Rock and Soil Mechanics ›› 2022, Vol. 43 ›› Issue (S2): 414-424.doi: 10.16285/j.rsm.2021.1682

• Geotechnical Engineering • Previous Articles     Next Articles

Comparative analysis of construction reinforcement scheme of super large rectangular pipe jacking shield tunnel close to and under high-speed railway

CUI Guang-yao1, MA Jian-fei2, NING Mao-quan3, 4, TANG Zai-xing3, 4, LIU Shun-shui3, 4, TIAN Yu-hang1   

  1. 1. School of Civil Engineering, North China University of Technology, Beijing 100144, China; 2. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China; 3. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan, Hubei 430064, China; 4. Haixia Traffic Engineering Design Co., Ltd., Fuzhou, Fujian 350004, China
  • Received:2021-10-06 Revised:2022-02-16 Online:2022-10-10 Published:2022-10-09
  • Supported by:
    This work was supported by the National Natural Science Foundation of China(52178378) and the Research and Development Project for Scientific and Technological of China Railway Siyuan Survey and Design Group Co., Ltd., (2020K143).

Abstract: To ensure the construction safety of super-large rectangular pipe jacking shield tunnel adjacent to the high-speed railway, based on an actual railway related project, the safety of super-large rectangular pipe jacking shield close to high-speed railway in soft stratum is studied. The results show that the track settlement and pipe segment safety factor far exceed the control threshold during the construction, so the reinforcement scheme must be adopted. The track settlement can be reduced by 58.20% and the minimum safety factor of pipe segment can be increased to 1.35 by adopting advance grouting scheme. Using manually dug pile and D-shaped beam can reduce the track settlement by 63.05% and increase the minimum safety factor to 9.49. After adopting the pile-plate reinforcement scheme, the track settlement can be reduced by 70.90% and the minimum safety factor can be increased to 9.00. The reinforced effects of manually dug pile and D-shaped beam scheme and pile-plate scheme is significantly better than that of advance grouting. It is recommended to adopt the pile-plate scheme in the section under the high-speed railway to be built, and the manually dug pile and D-shaped beam scheme in the section under the existing high-speed railway. The on-site monitoring results show that the maximum surface settlement caused by pipe jacking tunneling is 3.25 mm after the super-large rectangular pipe jacking shield passes through the Fuzhou-Xiamen railway section to be built. After the manually dug pile and D-shaped beam is adopted for the existing Hangzhou-Shenzhen section, the maximum settlement of the high-speed railway track is only 1.65 mm. Both track settlement and surface settlement are far less than the settlement threshold. The super-large rectangular pipe jacking shield successfully crosses the Fuzhou-Xiamen Railway and Hangzhou-Shenzhen Railway. The research conclusion can provide reference for similar large-scale tunnel proximity engineering.

Key words: tunnel engineering, rectangular pipe jacking shield tunnel, approach construction, reinforcement scheme, weak stratum

CLC Number: 

  • TU457
[1] DONG Jian-hua, XU Bin, WU Xiao-lei, LIAN Bo, . Elastic-plastic deformation of surrounding rocks under graded yielding support of tunnel [J]. Rock and Soil Mechanics, 2022, 43(8): 2123-2135.
[2] ZHOU Guang-xin, SHENG Qian, CUI Zhen, WANG Tian-qiang, MA Ya-li-na, FU Xing-wei, . Model test of failure mechanism of tunnel with flexible joint crossing active fault under strike-slip fault dislocation [J]. Rock and Soil Mechanics, 2022, 43(1): 37-50.
[3] SONG Zhan-ping, GUO De-sai, XU Tian, HUA Wei-xiong, . Risk assessment model in TBM construction based on nonlinear fuzzy analytic hierarchy process [J]. Rock and Soil Mechanics, 2021, 42(5): 1424-1433.
[4] LIU Yang, LIU Wei, SHI Pei-xin, ZHAO Yu, WANG Miao, . Local instability analysis of the ultra-deep wall-to-slotted in water rich soft layer [J]. Rock and Soil Mechanics, 2020, 41(S1): 9-18.
[5] YAN Jian, HE Chuan, YAN Qi-xiang, XU Jin-hua, . In-situ test and calculational analysis on frost heaving force of moraine stratum in Que’er moutain tunnel [J]. Rock and Soil Mechanics, 2019, 40(9): 3593-3602.
[6] YU Zheng, YANG Long-cai, ZHANG Yong, ZHAO Wei, . Uncertainty analysis of tunnel surrounding rock deformation considering consistency of geological heterogeneity features [J]. Rock and Soil Mechanics, 2019, 40(5): 1947-1956.
[7] YAN Jian, HE Chuan, WANG Bo, MENG Wei, . Influence of high geotemperature on rockburst occurrence in tunnel [J]. Rock and Soil Mechanics, 2019, 40(4): 1543-1550.
[8] WANG Jian-feng, LI Tian-bin, MA Chun-chi, ZHANG Hang, HAN Yu-xuan, ZHOU Xiong-hua, JIANG Yu-peng, . Gravitational search algorithm based microseismic positioning in tunnel surrounding rock [J]. Rock and Soil Mechanics, 2019, 40(11): 4421-4428.
[9] YAN Gao-ming, SHEN Yu-sheng, GAO Bo, ZHENG Qing, FAN Kai-xiang, HUANG Hai-feng. Experimental study of stick-slip fault crossing segmental tunnels with joints [J]. Rock and Soil Mechanics, 2019, 40(11): 4450-4458.
[10] GU Shuan-cheng, ZHOU Pan, HUANG Rong-bin. Stability analysis of tunnel supported by bolt-surrounding rock bearing structure [J]. , 2018, 39(S1): 122-130.
[11] LI Xiao-fei, SUN Jiang-tao, CHEN Wei-zhong, YUAN Jing-qiang, LIU Jin-quan, ZHANG Qing-yan,. Strength and anti-washout property of fiber silica fume cement grout [J]. , 2018, 39(9): 3157-3163.
[12] LIU Cong, LI Shu-cai, ZHOU Zong-qing, LI Li-ping, WANG Kang,HOU Fu-jin, QIN Cheng-shuai, GAO Cheng-lu,. Model test on mechanical characteristics of surrounding rock during construction process of super-large section tunnel in complex strata [J]. , 2018, 39(9): 3495-3504.
[13] LI Tao, XU Nu-wen, DAI Feng, LI Tian-bin, FAN Yi-lin, LI Biao,. Stability analysis of left bank abutment slope at Baihetan hydropower station subjected to excavation [J]. , 2018, 39(2): 665-674.
[14] TENG Jun-yang, ZHANG Yu-ning, TANG Jian-xin, ZHANG Chuang, LI Chen-lin, . Experimental study on shear behavior of jointed rock mass with anchorage mode [J]. , 2017, 38(8): 2279-2285.
[15] LAI Jin-xing ,FAN Hao-bo ,LAI Hong-peng ,XIE Yong-li ,HU Zhao ,QIU Jun-ling ,CAO Ning-quan,. In-situ monitoring and analysis of tunnel deformation law in weak loess [J]. , 2015, 36(7): 2003-2012.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] ZHAO Ming-hua, LIU Xiao-ping, HUANG Li-kui. Study of characteristics of seepage of roadbed’s fissures[J]. , 2009, 30(10): 3122 -3126 .
[2] GUAN Ling-li, TIAN Hong-ming, CHEN Wei-zhong. Research on mechanical properties of coal and its application[J]. , 2009, 30(12): 3715 -3719 .
[3] HE Fa-guo, CHEN Wen-wu, HAN Wen-feng, ZHANG Jing-ke. Correlation of microstructure indices and performance of sand solidified with polymer material SH[J]. , 2009, 30(12): 3803 -3807 .
[4] GU Qiang-kang, LI Ning, HUANG Wen-guang. Research on differential settlement index of high-filled subgrade after construction in mountainous airport[J]. , 2009, 30(12): 3865 -3870 .
[5] CHAI Hua-you, WEI Chang-fu. Behavior of Rayleigh waves in media with smoothly varying stiffness profile[J]. , 2009, 30(9): 2545 -2551 .
[6] XIAO Wen-lian,LI Min,ZHAO Jin-zhou,ZHENG Ling-li,LI Li-jun. Laboratory study of stress sensitivity to permeability in tight sandstone[J]. , 2010, 31(3): 775 -779 .
[7] YANG Tao,ZHOU De-pei,MA Hui-min,ZHANG Zhong-ping. Point safety factor method for stability analysis of landslide[J]. , 2010, 31(3): 971 -975 .
[8] ZHA Fu-sheng,LIU Song-yu,DU Yan-jun,CUI Ke-rui. Prediction of matric suction of unsaturated soil based on electrical resistivity[J]. , 2010, 31(3): 1003 -1008 .
[9] WANG Gui-jie, XIE Mo-wen , QIU Cheng, ESAKI Tetsuro. Application of D-INSAR technique to landslide monitoring[J]. , 2010, 31(4): 1337 -1344 .
[10] REN Lian-wei, LIU Han-long, ZHANG Hua-dong, ZHENG Hao. Bearing capacity calculation and influence factors analysis of jet grouting soil-cement-pile strengthened pile[J]. , 2010, 31(7): 2219 -2225 .