›› 2011, Vol. 32 ›› Issue (12): 3555-3560.

• Fundamental Theroy and Experimental Research • Previous Articles     Next Articles

Study of internal forces and case study of pipe-roof for box culvert jacking and replacement full face pipe-roof method

XIA Cai-chu1, QUE Cheng-ke1, LIU Sheng1, 2   

  1. 1. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 2. Changsha Railway Transit Group Co., Ltd., Changsha 410000, China
  • Received:2010-06-02 Online:2011-12-10 Published:2011-12-13

Abstract: In box culvert jacking and replacement full face pipe-roof method, steel pipes are jacked between the start well and the receiving well. Soil in the pipes is excavated and the full face pipe-roof forms the shape of the box culvert. Subsequently, box culvert is jacked and replaces the full face pipe-roof. Specific to the pipe-roof which is considered to be an elastic foundation beam, two mechanical calculation models of the pipe-roof are built; the deflection curve equation of pipe-roof and the relating settlement control conditional derivation equation can apply to analyze the vertical deformation. By using the elastic foundation method and the simulation test analogy method, it is found that the calculation result is similar to the test result, which means the deflection curve equation is rational and provides theoretical basis for real projects.

Key words: box culvert jacking, replacement, pipe-roof, full face, elastic foundation beam

CLC Number: 

  • TV 554
[1] LU Liang, SHI Tong-hui, YANG Dong, . Control effect of uneven settlement of subgrade by composited method of replacement load shedding and reinforced embankment [J]. Rock and Soil Mechanics, 2019, 40(9): 3474-3482.
[2] WANG Bing-long, MEI Zhen, XIAO Jun-hua. Experimental study of subgrade reinforcement and diseases treatment by geocell [J]. , 2018, 39(S1): 325-332.
[3] ZHANG Zhi-guo, MA Bing-bing, HUANG Mao-song, XU Xiao-yang,. Influence analyses on force and deformation of existing tunnels induced by landslide in mountain region [J]. , 2018, 39(10): 3555-3564.
[4] LI Lian-xiang, HUANG Jia-jia, FU Qing-hong, CHENG Xiao-yang, HU Feng, . Centrifuge experimental study of mechanical properties of composite foundation with different replacement rates under additional load [J]. , 2017, 38(S1): 131-139.
[5] YUE Hao-miao, HUANG Jian-ming, WEN Tao, MI Hai-zhen,. Experimental study of foundation treatment of sulphate saline sandy soil using heavy cover replacement technique [J]. , 2017, 38(2): 471-478.
[6] HU Xiu-qing,, DONG Quan-yang, Lü Cheng-wei, WANG Jun, ZHUANG Xin-shan,. Resonant column experimental study of dynamic properties of soft clay foundation with cement soil mixing piles [J]. , 2016, 37(S2): 343-348.
[7] MA Yong-feng , ZHOU Ding-heng , ZHANG Zhi-hao , CAO Li-qiao,. In-situ test on vibro-replacement stone pile in large petrochemical foundation treatment [J]. , 2015, 36(S1): 327-333.
[8] LI Mei-rong , CHEN Yuan , ZHANG Lin , YANG Bao-quan , . Impacts of multi-structural planes on gravity dam foundation stability and treatment under complex geological conditions [J]. , 2014, 35(S1): 328-333.
[9] WANG Dao-yuan , YUAN Jin-xiu , ZHU Zheng-guo , ZHU Yong-quan,. Theoretical solution of longitudinal upward movement of underwater shield tunnel and its application [J]. , 2014, 35(11): 3079-3085.
[10] ZHENG Ling-wei ,ZHOU Feng-hua , . Experimental study of forming process of replacement pier in soft soil using dynamic replacement method [J]. , 2014, 35(1): 90-97.
[11] YAN Jing ,FANG Xiao-min,. Review of calculation methods of earth berm before retaining structure and a new simplified analytical method [J]. , 2014, 35(1): 167-174.
[12] TANG Ren-hua,CHEN Chang-fu,LIANG Guan-ting. Reliability analysis in stages for frame-type prestressed anchor system [J]. , 2014, 35(1): 217-225.
[13] ZHANG Yong-xing , DING Min , WANG Hui . Analysis method for diaphragm wall structure based on Melan’s solution [J]. , 2012, 33(10): 2890-2896.
[14] SHUI Wei-hou. Exploring concept of dynamic replacement and measured length of replacement pier [J]. , 2011, 32(S2): 502-506.
[15] CHEN Jin-feng , SONG Er-xiang , XU Ming. Application of strength reduction FEM to stability analysis of high fill slope in Kunming new airport [J]. , 2011, 32(S1): 636-0641.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] HE Si-ming, WU Yong, LI Xin-po. Research on mechanism of uplift rock-socketed piles[J]. , 2009, 30(2): 333 -337 .
[2] LIU Qing-bing,XIANG Wei,ZHANG Wei-feng,CUI De-shan. Experimental study of ionic soil stabilizer-improves expansive soil[J]. , 2009, 30(8): 2286 -2290 .
[3] KUANG Yu-chun, WU Kai-song, YANG Ying-xin, MA De-kun. Simulation model of drilling process of three-cone bit[J]. , 2009, 30(S1): 235 -238 .
[4] DU Wen-qi, WANG Gang. Statistical analysis of earthquake-induced sliding displacements of earth structures[J]. , 2011, 32(S1): 520 -0525 .
[5] XU Zhen-hao , LI Shu-cai , LI Li-ping , HOU Jian-gang , SUI Bin , SHI Shao-shuai. Risk assessment of water or mud inrush of karst tunnels based on analytic hierarchy process[J]. , 2011, 32(6): 1757 -1766 .
[6] WEN Shi-qing , LIU Han-long , CHEN Yu-min. Analysis of load transfer characteristics of single grouted gravel pile[J]. , 2011, 32(12): 3637 -3641 .
[7] LI Shun-qun ,GAO Ling-xia ,CHAI Shou-xi. Significance and interaction of factors on mechanical properties of frozen soil[J]. , 2012, 33(4): 1173 -1177 .
[8] ZHONG Sheng ,WANG Chuan-ying ,WU Li-xin ,TANG Xin-jian ,WANG Qing-yuan. Borehole radar response characteristics of point unfavorable geo-bodies: forward simulation of its surrounding rock and filling condition[J]. , 2012, 33(4): 1191 -1195 .
[9] MENG Zhen, CHEN Jin-jian, WANG Jian-hua, YIN Zhen-yu. Study of model test on bearing capacity of screw piles in sand[J]. , 2012, 33(S1): 141 -145 .
[10] LUO Gang , HU Xie-wen , GU Cheng-zhuang . Study of kinetic failure mechanism and starting velocity of consequent rock slopes under strong earthquake[J]. , 2013, 34(2): 483 -490 .