›› 2007, Vol. 28 ›› Issue (6): 1139-1144.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Study on in-situ test of rock-bolted crane girder in Xiaowan Hydropower Station

TU Zhi-jun, CUI Wei   

  1. Research and Design Institute of the Construction Bureau of Water Resources and Hydropower China, Kunming 650041, China
  • Received:2006-03-03 Online:2007-06-11 Published:2013-09-13

Abstract: The anchored crane beam is used in the underground power house of Xiaowan Hydropower Station in which the generator room, one of the biggest rooms under construction, is 28.3 m in width and 79.88 m in height. Two faults with width ranging from 0.5 to 8.5 m and in high dip angle cross the generator room and the concrete crane beam. Therefore, the stability of the rock-bolted crane girder needs to be studied before the construction. This paper introduces the in situ model test that is carried out in the draft-tube gate room with the similar engineering geology condition. The setup of the monitoring instrument and the process of loading are included. The monitoring data are carefully analyzed; and the model test results demonstrate that the anchored crane beam can work at full capacity and its stability is guaranteed.

Key words: anchored crane beam, in situ model test, underground power house

CLC Number: 

  • TV 223
  • Please send e-mail to pingzhou3@126.com if you would like to read full paper in English for free. Parts of our published papers have English translations.
[1] GUO Ming-wei, LI Chun-guang, WANG Shui-lin, LUAN Guang-bo. Study on inverse analysis of 3-D initial geostress field with optimized displacement boundaries [J]. , 2008, 29(5): 1269-1274.
[2] QIN Wei-min , SUN Yi , CHEN Run-fa , WANG Hao , GE Xiu-run . Application of total station instrument and sliding micrometer to monitoring Shuibuya Underground Powerhouse [J]. , 2008, 29(2): 557-561.
[3] SHENG Qian ,HUANG Zheng-jia , WU Ai-qing,. Stability analysis for random key block of underground power house of Three Gorges Project [J]. , 2002, 23(6): 747-749.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] SUN Shu-lin,LI Fang,CHEN Jun. Electrical resistivity measurement for lime-stabilized silt soil[J]. , 2010, 31(1): 51 -55 .
[2] LI Ying-yong,ZHANG Ding-li,ZHANG Hong-bo,SONG Xiu-guang. Research on failure mechanism and effects of prestressed anchor cables for reinforcing slopes[J]. , 2010, 31(1): 144 -150 .
[3] LI Jing,MIAO Lin-chang,ZHONG Jian-chi,FENG Zhao-xiang. Deformation and damping characteristics of EPS beads-mixed lightweight soil under repeated load-unloading[J]. , 2010, 31(6): 1769 -1775 .
[4] LIANG Jian-wei, FANG Ying-guang, GU Ren-guo. Analysis of microelectric field effect of seepage in tiny-particle clay[J]. , 2010, 31(10): 3043 -3050 .
[5] WANG Li-yan,JIANG Peng-ming,LIU Han-long. Mechanism analysis of residual liquefied deformation of breakwater during earthquake[J]. , 2010, 31(11): 3556 -3562 .
[6] LI Xiu-zhen,WANG Cheng-hua,DENG Hong-yan. A comparison of distance and Fisher discrimination methods applied to identifying potential landslides[J]. , 2011, 32(1): 186 -192 .
[7] KONG Xiang-xing, XIA Cai-chu, QIU Yu-liang, ZHANG Li-ying, GONG Jian-wu. Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region[J]. , 2011, 32(2): 516 -524 .
[8] JI Wu-jun. Investigation and analysis of engineering problems for loess tunnels[J]. , 2009, 30(S2): 387 -390 .
[9] CHEN Li-hua , LIN Zhi , LI Xing-ping. Study of efficacy of systematic anchor bolts in highway tunnels[J]. , 2011, 32(6): 1843 -1848 .
[10] ZHAO Ming-hua, LEI Yong, ZHANG Rui. Study of punching failure mode and safe thickness of pile foundation in karst region[J]. , 2012, 33(2): 524 -530 .