process of pressure relief and gas drainage[J]. , 2010, 31(7): 2247 -2252 .
[4] WANG Zhe-chao, LI Shu-cai. One-dimensional mechanical behavior of granular material under high stresses(Part I): compression behavior[J]. , 2010, 31(10): 3051 -3057 .
[5] SUN Tie-cheng, GAO Bo, WANG Zheng-zheng. Aseismic and seism-reducing modeling study for entrance of two-track tunnels[J]. , 2009, 30(7): 2021 -2026 .
[6] HU Xiu-hong,WU Fa-quan. Research on two-parameter negative exponential distribution of discontinuity spacings in rock mass[J]. , 2009, 30(8): 2353 -2358 .
[7] LEI Hong-jun,LIU Zhong-ge,YU Yu-zhen,Lü He. Experimental study of seepage characteristics of clayey soil-structure interface under large shear deformation[J]. , 2011, 32(4): 1040 -1044 .
[8] BING Hui , HE Ping. Experimental study of water and salt redistributions of saline soil with different freezing modes[J]. , 2011, 32(8): 2307 -2312 .
[9] ZHANG Gui-min , LI Yin-ping , SHI Xi-lin , YANG Chun-he , WANG Li-juan. Research on a model material preparation method for alternate layered rock mass and preliminary experiment[J]. , 2011, 32(S2): 284 -289 .
[10] WANG Wei LI Xiao-chun LI Qiang SHI Lu WANG Ying BAI Bing. Small size in-situ transient pulse permeability measurement system and its experimental research[J]. , 2011, 32(10): 3185 -3189 .