›› 2014, Vol. 35 ›› Issue (S2): 445-452.

• Geotechnical Engineering • Previous Articles     Next Articles

Study of blasting vibration control technology of up and down cross tunnel

YU Jian-xin1, CHEN Wei-zhong1, 2, YANG Jian-ping1, YANG Fan1, LI Ming1, KUANG Yue-lin3, DAI Yong-hao1   

  1. 1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences, Wuhan, 430071, China; 2. Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan, 250061, China; 3. Dongguan Express Development Ltd. Co., Dongguan, Guangdong 523000, China
  • Received:2013-12-20 Online:2014-10-31 Published:2014-11-12

Abstract: Drilling and blasting method is a major construction method in tunnel excavation. Blasting excavation will inevitably produce vibration disturbance on the surrounding rock. Based on the project of new Zoumagang tunnel passing through upon Dong-Shen water supply tunnel, blasting vibration control technology is studied. In order to ensure safety of the existing tunnel, the new tunnel blasting construction should be strictly controlled. Construction section is selected which is consistent with the lithological character of the cross-section. Blasting vibration is monitored and vibration law is got under field conditions of the construction. Sadovski formula of peak particle velocity (PPV) for Zoumagang zone is calculated by regression analysis of the measured data. The maximum cutting dosage, safety distance, range of vibration control and the corresponding blasting plan are formulated according the formula and standard, and are verified by simulation, and are implemented on in-situ construction. The in-situ construction measured results in cross-section show that the vibration velocity control standard and blasting designation proposed satisfy the safety requirements, so as to ensure the excavation safety of the constructing tunnel and existing tunnel. Research work has a higher significance and reference value for similar excavation works and vibration control.

Key words: cross tunnel, blasting vibration, regression analysis, Sadovski formula, vibration velocity, vibration control

CLC Number: 

  • U 455.6
[1] JIANG An-nan, ZHANG Quan, WU Hong-tao, DUAN Long-mei, JIAO Ming-wei, BAI Tao, . Stability analysis of slope affected by blasting based on improved local safety method [J]. Rock and Soil Mechanics, 2019, 40(S1): 511-518.
[2] HU Shuai-wei, CHEN Shi-hai, . Analytical solution of dynamic response of rock bolt under blasting vibration [J]. Rock and Soil Mechanics, 2019, 40(1): 281-287.
[3] NIU Ting-ting, LIU Han-long, DING Xuan-ming, CHEN Yun-min,. Piled embankment model test on vibration characteristics under high-speed train loads [J]. , 2018, 39(3): 872-880.
[4] LIU Jin-hui, LI Wen-xiao, LIU Yu-sen, LIU Bao-guo,. A method for determining the ratio of similar material to simulate porous water-bearing stratum [J]. , 2018, 39(2): 657-664.
[5] LI Rui-shan, YUAN Xiao-ming, LI Cheng-cheng. Analysis of relationship between dynamic shear strain and vibration velocity of horizontal soil layers [J]. , 2018, 39(10): 3623-3630.
[6] LI Chang-jun, CHEN Wei-zhong, YANG Jian-ping, LIU Jin-quan, . Variation of segment joint opening of underwater shield tunnel in operation period [J]. , 2018, 39(10): 3783-3793.
[7] PENG Huai-de, LIU Dun-wen, CHU Fu-jiao, JIAN Ying-hua,. Test on high pressure gas expansion rock fragmentation in hard rock tunnel [J]. , 2018, 39(1): 242-248.
[8] LI Shu-cai, FENG Xiao, LIU Ren-tai, ZHANG Le-wen, HAN Wei-wei, ZHENG Zhuo. Diffusion of grouting cement in sandy soil considering filtration effect [J]. , 2017, 38(4): 925-933.
[9] XU Guo-sheng,LI De-hai,HOU De-feng,ZHANG Yan-bin. Measurement and prediction of the transientsurface movement and deformation induced by mining under thick alluvium [J]. , 2016, 37(7): 2056-2062.
[10] LIU Dong, GAO Wen-xue, SUN Bao-ping, LIU Dan-hui, ZHOU Shi-sheng,. Numerical simulation of blasting vibration on existing tunnel extension [J]. , 2016, 37(10): 3011-3016.
[11] GAO Guang-yun , LI Shao-yi , TU Mei-ji , ZHANG Xian-lin,. Analysis of settlement of cross tunnels under cyclic metro loading [J]. , 2015, 36(S1): 486-490.
[12] SHI Xiao-meng, LIU Bao-guo, QI Yi. Applicability of similar materials bonded by cement and plaster in solid-liquid coupling tests [J]. , 2015, 36(9): 2624-2630.
[13] LI Zhi-yong ,DONG Cheng ,ZOU Jing-rong ,ZOU Wei-lie,. Research on experiment and prediction model of dynamic resilient modulus of laterite soil in Southern Hunan [J]. , 2015, 36(7): 1840-1846.
[14] SHI Xiao-meng , LIU Bao-guo , XIAO Jie,. A method for determining the ratio of similar materials with cement and plaster as bonding agents [J]. , 2015, 36(5): 1357-1362.
[15] LI Shu-cai , LI Ke-xian , LEI Gang , SUN Guo-fu,. Study of blasting vibration and deformation control for metro construction beneath existing metro tunnel in short distance [J]. , 2014, 35(S2): 284-289.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] TAN Xian-jun, CHEN Wei-zhong, YANG Jian-ping, YANG Chun-he. Study of THM-damage coupling model of gas storage in salt rock with interlayer[J]. , 2009, 30(12): 3633 -3641 .
[2] WEI Xing,WANG Gang,YU Zhi-ling. FEM of traffic-load-induced settlement of road on soft clay[J]. , 2010, 31(6): 2011 -2015 .
[3] WEN Shi-yi, LI Jing , SU Xia , YAO Xiong. Studies of mesomechanical structure characters of surrounding rock failure under complex stress state[J]. , 2010, 31(8): 2399 -2406 .
[4] MAO Ning,ZHANG Yao-liang. Typical examples of simple methods to find empirical formulas[J]. , 2010, 31(9): 2978 -2982 .
[5] LIU Jie,LI Jian-lin,QU Jian-jun,Cheng Xing,LI Jian-wu,LUO Shi-wei. Multiple factors analysis of influence of developing horizontal displacement at Dagangshan dam abutment slope based on unloading rock mass mechanics[J]. , 2010, 31(11): 3619 -3626 .
[6] LI Wei-hua, ZHAO Cheng-gang, DU Nan-xin. Analysis of effects of saturated soft interlayer on seismic responses of metro station[J]. , 2010, 31(12): 3958 -3963 .
[7] HAN Xian-min. Study of construction technology and mechanical effect of Guanjiao tunnel in shallow-buried sandy stratum in Xining-Golmud 2nd line[J]. , 2010, 31(S2): 297 -302 .
[8] JIANG Zheng-wei, PENG Jian-bing, WANG Qi-yao. Adverse geological problems and countermeasure of Xi’an Metro Line 3[J]. , 2010, 31(S2): 317 -321 .
[9] LIU Yong-hai, ZHU Xiang-rong, CHANG Lin-yue. Determining preconsolidation pressure by mathematic analysis based on casagrande method[J]. , 2009, 30(1): 211 -214 .
[10] ZHU Lei, HONG Bao-ning. Physico-mechanical characteristics of powdered soil of coal measure strata[J]. , 2009, 30(5): 1317 -1322 .